RAMCHANDRA NAGAR
By DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS
RG-MH-85627 · RERA P51600022059 · Last updated on MahaRERA portal: 12 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAMCHANDRA NAGAR is a Others project by DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600022059 on 25 Aug 2019. Possession is promised by 30 Dec 2028. 65 of the 136 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.
At a glance
Project
- NameRAMCHANDRA NAGAR
- TypeOthers
- Location
- DINDORI ROAD
- MHASRUL
- Nashik (M Corp.)
- Nashik
- 422004
- Pincode422004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600022059
- ReraGenie IDRG-MH-85627
Builder
- NameDESHPANDE CONSTRUCTIONS & LAND DEVELOPERS
- Entity typePartnership
- PartnersSUNIL MADHAV SAWANT, DEEPAK RAMCHANDRA BAGAD, DHANANJAY DEEPAK BAGAD, SUSHIL SURYAKANT BAGAD
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Aug 2019
- Promised completion30 Dec 2028
- Revised completionNone
- Buildings4 building records
- Documents filed98 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D WING | NA | 25 | 20 | 120 | 0 | 120 |
| F WING | NA | 5 | 5 | 0 | 16 | 16 |
| C WING | NA | 4 | 4 | 0 | 0 | 0 |
| E WING | NA | 4 | 4 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.
D WING89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
F WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 16% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| D WING | 1 | 0 | 1 |
| F WING | 0 | 16 | 16 |
| C WING | 1 | 0 | 1 |
| E WING | 1 | 0 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| D WING | NA | Rs 23.10 cr | Rs 19.07 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AVINASH KOTHAVADE |
| Engineer | Jagtap chetan |
| Chartered Accountant | AASHISH ABHONKAR |
| Chartered Accountant | Ganesh Prabhakar Deore |
| Chartered Accountant | Prashant Pathak & Associates |
| Partner | Role in project |
|---|---|
| DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE DATE 20-4-2026.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: FORM -3 CHARTERED ACCOUNTS CERTIFICATE DATE 21-04-2026.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate-DCL Qtr 3.pdf | 18 Mar 2026 |
| Withdrawal Update Form 2File: DCL- Engineer Certificate Dec 2025.pdf | 18 Mar 2026 |
| Withdrawal Update Form 3File: DCL-Form 3 Dec 25.pdf | 18 Mar 2026 |
| Form 1File: Architect Certificate-DCL Qtr 3.pdf | 20 Feb 2026 |
| Form 2File: DCL- Engineer Certificate Dec 2025.pdf | 20 Feb 2026 |
| Form 3File: DCL-Form 3 Dec 25.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and Booked Inventory.pdf | 20 Feb 2026 |
| Form 1File: FORM 1 ARCHITECTS CERTIFICATE DATE 20-10-2025.pdf | 6 Dec 2025 |
| Form 2File: FORM 2 ENGINEERS CERTIFICATE DATE 20-10-2025.pdf | 6 Dec 2025 |
| Form 3File: FORM 3 DATE 31-10-2025 CA CERTIFICATE reduced.pdf | 6 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY DATE 06-12-2025.pdf | 6 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM -5 SEE REGULATION 4 DATE 30-09-2025.pdf | 3 Oct 2025 |
| Form 1File: FORM 1 ARCHITECTS CERTIFICATE DATE 20-07-2025.pdf | 26 Aug 2025 |
| Form 2File: FORM -2 ENGINEERS CERTIFICATE DATE 20-07-2025.pdf | 26 Aug 2025 |
| Form 3File: Form 3 - CA Certificate FY 2025-26 Q1.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - BOOKED INVENTORY (BUILDING WISE).pdf | 26 Aug 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DCL ARCHITECTS CERTIFICATE.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM-3 DATE 30-4-2025 1.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DATE 20-1-2025 FORM-1 ARCHTECTS CERTIFICATE .pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DATE 20-1-2025 FORM-2 ENGINEERS CERTIFICATE .pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 1 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 DATE 31-12-2024 FY 2023-24.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE DATE 19-10-2024.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE ANNEXURE FORM 3 DATE.pdf | 26 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECTS CERTIFICATE.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 12 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 10 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Q4 18-4-2024.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE.pdf | 30 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D FORM 3 CA CERTIFICATE DCL DATE.