Home / Browse projects / Thane, Maharashtra / Vedant Millenia happiness Phase II Wing C
Vedant Millenia happiness Phase II Wing C
RG-MH-71694 · RERA P51700050205 · Last updated on MahaRERA portal: 22 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vedant Millenia happiness Phase II Wing C is a Residential / Group Housing project by MOHAN HARDASMAL THARWANI in Thane, Maharashtra, registered with MahaRERA as P51700050205 on 27 Mar 2023. Possession is promised by 31 Dec 2027. 95 of the 197 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVedant Millenia happiness Phase II Wing C
- TypeResidential / Group Housing
- Location
- Titwala
- Kalyan
- Thane
- 421605
- Pincode421605
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700050205
- ReraGenie IDRG-MH-71694
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Mar 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed123 files
Current status
Figures as on 22 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Vedant Millenia Happiness Phase II Wing C | NA | 26 | 25 | 197 | 0 | 197 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 96%.
Vedant Millenia Happiness Phase II Wing C: 46% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 96% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed268
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Vedant Millenia Happiness Phase II Wing C | NA | Rs 25.60 cr | Rs 8.96 cr |
| - | NA | Rs 6.40 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECTS INC |
| Engineer | AVANISH AND ASSOCIATES PANDEY |
| Engineer | Avanish and Associates |
| Chartered Accountant | VERHANI AND CO |
| Chartered Accountant | Atul A Shetye |
| Partner | Role in project |
|---|---|
| MOHAN HARDASMAL THARWANI | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600031 | Bhakti Achrekar | MOHAN HARDASMAL THARWANI | 09/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Feb 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 22 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 22 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 May 2026 |
| Layout approvalFile: Building Heighligted.pdf | 22 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 20 Feb 2026 |
| Commencement certificateFile: CC.pdf | 14 Feb 2026 |
| Building plan approvalFile: C Wing Building Plan.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.PDF | 14 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 14 Feb 2026 |
| Form 5 (FY 2024-2025)File: FORM 5.pdf | 24 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 21 Dec 2025 |
| Form 1File: Form 1.pdf | 19 Jul 2025 |
| Form 2File: FORM 2.pdf | 19 Jul 2025 |
| Form 3File: Form 3.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 19 Jul 2025 |
| Layout approvalFile: LAYOUT PLAN.pdf | 3 May 2025 |
| Building plan approvalFile: BLOCK PLAN.pdf | 3 May 2025 |
| Building plan approvalFile: PARKING LAYOUT.pdf | 3 May 2025 |
| Building plan approvalFile: ilovepdf_merged (2)_compressed.pdf | 3 May 2025 |
| Building plan approvalFile: ilovepdf_merged (4)_compressed.pdf | 3 May 2025 |
| Building plan approvalFile: WING C E MHADA FLOOR.pdf | 3 May 2025 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 3 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC C D.pdf | 3 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLOCK PLAN.pdf | 3 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PARKING LAYOUT.pdf | 3 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged (2)_compressed.pdf | 3 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged (4)_compressed.pdf | 3 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: WING C E MHADA FLOOR.pdf | 3 May 2025 |
| Declaration about Commencement CertificateFile: Declaration C Wing.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vedant millenia happiness (phase -II) Wing-C.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold Unsold.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VEDANT MILLENIA HAPPINESS WING C.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 17 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 20 Apr 2024 |
| Proforma of Agreement for saleFile: millenia -C (1)lates.pdf | 15 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report APR MILLENIA C WING.pdf | 15 Apr 2024 |
| Proforma of Agreement for saleFile: declaration 180324.pdf | 22 Mar 2024 |
| Layout approvalFile: LAYOUT PLAN DT-12-02-2024.pdf | 13 Feb 2024 |
| Building plan approvalFile: B,C -FLOOR PLAN -02-DT-12-02-2024.pdf | 13 Feb 2024 |
| Building plan approvalFile: B,C -FLOOR PLAN DT-12-02-2024.pdf | 13 Feb 2024 |
| Building plan approvalFile: B,C -FLOOR PLAN-03- DT-12-02-2024.pdf | 13 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN DT-12-02-2024.pdf | 13 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B,C -FLOOR PLAN -02-DT-12-02-2024.pdf | 13 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B,C -FLOOR PLAN DT-12-02-2024.pdf | 13 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B,C -FLOOR PLAN-03- DT-12-02-2024.pdf | 13 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 13 Feb 2024 |
| Declaration about Commencement CertificateFile: Format D.PDF | 13 Feb 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER 2.pdf | 23 Jan 2024 |
| Other - LegalFile: Other Dec_compressed.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed (1).pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold_compressed.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 (A).pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory.PDF | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (1).pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Mill C wing.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.PDF | 26 Sep 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VEDANT MILLENIA PHASE I | BEHIND MAHAGANPATI MANDIR TITWALA | 402 | Completed | Mar 2016 | Late, Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 18 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Vedant Millenia happiness Phase II Wing C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalyan7,600+ in Thane
Filed coordinates, straight-line distance. 89 registered projects within 2 km.
KALAS DARSHAN
JAY GANESH DEVELOPERS
Charms Padamavati Royal Phase 2
Charms Developers
SILVER LINE PHASE - 1
HOME CONSULTANCY
Padamavati Royal Phase 2
Sujeet Kumar Singh
Charms Padamavati Royal Phase 1
Charms Developers
RUSTTAGI AARAMBHA PHASE-III
RUSTAGI ESTATES PRIVATE LIMITED
See every Thane project, with the district possession charts
Builder: MOHAN HARDASMAL THARWANI
MOHAN HARDASMAL THARWANI has 19 registrations on MahaRERA, including vedant nakshatra ABC phase 1 and vedant nakshatra M phase 2. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Vedant Millenia happiness Phase II Wing C is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vedant Millenia happiness Phase II Wing C?
The registered promoter entity is MOHAN HARDASMAL THARWANI, an individual as per the filing. Its GSTIN 27AAOPT7033Q1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vedant Millenia happiness Phase II Wing C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Vedant Millenia happiness Phase II Wing C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Vedant Millenia happiness Phase II Wing C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vedant Millenia happiness Phase II Wing C?
The professionals named in the filing: Architect: ARCHITECTS INC; Engineer: AVANISH AND ASSOCIATES PANDEY; Engineer: Avanish and Associates; Chartered Accountant: VERHANI AND CO; Chartered Accountant: Atul A Shetye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vedant Millenia happiness Phase II Wing C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback