Completed No litigation declared Residential / Group Housing project

VEDANT MILLENIA HAPPINESS PHASE II WING A

By MOHAN HARDASMAL THARWANI

RG-MH-94702 · RERA P51700018689 · Last updated on MahaRERA portal: 5 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2021Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Staircases, 90%
1Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

VEDANT MILLENIA HAPPINESS PHASE II WING A is a Residential / Group Housing project by MOHAN HARDASMAL THARWANI in Thane, Maharashtra, registered with MahaRERA as P51700018689 on 27 Nov 2018. The registration is recorded completed; possession was promised by 30 Nov 2021. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVEDANT MILLENIA HAPPINESS PHASE II WING A
  • TypeResidential / Group Housing
  • Location
    • BEHIND MAHA GANPATI MANDIR
    • TITWALA (EAST)
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • RERA no.P51700018689
  • ReraGenie IDRG-MH-94702

Builder

  • NameMOHAN HARDASMAL THARWANI
  • Entity typeIndividual
  • GSTIN27AAOPT7033Q1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations18 more →
  • Completed10 of 19
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2018PromisedNov 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Nov 2018
  • Promised completion30 Nov 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VEDANT MILLENIA HAPPINESS PHASE II WING ANA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

VEDANT MILLENIA HAPPINESS PHASE II WING A: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 5 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Swimming PoolYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered14
Open Space14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,073 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4876.47
Proposed, not sanctioned4,876 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchULHASNAGAR 2

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect INC
EngineerAVANISH AND ASSOCIATES
Chartered AccountantAS L AND ASSOCIATES
PartnerRole in project
MOHAN HARDASMAL THARWANI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700010737Nov 2021 → Aug 2022

Reason as filed by the promoterCOVID-19 PANDEMIC IIND WAVE AND LOCKDOWN FROM MARCH-2021, UNABLE DEVELOPER TO COMPLETE THE PROJECT WITHIN TIMELINES

Litigation declared1

CaseCourtStatus
956/2019STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAIDisposed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600034Bhakti AchrekarMOHAN HARDASMAL THARWANI09/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Jan 2023

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4MILLENIA A NEW.PDF5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf15 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Millenia Wing A OC letter_compressed.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A WING FORM 2_compressed.pdf27 Oct 2022
OtherFile: ENCUMBRANCE CERTIFICATE.PDF18 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: millenai A wing progress_compressed (1).pdf10 Aug 2022
Certificates of CA (Form 3)File: FORM 3-compressed_compressed.pdf10 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Millenia Wing A.pdf15 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Millenia A.pdf15 Mar 2022
Certificates of CA (Form 3)File: Form-3 Millenia A.pdf15 Mar 2022
Status of ConveyanceFile: 1 Status of CONVEYANCE.pdf21 Oct 2021
Disclosure of sold/ booked inventoryFile: SOLD UMSOLD ANNEXURE.pdf7 Sep 2021
Copy of the legal title reportFile: Millenia B wing Title Report_compressed (1).pdf3 Sep 2021
Details of encumbrancesFile: DECLARATION NON-EMBURANCE A WING.PDF3 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION OF CC AWING.PDF3 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 (2017-2018).pdf3 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 ( 2019-2020).pdf3 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 (2020-2021).pdf3 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: MAHARERA.PDF23 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER CER WING A 2A.pdf16 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1WING A.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CER WING A FORM 2.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER CER WING A 2A.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Millenia A Wing Phase 2 form 3 as on 300621.pdf14 Aug 2021
Certificates of CA (Form 3)File: Millenia A Wing Phase 2 form 3 as on 300621.pdf14 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Millenai 2nd CC Dated 29-07-2021_compressed.pdf10 Aug 2021
PAN CardFile: MOHAN SIR NEW PAN CARD.PDF5 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT_MILLENIA HAPP PHASE II-WING A.pdf16 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT_MILLENIA HAPP PHASE II-WING A.pdf16 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Vedant Millenia Happiness phase 2 _ A wing.pdf12 Apr 2021
Certificates of CA (Form 3)File: Vedant millenia - Form 3 (4).pdf17 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate A wing.pdf21 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MILLENIA A WING FORM NO 1.pdf21 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: MILLENIA A WING FORM 2A.pdf21 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Millenia Wing-A (Form V).pdf4 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wing - A ( Architect Certificate ) (1).pdf30 May 2019
Building plan approvalFile: Wing-A Plans.pdf20 Nov 2018
Layout approvalFile: 3) Layout Approved.pdf20 Nov 2018
Copy of the legal title reportFile: 1) copy of the legal title report.pdf20 Nov 2018
Details of encumbrancesFile: 5) Detail of encumbrances (Wing-A).pdf20 Nov 2018
Copy of Layout Approval (in case of layout)File: 3) Layout Approved.pdf20 Nov 2018
Building Plan Approval (IOD)File: Wing-A Plans.pdf20 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: 13)CC of millenia phase II.pdf20 Nov 2018
Declaration in FORM BFile: 7) Declaration in form b (Wing-A).pdf20 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Form 1).pdf20 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wing-A Engineer Certificate.pdf20 Nov 2018
Certificates of CA (Form 3)File: CA-A WING.pdf20 Nov 2018
Proforma of Allotment letterFile: 6) Proforma of the allotement letter and Agreement for sale (Wing-A).pdf20 Nov 2018
OtherFile: 16) Declaration on Letter Head.pdf20 Nov 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
VEDANT MILLENIA PHASE IBEHIND MAHAGANPATI MANDIR TITWALA402CompletedMar 2016Late, Jul 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VEDANT MILLENIA HAPPINESS PHASE II WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TITWALA (EAST)7,600+ in Thane

Builder: MOHAN HARDASMAL THARWANI

MOHAN HARDASMAL THARWANI has 19 registrations on MahaRERA, including vedant nakshatra ABC phase 1 and vedant nakshatra M phase 2. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VEDANT MILLENIA HAPPINESS PHASE II WING A is delayed beyond 30 Nov 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VEDANT MILLENIA HAPPINESS PHASE II WING A?

The registered promoter entity is MOHAN HARDASMAL THARWANI, an individual as per the filing. Its GSTIN 27AAOPT7033Q1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VEDANT MILLENIA HAPPINESS PHASE II WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VEDANT MILLENIA HAPPINESS PHASE II WING A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VEDANT MILLENIA HAPPINESS PHASE II WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VEDANT MILLENIA HAPPINESS PHASE II WING A?

The professionals named in the filing: Architect: Architect INC; Engineer: AVANISH AND ASSOCIATES; Chartered Accountant: AS L AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VEDANT MILLENIA HAPPINESS PHASE II WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VEDANT MILLENIA HAPPINESS PHASE II WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VEDANT MILLENIA HAPPINESS PHASE II WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.