ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Wonder County

Registered No litigation declared Plotted project

Wonder County

By GREEN COLLIS LLP

RG-MH-22273 · RERA P52100032072 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 48 months from the original
127 of 183Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

Wonder County is a Plotted project by GREEN COLLIS LLP in Pune, Maharashtra, registered with MahaRERA as P52100032072 on 3 Dec 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 48 months from the original filing. 56 of the 183 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.

At a glance

Project

  • NameWonder County
  • TypePlotted
  • Location
    • Saswad Road
    • Near Saswad Bhopdev Road
    • Bopgaon
    • Purandhar
    • Pune
    • 412301
  • Pincode412301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032072
  • ReraGenie IDRG-MH-22273

Builder

  • NameGREEN COLLIS LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAZ-8251
  • GSTIN27AAYFM7110R1ZC

Key dates

this monthRegisteredDec 2021First promiseDec 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Dec 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2024)
  • BuildingsNot stated in filing
  • Documents filed151 files

Current status

31%56 of 183 units booked

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes75%
Street LightingYes90%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area51,992 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jun 2026
LandownerVillageDistrict
ASHOK NARAYAN BHOSLEWakadPune
PRATIKSHA ASHOK BHOSLEWakadPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Developement Authority
Permissible FSI73630.56
Proposed, not sanctioned73,631 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectInsignis Architecture
EngineerRajesh Choudhari
EngineerPandurang Kumbharkar
Chartered AccountantAbhijeet Mundada
Chartered AccountantAgrawal Oswal & Associates
Chartered AccountantS.B. GOYANKA & ASSOCIATES
PartnerRole in project
GREEN COLLIS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09062621284Dec 2024 → Dec 2028

Reason as filed by the promoterAdministrative & Approval Delays • in obtaining layout approval from local authorities. • Delay in receiving necessary permissions/NOCs from government departments. • Changes in project scope or layout after commencement. • Delay in approval of drawings and technical specifications. Land & Site Related Issues • Land acquisition or ownership disputes. • Encroachment removal taking longer than anticipated. • Unforeseen site conditions requiring additional development work. • Boundary demarcation and survey-related delays. Infrastructure Development Delays • Delay in construction of internal road

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601102Surjo Samiran BanerjeeMaple Promoters and Builders28/02/2026
CC12601164SANDEEP ASHOK JADHAVMaple Promoters and Builders03/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Jan 2025

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2a Wonder County.pdf13 Jul 2026
Form 5 (FY 2025-2026)File: FORM 5 2025-26 (1).pdf13 Jul 2026
Withdrawal Update Form 1File: 30092025 Architects Certificate Form 1.pdf11 Jul 2026
Withdrawal Update Form 1File: Architect Certicate 31122025.pdf11 Jul 2026
Withdrawal Update Form 1File: Architect Certificate 31032026.pdf11 Jul 2026
Withdrawal Update Form 1File: Architect Certificate 31032026.pdf11 Jul 2026
Withdrawal Update Form 1File: Architect Certificate Wonder County.pdf11 Jul 2026
Withdrawal Update Form 1File: Architect Certificate Wonder County.pdf11 Jul 2026
Withdrawal Update Form 2File: 30092025 Engineers Certificate Form 2.pdf11 Jul 2026
Withdrawal Update Form 2File: Engineering Certicate 31122025.pdf11 Jul 2026
Withdrawal Update Form 2File: Engineering Certificate 31032026.pdf11 Jul 2026
Withdrawal Update Form 2File: Engineering Certificate 31032026.pdf11 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Wonder County.pdf11 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Wonder County.pdf11 Jul 2026
Withdrawal Update Form 3File: FORM3-Q2-25-26.pdf11 Jul 2026
Withdrawal Update Form 3File: FORM 3 Q3-25-26.pdf11 Jul 2026
Withdrawal Update Form 3File: FORM 3-Q4-25-26-WONDER COUNTY.pdf11 Jul 2026
Withdrawal Update Form 3File: FORM 3-Q4-25-26-WONDER COUNTY.pdf11 Jul 2026
Withdrawal Update Form 3File: FORM 3-Q1-26-27.pdf11 Jul 2026
Withdrawal Update Form 3File: FORM 3-Q1-26-27.pdf11 Jul 2026
Form 1File: 31032025 Architects Certificate Form 1.pdf10 Jul 2026
Form 2File: 31032025 Engineers Certificate Form 2.pdf10 Jul 2026
Form 3File: 31032025 Form 3.pdf10 Jul 2026
Disclosure of Sold and Booked InventoryFile: 31032025 Sold_Unsold for Rera.pdf10 Jul 2026
Withdrawal Update Form 1File: Architect certificate.pdf10 Jul 2026
Withdrawal Update Form 1File: 30062025 Architects Certificate Form 1.pdf10 Jul 2026
Withdrawal Update Form 1File: 30062025 Architects Certificate Form 1.pdf10 Jul 2026
Withdrawal Update Form 2File: Engineering certicate30062024 _page-0001.pdf10 Jul 2026
Withdrawal Update Form 2File: 30062025 Engineers Certificate Form 2.pdf10 Jul 2026
Withdrawal Update Form 2File: 30062025 Engineers Certificate Form 2.pdf10 Jul 2026
Withdrawal Update Form 3File: FORM 3-Q4-25-26-WONDER COUNTY.pdf10 Jul 2026
Withdrawal Update Form 3File: 30062025 Form 3.pdf10 Jul 2026
Withdrawal Update Form 3File: 30062025 Form 3.pdf10 Jul 2026
Form 1File: 31122021 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 31122021 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 31122021 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 31122021 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 31032022 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 31032022 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 31032022 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 31032022 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 30062022 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 30062022 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 30062022 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 30062022 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 30092022 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 30092022 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 30092022 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 30092022 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 31122022 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 31122022 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 31122022 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 31122022 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 31032023 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 31032023 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 31032023 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 31032023 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 30062023 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 30062023 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 30062023 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 30062023 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 30092023 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 30092023 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 30092023 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 30092023 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 31122023 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 31122023 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 31122023 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 31122023 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 31032024 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 31032024 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 31032024 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 31032024 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 30062024 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 30062024 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 30062024 Form 3.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: 30062024 Sold_Unsold for Rera.pdf13 May 2026
Form 1File: 30092024 Architects Certificate Form 1.pdf13 May 2026
Form 2File: 30092024 Engineers Certificate Form 2.pdf13 May 2026
Form 3File: 30092024 Form 3.pdf13 May 2026

How this compares with Pune

31%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Wonder County on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Saswad Bhopdev Road13,700+ in Pune

Builder: GREEN COLLIS LLP

GREEN COLLIS LLP has 1 registration on MahaRERA, including Wonder County. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Wonder County is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Wonder County?

The registered promoter entity is GREEN COLLIS LLP, a limited liability partnership as per the filing. Its LLPIN AAZ-8251 and GSTIN 27AAYFM7110R1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Wonder County?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Wonder County?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Wonder County?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Wonder County?

The professionals named in the filing: Architect: Insignis Architecture; Engineer: Rajesh Choudhari; Engineer: Pandurang Kumbharkar; Chartered Accountant: Abhijeet Mundada; Chartered Accountant: Agrawal Oswal & Associates; Chartered Accountant: S.B. GOYANKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Wonder County?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Wonder County. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Wonder County to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.