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FORM 1 DATE 30-09-2023.pdf | 6 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE FORM-2 DATE 31-3-2023.pdf | 6 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE FORM-2 DATE 30-9-2023.pdf | 6 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 .pdf | 6 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 .pdf | 6 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 31 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 New.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-19-20 ARCHITECTS CERTIFICATE.pdf | 20 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- ARCHITECTS CERTIFICATE-20-21.pdf | 20 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- ARCHITECTS CERTIFICATE - Dec 22.pdf | 20 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- ARCHITES CERTIFICATE - 21-22.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - ENGINEERS CERTIFICATE-2019-20.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- ENGINEERS CERTIFICATE - 2020-21.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- ENGINEERS CERTIFICATE- 2021-22.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- ENGINEERS CERTIFICATE-Dec 2022.pdf | 20 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM -3, 2019-20 reduce.pdf | 7 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3, 2020-21 reduce.pdf | 7 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3, 2021-22 reduce.pdf | 7 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3, 2022-23 reduce.pdf | 7 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5- 2019-20.pdf | 7 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FROM 5 2020-21.pdf | 7 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FROM 5- 2021-22.pdf | 7 Mar 2023 |
| Building plan approvalFile: Building Plan 8.pdf | 16 Nov 2022 |
| Building plan approvalFile: Building Plan 7.pdf | 16 Nov 2022 |
| Building plan approvalFile: Building Plan 6.pdf | 16 Nov 2022 |
| Building plan approvalFile: Building Plan 5.pdf | 16 Nov 2022 |
| Building plan approvalFile: Building Plan 4.pdf | 16 Nov 2022 |
| Building plan approvalFile: Building Plan 3.pdf | 16 Nov 2022 |
| Building plan approvalFile: Building Plan 2.pdf | 16 Nov 2022 |
| Building plan approvalFile: Building Plan 1-compressed.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 8.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 7.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 6.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 5.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf | 16 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1-compressed.pdf | 16 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE RAMCHANDRA NAGAR_compressed.pdf | 17 Aug 2021 |
| Declaration in FORM BFile: NOTARISED FORM B.pdf | 19 Aug 2019 |
| Declaration in FORM BFile: NOTARISED FORM B1.pdf | 19 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE2.pdf | 14 Aug 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| RAMCHANDRA NAGAR | DINDORI ROAD | 98 | Completed | Jul 2017 | Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAMCHANDRA NAGAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MHASRUL4,100+ in Nashik
Filed coordinates, straight-line distance. 97 registered projects within 2 km.
GLOBAL VILLE
SHRADDHA INFRA
PEACOCK HILLS
PEACOCK HILLS BUILDTECH LLP
The Northland by Madhu Vitthal
Northland Realty
ANANDGRAM
MAP INFRA
KRISHNA PRANIT APARTMENT
BODKE BUILDCON
AKSHAR VISHWA
AKSHAR BUILDCON
See every Nashik project, with the district possession charts
Builder: DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS
DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS has 1 registration on MahaRERA, including RAMCHANDRA NAGAR. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if RAMCHANDRA NAGAR is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAMCHANDRA NAGAR?
The registered promoter entity is DESHPANDE CONSTRUCTIONS & LAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAMCHANDRA NAGAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAMCHANDRA NAGAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAMCHANDRA NAGAR?
The professionals named in the filing: Architect: AVINASH KOTHAVADE; Engineer: Jagtap chetan; Chartered Accountant: AASHISH ABHONKAR; Chartered Accountant: Ganesh Prabhakar Deore; Chartered Accountant: Prashant Pathak & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAMCHANDRA NAGAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback