VEDRAJ ELITE

By Sadguru Buildcon

RG-MH-14952 · RERA P51600033270 · Last updated on MahaRERA portal: 7 May 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
1Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

VEDRAJ ELITE is a Residential / Group Housing project by Sadguru Buildcon in Nashik, Maharashtra, registered with MahaRERA as P51600033270 on 15 Feb 2022. The registration is recorded completed; possession was promised by 15 Apr 2025. The completion date has moved by 7 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVEDRAJ ELITE
  • TypeResidential / Group Housing
  • Location
    • AMRUTDHAM LINK ROAD
    • TARWALA NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422004
  • Pincode422004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600033270
  • ReraGenie IDRG-MH-14952

Builder

  • NameSadguru Buildcon
  • Entity typePartnership
  • PartnersJAYESH PRAKASH PAGAR, Monali Satish Wagh

Key dates

this monthRegisteredFeb 2022First promiseSep 2024Revised toApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Feb 2022
  • Promised completion15 Apr 2025
  • Revised completionRevised to 15 Apr 2025 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VEDRAJ ELITENA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

VEDRAJ ELITE: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 7 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area784 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Sep 2024

Approvals and building plan

Permissible FSI2581.73
Proposed, not sanctioned2,582 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFIRST FLOOR SAUBHAGYA MANGAL KARYALAY MHASRUL DINDORI ROAD MHASRUL NASHIK 422004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Sanjay Kolhe
EngineerShubham Satpute
Chartered AccountantCA Kiran Sagore
Chartered AccountantMKHS AND ASSOCIATES
PartnerRole in project
Sadguru Buildcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600025026Sep 2024 → Apr 2025

Reason as filed by the promoterRespected Sir, I the promoter hereby requesting a extension for the project till 15/04/2025, Since I have obtained the full occupancy as on 15.04.2025 for the project and the same has been uploaded to the portal. The delay is due to NMC compliances and receipt of OC from the NMC and not at the promoter end. We request you to kindly extend the project completion date to 15-04-2025.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501231Swapnil Vijaysing GhorpadeSadguru Buildcon14/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 May 2025

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: FORM B Affidavit Developer.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf7 May 2025
Declaration in FORM BFile: Form B Extension new.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert sep 24.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Dec 24.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Mar 25.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Mar 25 Final.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Mar 25 Final.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 24.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 25.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30 09 24.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 12 24.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 03 25.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf3 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Vedraj bliss.pdf2 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Vedraj bliss.pdf2 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Vedraj bliss.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate DEC23.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate MAR 24 Signed.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate June 24.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate as on Dec 2023 Signed_compressed.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar 2024 Signed_compressed.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24 Signed_compressed.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Dec 23.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Mar 24 Signed.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June 2024 Singed.pdf9 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Form 2A- 23-24 Signed.pdf9 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A- 21-22.pdf12 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Form 2A- 22-23.pdf12 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sadguru Rera audit 21-22.pdf12 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sadguru Rera Audit 22-23.pdf12 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 23.pdf27 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 23.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certi Sep 23 Final.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 23.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 23.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Certi June 23 Final.pdf25 Oct 2023
Building plan approvalFile: Vedraj Elite Revised Approved plan_compressed.pdf16 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Vedraj Elite Revised Approved plan_compressed.pdf16 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Vedraj Elite.pdf23 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Vedraj Elite.pdf23 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certi Mar 23 Final.pdf20 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sadguru Buildcon CA_11zon.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2022.pdf5 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2022.pdf5 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2022.pdf5 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sep 2022.pdf5 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 2022.pdf5 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 22.pdf5 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 22.pdf5 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 22.pdf5 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 22.pdf5 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certi March 22 final.pdf5 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certi June 22 Final.pdf5 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certi Sep 22 Final.pdf5 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certi Dec 22 Final.pdf5 Feb 2023
Layout approvalFile: Layout Sadguru.pdf9 Feb 2022
Copy of Layout Approval (in case of layout)File: Layout Sadguru.pdf9 Feb 2022
Building plan approvalFile: Sanction Plan Sadguru Buildcon Part 1.pdf6 Feb 2022
Building plan approvalFile: Sanction Plan Sadguru Buildcon Part 2.pdf6 Feb 2022
PAN CardFile: PAN Sadguru Buildcon.pdf6 Feb 2022
Copy of the legal title reportFile: Title Report Sadguru Buildcon.pdf6 Feb 2022
Details of encumbrancesFile: No Encumbrances.pdf6 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Sadguru Buildcon Part 1.pdf6 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Sadguru Buildcon Part 2.pdf6 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Sadguru.pdf6 Feb 2022
Declaration about Commencement CertificateFile: Format D - Vedraj elite.pdf6 Feb 2022
Declaration in FORM BFile: Form B - Vedraj Elite.pdf6 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200229651363_For_Asset_Based_Search_06_02_2022_20_15_31_736.pdf6 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sadguru CA Cert Final New.pdf6 Feb 2022
Proforma of Allotment letterFile: Agreement For Sale - Sadguru Buildcon Partnership Firm.pdf6 Feb 2022
Proforma of Allotment letterFile: Allottment Letter - Vedraj Elite.pdf6 Feb 2022

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 7 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VEDRAJ ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TARWALA NAGAR4,100+ in Nashik

2 kmVEDRAJ ELITECompleted 58Lapsed / revoked 10Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 122 registered projects within 2 km.

Builder: Sadguru Buildcon

Sadguru Buildcon has 1 registration on MahaRERA, including VEDRAJ ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if VEDRAJ ELITE is delayed beyond 15 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VEDRAJ ELITE?

The registered promoter entity is Sadguru Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VEDRAJ ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VEDRAJ ELITE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VEDRAJ ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VEDRAJ ELITE?

The professionals named in the filing: Architect: Arch Sanjay Kolhe; Engineer: Shubham Satpute; Chartered Accountant: CA Kiran Sagore; Chartered Accountant: MKHS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VEDRAJ ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VEDRAJ ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VEDRAJ ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.