Home / Browse projects / Ratnagiri, Maharashtra / VEDANT RESIDENCY
VEDANT RESIDENCY
RG-MH-28485 · RERA P52800026337 · Last updated on MahaRERA portal: 1 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 14 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VEDANT RESIDENCY is a Others project by VEDANT CONSTRUCTION in Ratnagiri, Maharashtra, registered with MahaRERA as P52800026337 on 11 Sep 2020. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 14 months from the original filing. 16 of the 27 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameVEDANT RESIDENCY
- TypeOthers
- Location
- DAPOLI ROAD
- KALKAI MANDIR
- Bharane
- Khed
- Ratnagiri
- 415621
- Pincode415621
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800026337
- ReraGenie IDRG-MH-28485
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Sep 2020
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Jan 2025)
- Buildings1 building record
- Documents filed157 files
Current status
Figures as on 1 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VEDANT RESIDENCY | NA | 6 | 0 | 20 | 7 | 27 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.
VEDANT RESIDENCY: 63% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VEDANT CONSTRUCTION | Thane (M Corp.) | Thane |
| MADHUKAR NARAYAN DAREKAR | Tulashi Kh. | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JITESH P PAWAR & ASSOCIATES |
| Engineer | SHRAVANI CONSULTANTS CONSULTING ENGINEERS |
| Chartered Accountant | CA RAHUL N GHARAT & CO |
| Partner | Role in project |
|---|---|
| VEDANT CONSTRUCTION | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Madam, We are writing to request an extension for the project Vedant Construction at Ratnagiri due to the delay in obtaining the Occupancy Certificate (OC). Despite our efforts, the OC is pending due to: 1. Pending inspections by local authorities. We request an extension of 5 months (i.e. till 30 June 2025) to allow time for obtaining the OC and completing necessary formalities. We assure you of our commitment to resolving the issue promptly. Thank you for your understanding. Yours sincerely, Vedant Construction
Reason as filed by the promoterWe, Vedant Construction, hereby request an extension of five (5) months, until 31 December 2025, for the completion of our project at Ratnagiri, as the Occupancy Certificate (OC) is still pending due to inspections by the concerned local authorities; despite our diligent efforts to comply with all statutory requirements, the delay in obtaining the OC has been beyond our control, and we assure you of our continued commitment to resolving the matter promptly and completing all requisite formalities, and therefore seek your kind consideration and approval of this extension.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed157
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2020-2021)File: Form 2A 20 21.pdf | 1 Dec 2025 |
| Form 2A (FY 2021-2022)File: Form 2A 21 22.pdf | 1 Dec 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 22 23.pdf | 1 Dec 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 23 24.pdf | 1 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 24 25.pdf | 1 Dec 2025 |
| Form 5 (FY 2021-2022)File: Form 5 21 22.pdf | 1 Dec 2025 |
| Form 5 (FY 2022-2023)File: Form 5 22 23.pdf | 1 Dec 2025 |
| Form 5 (FY 2023-2024)File: Form 5 23 24.pdf | 1 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 24 25.pdf | 1 Dec 2025 |
| Form 5 (FY 2020-2021)File: Form 5 20 21.pdf | 1 Dec 2025 |
| Form 1File: Form 1 - Architect.pdf | 19 Sep 2025 |
| Form 2File: Form 2 - Engineer.pdf | 19 Sep 2025 |
| Form 3File: Form 3 Vedant Residency.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
| Form 3File: Form 3.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 19 Sep 2025 |
| Form 1File: Form 1.pdf | 19 Sep 2025 |
| Form 2File: Form 2.pdf | 19 Sep 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 157 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VEDANT RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KALKAI MANDIR1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
Vakratunda Apartment
Gitesh Tukaram Shinde
AAYUSH PARK
SHREE KALKAI LANDMARK
ADWAIT RESIDENCY
SHAILESH SUDHAKAR PAWAR
AMBIKA RESIDENCY
VIVEK VILAS KADAM
ANUSHREE RESIDENCY
SUCHITA SUDHAKAR PAWAR
ARYAN PLAZA
MANGESH MOHAN GOVALKAR
See every Ratnagiri project, with the district possession charts
Builder: VEDANT CONSTRUCTION
VEDANT CONSTRUCTION has 11 registrations on MahaRERA, including SHREE GOPINATH SUBLIME and GANGA KINGSTON BUILDING G. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What does it mean that VEDANT RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VEDANT RESIDENCY is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VEDANT RESIDENCY?
The registered promoter entity is VEDANT CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VEDANT RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VEDANT RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VEDANT RESIDENCY?
The professionals named in the filing: Architect: JITESH P PAWAR & ASSOCIATES; Engineer: SHRAVANI CONSULTANTS CONSULTING ENGINEERS; Chartered Accountant: CA RAHUL N GHARAT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VEDANT RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback