VENKATESH NANDANVAN A WING
RG-MH-23142 · RERA P52100032749 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 5.22 crore secured on the land, in favour of IIFL HOME LOAN
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 8 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VENKATESH NANDANVAN A WING is a Others project by SANJAY DNYANOBA JAGTAP in Pune, Maharashtra, registered with MahaRERA as P52100032749 on 24 Jan 2022. Possession is promised by 31 Dec 2026. 9 of the 102 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameVENKATESH NANDANVAN A WING
- TypeOthers
- Location
- SONORI ROAD
- SASWAD
- Sasvad (M Cl)
- Purandhar
- Pune
- 412301
- Pincode412301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032749
- ReraGenie IDRG-MH-23142
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed132 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VENKATESH NANDANVAN A WING | NA | 12 | 11 | 87 | 15 | 102 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
VENKATESH NANDANVAN A WING: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | Yes | 75% |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 75% |
Parking filed129
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VENKATESH NANDANVAN A WING | NA | Rs 10.07 cr | Rs 6.99 cr |
| - | NA | Rs 13.50 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARVEZ JAMADAR |
| Architect | Parvez Jamadar Associates |
| Engineer | MAYUR GAIKWAD |
| Engineer | MAYUR MAHADEO GAIKWAD |
| Chartered Accountant | R G BHILARE |
| Chartered Accountant | Amruta vinod Ranjane |
| Partner | Role in project |
|---|---|
| SANJAY DNYANOBA JAGTAP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed132
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2 A.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: form-1 31-03-2026.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1-NANDANVAN A WING.pdf | 18 Jun 2026 |
| Withdrawal Update Form 2File: FPRM-2 31-03-2026.pdf | 18 Jun 2026 |
| Withdrawal Update Form 2File: FORM -2 NANDANVAN A WING 31-03-2026.pdf | 18 Jun 2026 |
| Withdrawal Update Form 3File: FORM-3 31-03-2026.pdf | 18 Jun 2026 |
| Withdrawal Update Form 3File: FORM-3 NANDANVAN A WING 31-03-2026.pdf | 18 Jun 2026 |
| Form 5 (FY 2025-2026)File: FORM -5 NANDANVAN A WING -2025-26.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: Form-1 Nandanvan A Wing 31-12-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 Nandanvan A Wing 31-12-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Nandanvan A wing 31-12-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Nandanvan A wing 31-12-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form -3 Nandanvan A Wing 31-12-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form -3 Nandanvan A Wing 31-12-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 Nandanvan A wing 30-09-2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 Nandanvan A wing -30-09-2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 Venkatesh Nandanvan A wing 30-09-2025.pdf | 21 Feb 2026 |
| Declaration and undertaking (Annexure A)File: ANNEXURE -A.pdf | 26 Dec 2025 |
| Withdrawal Update Form 1File: 30-06-2025_Arch_certificate_New_format-Form_1_WING_A_SASWAD_-2.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Form -2 Engineers Certificate 30-06-2025.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: Form-3 nandanvanA wing 30-06-2025.pdf | 11 Oct 2025 |
| Form 1File: form-1 nandanvan -31-3-2025.pdf | 12 Jun 2025 |
| Form 2File: Form no 2 venkatesh nandanvan 31-03-2025.pdf | 12 Jun 2025 |
| Form 3File: Form no -3 nandanvan a wing -31-03-2025.pdf | 12 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure Nandanvan A Wing 31-03-2025.pdf | 12 Jun 2025 |
| Form 2A (FY 2024-2025) | 12 Jun 2025 |
| Form 5 (FY 2024-2025)File: Form-5 nandanvan A wing -2024-25.pdf | 12 Jun 2025 |
| Form 1File: Form -1 Nandanvan A wing -30-06-2024.pdf | 26 May 2025 |
| Form 2File: Form no 2 Nandanvan - A wing 30-06-2024.pdf | 26 May 2025 |
| Form 3File: Form -3 Nandanvan A wing -30-06-2024.pdf | 26 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure Nandanvan A Wing 30-06-2024.pdf | 26 May 2025 |
| Form 1File: Form -1 Nandanvan A wing -30-09-2024.pdf | 26 May 2025 |
| Form 2File: Form no 2 Nandanvan -A wing 30-09-2024.pdf | 26 May 2025 |
| Form 3File: Form-3 nandanvan A wing -30-09-2024.pdf | 26 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure Nandanvan A Wing 30-09-2024.pdf | 26 May 2025 |
| Form 1File: Form -1 Nandanvan A wing -31-12-2024.pdf | 26 May 2025 |
| Form 2File: Form no 2 Nandanvan - A wing 31-12-2024.pdf | 26 May 2025 |
| Form 3File: FORM NO -3 NANDANVAN A WING 31-12-2024.pdf | 26 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure Nandanvan A Wing 31-12-2024.pdf | 26 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 31-03-2022.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 30-06-2022.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 30-09-2022.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 31-12-2022.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 31-03-2023.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 30-06-2023.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 30-09-2023.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 31-12-2023.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 31-03-2024.pdf | 8 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1-A'WING 31-12-2021.pdf | 8 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES.pdf | 5 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 5 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT OF ALLOTMENT LETTER.pdf | 5 Nov 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES.pdf | 5 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: MODEL COPY OF AGREEMENT.pdf | 5 Nov 2024 |
| Proforma of Agreement for saleFile: SAMPLE_DRAFTA_WING.pdf | 5 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER OF INTERST.pdf | 5 Nov 2024 |
| Layout approvalFile: 1.pdf | 4 Nov 2024 |
| Building plan approvalFile: 2.pdf | 4 Nov 2024 |
| Building plan approvalFile: 3.pdf | 4 Nov 2024 |
| Building plan approvalFile: 4.pdf | 4 Nov 2024 |
| Building plan approvalFile: 5.pdf | 4 Nov 2024 |
| Building plan approvalFile: 6.pdf | 4 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 4 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: BANK DECLARATION.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-3 (2022-23) (1)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt -1(2024-25) (1)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt -4(2023-24) (2)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-3(2023-24)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-2(2023-24) (1)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-1(2023-24)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-4 (2022-23)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-2(2022-23)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-1(2022-23)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A Wing Qrt-4(2021-22)_compressed.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -A wing Qrt-3(2021-22)_compressed.pdf | 2 Nov 2024 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Venkatesh PushpakalaP52100020045 | Saswad, Pune | 44 | Mar 2019 | Completed | Dec 2026 | Jul 2020 |
| VENKATESH NANDANVAN B WINGP52100026486 | Saswad, Pune | - | Sep 2020 | Completed | Jun 2026 | May 2023 |
| Venkatesh Paradise B wingP52100001428 | BUND GARDEN ROAD, Pune | - | Jul 2017 | Completed | Dec 2023 | May 2021 |
| Swapnanagari L BuildingP52100001447 | Bund Garden, Pune | - | Jul 2017 | Completed | Dec 2022 | Jun 2019 |
| VENKATESH NANDANVAN D WINGP52100009712 | Sasvad (M Cl), Pune | - | Aug 2017 | Completed | Mar 2021 | Nov 2018 |
| VENKATESH NANDANVAN C WINGP52100011768 | Sasvad (M Cl), Pune | - | Aug 2017 | Completed | Mar 2021 | Jun 2019 |
| Venkatesh Paradise A WingP52100001162 | Pisoli, Pune | - | Jul 2017 | Completed | Dec 2018 | Aug 2017 |
| Swapnanagari Phase 1P52100002791 | Sasvad (M Cl), Pune | - | Aug 2017 | Certificate Signed | Dec 2018 | Jun 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 132 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VENKATESH NANDANVAN A WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SASWAD13,700+ in Pune
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
Priyvardhini Bildcon
Priyvardhini Bildcon LLP
Wonder County
GREEN COLLIS LLP
Kanishka Grand Plaza
Platinum Lifespace Developers
NARAYAN BAUG
HBCL INFRA
Passport
Urban Realty
Shapoorji Pallonji Treetopia Phase 1
Manjri Horse Breeders' Farm Private Limite
Builder: SANJAY DNYANOBA JAGTAP
SANJAY DNYANOBA JAGTAP has 9 registrations on MahaRERA, including Venkatesh Paradise A Wing and Venkatesh Paradise B wing. Its filings disclose 10 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VENKATESH NANDANVAN A WING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VENKATESH NANDANVAN A WING?
The registered promoter entity is SANJAY DNYANOBA JAGTAP, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VENKATESH NANDANVAN A WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VENKATESH NANDANVAN A WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VENKATESH NANDANVAN A WING?
The professionals named in the filing: Architect: PARVEZ JAMADAR; Architect: Parvez Jamadar Associates; Engineer: MAYUR GAIKWAD; Engineer: MAYUR MAHADEO GAIKWAD; Chartered Accountant: R G BHILARE; Chartered Accountant: Amruta vinod Ranjane. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VENKATESH NANDANVAN A WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback