ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / VENKATESH LAKE ORCHID

Completed No litigation declared Others project

VENKATESH LAKE ORCHID

By SHREE VENKATESH BUILDCON PVT LTD

RG-MH-08311 · RERA P52100000977 · Last updated on MahaRERA portal: 21 Jan 2019

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 23 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 20 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
19 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

VENKATESH LAKE ORCHID is a Others project by SHREE VENKATESH BUILDCON PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100000977 on 25 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018.

At a glance

Project

  • NameVENKATESH LAKE ORCHID
  • TypeOthers
  • Location
    • DATTANAGAR JAMBHULWADI ROAD
    • AMBEGAON KHURD
    • AMBEGAON KH
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000977
  • ReraGenie IDRG-MH-08311

Builder

  • NameSHREE VENKATESH BUILDCON PVT LTD
  • Entity typeCompany
  • CINU45200PN2008PTC132398
  • GSTIN27AANCS1902K1Z5
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorANKUSH BHIMRAO ASABE
  • Other registrations20 more →
  • Completed12 of 21
  • Past their filed date2
  • Declared earlier projects26 →

Key dates

this monthRegisteredJul 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jul 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings2 building records
  • Documents filed143 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA130000
B WINGNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Jan 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 21 Jan 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
OWC PLANTYes100%

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered40
Open Space38
BuildingClosed/CoveredOpen SpaceTotal
A WING403070
B WING088

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,600 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6194.0
Proposed, not sanctioned6,194 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch562/7 RIVER VIEW APARTMENT OPP SAVARKAR BHAVAN SHIVAJI NAGAR PUNE 411005

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL U HINGMIRE
EngineerPARAG CHOPDA
PartnerRole in project
SHREE VENKATESH BUILDCON PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2AFile: FORM 2A QUALITY ASSURANCE ORCHID.pdf21 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: REVISED COMMENCEMENT CERTIFICATE.pdf11 Jan 2019
OtherFile: Declaration for changes of carpet area units.pdf11 Jan 2019
Certificates of CA (Form 5)File: Form 5 CA Certificate Lake Orchid.pdf28 Dec 2018
Certificates of Architect (Form 4)File: FORM -4 Architect Certiticate Lake Orchid-27122018.pdf28 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Supplimentry deed of declaration Orchid -1-10.pdf28 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Supplimentry deed of declaration Orchid -11-20.pdf28 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Supplimentry deed of declaration Orchid -21-28.pdf28 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Supplimentry deed of declaration Orchid -28-37.pdf28 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Supplimentry deed of declaration Orchid -38-48.pdf28 Dec 2018
OtherFile: Completion Certificate Wing B.pdf28 Dec 2018
Layout approvalFile: 1-11.pdf27 Dec 2018
Building plan approvalFile: 2-11.pdf27 Dec 2018
Building plan approvalFile: 3-11.pdf27 Dec 2018
Building plan approvalFile: 4-11.pdf27 Dec 2018
Building plan approvalFile: 5-11.pdf27 Dec 2018
Building plan approvalFile: 6-11.pdf27 Dec 2018
Building plan approvalFile: 7-11.pdf27 Dec 2018
Building plan approvalFile: 8-11.pdf27 Dec 2018
Building plan approvalFile: 9-11.pdf27 Dec 2018
Building plan approvalFile: 10-11.pdf27 Dec 2018
Building plan approvalFile: 11-11.pdf27 Dec 2018
Copy of Layout Approval (in case of layout)File: 1-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 2-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 3-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 4-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 5-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 6-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 7-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 8-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 9-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 10-11.pdf27 Dec 2018
Building Plan Approval (IOD)File: 11-11.pdf27 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: cc-2796-18.pdf27 Dec 2018
Certificates of CA (Form 5)File: Form 5 Venkatesh Lake Orchid.pdf27 Sep 2018
Building plan approvalFile: LAKE ORCHID 1-11.pdf18 Jul 2018
Building plan approvalFile: PLAN (2).pdf18 Jul 2018
Building plan approvalFile: PLAN (3).pdf18 Jul 2018
Building plan approvalFile: PLAN (4).pdf18 Jul 2018
Building plan approvalFile: PLAN (5).pdf18 Jul 2018
Building plan approvalFile: PLAN (6).pdf18 Jul 2018
Building plan approvalFile: PLAN (7).pdf18 Jul 2018
Building plan approvalFile: PLAN (8).pdf18 Jul 2018
Building plan approvalFile: PLAN (9).pdf18 Jul 2018
Building plan approvalFile: LAKE ORCHID 10-11.pdf18 Jul 2018
Building plan approvalFile: LAKE ORCHID 11-11.pdf18 Jul 2018
Building Plan Approval (IOD)File: LAKE ORCHID 1-11.pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (2).pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (3).pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (4).pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (5).pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (6).pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (7).pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (8).pdf18 Jul 2018
Building Plan Approval (IOD)File: PLAN (9).pdf18 Jul 2018
Building Plan Approval (IOD)File: LAKE ORCHID 10-11.pdf18 Jul 2018
Building Plan Approval (IOD)File: LAKE ORCHID 11-11.pdf18 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENT CERTITICATE BY PMC LAKE ORCHID 0977.pdf18 Jul 2018
Status of ConveyanceFile: SUPPLIMENTRY DEED LAKE ORCHID DEED OF DECLARATION.pdf18 Jul 2018
OtherFile: PART COMPLETION LAKE ORCHID A WING.pdf10 Jul 2018
OtherFile: Completion Wing A final.pdf10 Jul 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed of Declaration Lake Orchid 1-45.pdf26 May 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed of Declaration Lake Orchid 46-90.pdf26 May 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed of Declaration Lake Orchid 91-125.pdf26 May 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed of Declaration Lake Orchid 126-160.pdf26 May 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed of Declaration Lake Orchid 161-181.pdf26 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement certiticates 1.pdf10 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2.pdf10 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: PMRDA CC 3.pdf10 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Commence Certificate 4.pdf10 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate 4102017.pdf24 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate lAKE ORCHID.pdf24 Oct 2017
Certificates of CA (Form 3)File: CA Certificate LAKE ORCHID.pdf24 Oct 2017
Certificates of CA (Form 3)File: CA Certificate LAKE ORCHID.pdf24 Oct 2017
Layout approvalFile: 1-10.pdf30 Aug 2017
Building plan approvalFile: 2-10.pdf30 Aug 2017
Building plan approvalFile: 3-10.pdf30 Aug 2017
Building plan approvalFile: 4-10.pdf30 Aug 2017
Building plan approvalFile: 5-10.pdf30 Aug 2017
Building plan approvalFile: 6-10.pdf30 Aug 2017

Promoter's earlier projects23

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

23 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VENKATESH GRAFFITI ELAN PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036124CompletedJun 2024Sep 2023
VENKATESH GRAFFITI ELAN PHASE 1Sr No 32 2B Manjiri Mundhwa Road Keshav Nagar Mundhwa PUNE 411036125CompletedMay 2024Sep 2023
VENKATESH GRAFFITI GLOVER PHASE 3 - MHADAMUNDHWA MANJIRI ROAD KESHAV NAGAR MUNDHWA PUNE 41103660CompletedSep 2023Aug 2023
VENKATESH GRAFFITI ELITE PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036101CompletedDec 2022Jun 2021
Venkatesh Graffiti Elite Phase 1Sr 31 2 2B Beside Venkatesh Graffiti Open Space 1 Mundhwa Manjari Rd Keshav Nagar PUNE 41103690CompletedAug 2022Nov 2020
VENKATESH GRAFFITI PHASE 6MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036168CompletedDec 2021Jun 2021
VENKATESH NAVITA101 by 7 AMBEGAON KHURD PUNE 411046174CompletedDec 2021Jun 2021
VENKATESH GRAFFITI PHASE 5MUNDHWA MANJARI ROAD KESHAV NAGAR MUNDHWA PUNE 411036104CompletedMar 2021Feb 2020
VENKATESH GRAFFITI PHASE 4MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036100CompletedJul 2020Mar 2019
VENKATESH JOYNEST PHASE - 5PUNE SOLAPUR ROAD LONI KALBHOR PUNE 41220139CompletedMar 2020Dec 2019
VENKATESH JOYNEST PHASE 4PUNE SOLAPUR HIGHWAY LONI KALBHOR PUNE 41220143CompletedDec 2019Nov 2019
VENKATESH GRAFFITI PHASE 3MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 41103664CompletedDec 2019Oct 2018
VENKATESH JOYNEST PHASE 3PUNE SOLAPUR ROAD LONI KALBHOR PUNE 41220186CompletedSep 2019May 2019
VENKATESH LAKE ORCHIDDATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046127CompletedDec 2018Dec 2018
VENKATESH GRAFFITI PHASE 2MUNDHWA MANJARI ROAD KESHAVNAGAR MUNDHWA PUNE 411036174CompletedDec 2018Jan 2018
VENKATESH LAKE LIFE PHASE 1Venkatesh Lake Life Road Ambegaon Kh Pune 411046189CompletedJun 2018Jun 2018
Venkatesh Joynest Phase 2LONI KALBHOR PUNE 41220143CompletedMay 2018Feb 2018
VENKATESH GRAFFITI PHASE 7KESHAVNAGAR MUNDHWA MANJARI ROAD PUNE 41103628CompletedMar 2018Jan 2018
VENKATESH JOYNEST PHASE 1GAT NO 33 PLUS 34 2 LONI KALBHOR PUNE137CompletedJul 2017Mar 2017
VENKATESH GRAFFITI PHASE 1SR NO 31 PLUS 35 PART KESHAV NAGAR MUNDHWA PUNE 411036358CompletedJul 2017Apr 2017
VENKATESH LAKE VISTASR NO 8 PLUS 9 PART DATTANAGAR JAMBHULWADI ROAD AMBEGAON KHURD PUNE 411046672CompletedDec 2015Feb 2015
VENKATESH BILVAS NO 51 2 2B PLUS 3 DHAYARI GOAN PUNE 41104173CompletedDec 2014Jul 2014
VENKATESH SHARVILSR NO 26 PART DHAYARI PUNE 411041186CompletedMar 2014Jul 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VENKATESH LAKE ORCHID on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON KHURD13,700+ in Pune

2 kmVENKATESH LAKE ORCHIDCompleted 75Lapsed / revoked 30Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: SHREE VENKATESH BUILDCON PVT LTD

SHREE VENKATESH BUILDCON PVT LTD has 21 registrations on MahaRERA, including VENKATESH GRAFFITI PHASE 2 and VENKATESH LAKE ORCHID. Its filings disclose 26 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VENKATESH LAKE ORCHID is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VENKATESH LAKE ORCHID?

The registered promoter entity is SHREE VENKATESH BUILDCON PVT LTD, a company as per the filing. Its CIN U45200PN2008PTC132398 and GSTIN 27AANCS1902K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VENKATESH LAKE ORCHID?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VENKATESH LAKE ORCHID?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VENKATESH LAKE ORCHID?

The professionals named in the filing: Architect: SUNIL U HINGMIRE; Engineer: PARAG CHOPDA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VENKATESH LAKE ORCHID?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VENKATESH LAKE ORCHID. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VENKATESH LAKE ORCHID to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.