ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Vayuputra Trident

Completed No litigation declared Residential / Group Housing project

Vayuputra Trident

By Vayuputra Builders and Infrastructures Private Limited

RG-MH-06711 · RERA P51800053280 · Last updated on MahaRERA portal: 9 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2026Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 40%
30 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Vayuputra Trident is a Residential / Group Housing project by Vayuputra Builders and Infrastructures Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053280 on 23 Oct 2023. The registration is recorded completed; possession was promised by 1 Jul 2026. 28 of the 58 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameVayuputra Trident
  • TypeResidential / Group Housing
  • Location
    • 18th Road
    • Khar (West)
    • Bandra - Khar (West)
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053280
  • ReraGenie IDRG-MH-06711

Builder

  • NameVayuputra Builders and Infrastructures Private Limited
  • Entity typeCompany
  • Managing DirectorShrinivas Vyasrao Nadgauda
  • DirectorRupa Shrinivas Nadgauda

Key dates

this monthRegisteredOct 2023PromisedJul 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2023
  • Promised completion1 Jul 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

48%28 of 58 units booked

Figures as on 9 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vayuputra TridentNA171658058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 40%.

Vayuputra Trident: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises2%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 9 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area845 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Dec 2025
LandownerVillageDistrict
Adish Co-operative Housing Society LimitedAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI3422.66
Proposed, not sanctioned3,377 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSagar Avenue, Ground Floor, Opp Shoppers Stop, S V Road, Andheri West, Mumbai 400058

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Vayuputra Builders and Infrastructures Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: VB-Trident - OC Plan - 1-compressed.pdf9 Dec 2025
Building plan approvalFile: VB-Trident - OC Plan - 1-compressed.pdf9 Dec 2025
Building plan approvalFile: VB-Trident - OC Plan - 2-compressed.pdf9 Dec 2025
Building plan approvalFile: VB-Trident - OC Plan - 3-compressed.pdf9 Dec 2025
Building plan approvalFile: VB-Trident - OC Plan - 4-compressed.pdf9 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vayuputra Trident as on 30-11-2024.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vayuputra Trident as on Dec 2024.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vayuputra Trident as on Dec 2024.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vayuputra Trident as on Sep 2024.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vayuputra Trident as on Sep 2024.pdf24 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Vayuputra Trident.pdf14 Dec 2024
Layout approvalFile: 1.pdf13 Nov 2024
Building plan approvalFile: 2.pdf13 Nov 2024
Building plan approvalFile: 3.pdf13 Nov 2024
Building plan approvalFile: 4.pdf13 Nov 2024
Copy of Layout Approval (in case of layout)File: 1.pdf13 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (6).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vayuputra Trident as on March 2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vayuputra Trident as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ccccccccccccc.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 Vayuputra Trident as on 31-03-2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 Vayuputra Trident as on 30-06-2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vayuputra Trident as on June 2024.pdf10 Jul 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE - VB-Trident - Lender Clause and Parking Clause Updated.pdf3 Jun 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Vayuputra Trident.pdf16 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Vayuputra Trident.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vayuputra Trident as on Dec 2023.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vayuputra Trident as on Dec 2023.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vayuputra Trident as on Dec 2023.pdf29 Jan 2024
Other - TechnicalFile: 2 Other - Technical (1) (1).pdf26 Sep 2023
Other - TechnicalFile: output (50)_11zon (1) (1).pdf26 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Verification.pdf25 Sep 2023
Other - TechnicalFile: CC Verification.pdf25 Sep 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (6).pdf11 Sep 2023
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) (6).pdf11 Sep 2023
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building plan approvalFile: 6 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
PAN CardFile: 1 PAN Card (3).pdf11 Sep 2023
Copy of the legal title reportFile: Title Report MahaRERA for uploading.pdf11 Sep 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (4).pdf11 Sep 2023
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal (2).pdf11 Sep 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (4).pdf11 Sep 2023
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal (2).pdf11 Sep 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (6).pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) (6).pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval _ NA Order for plotted development.pdf11 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf11 Sep 2023
Declaration about Commencement CertificateFile: Format D.pdf11 Sep 2023
Declaration in FORM BFile: Revised Form-B-Promoter.pdf11 Sep 2023
CERSAI detailsFile: 1 CERSAI details (5).pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (2).pdf11 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (2).pdf11 Sep 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (2).pdf11 Sep 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (4).pdf11 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow11 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotmenr Letter.pdf11 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report of AFS.pdf11 Sep 2023

How this compares with Mumbai Suburban

48%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vayuputra Trident on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra - Khar (West)6,700+ in Mumbai Suburban

2 kmVayuputra TridentCompleted 66Lapsed / revoked 33Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 204 registered projects within 2 km.

Builder: Vayuputra Builders and Infrastructures Private Limited

Vayuputra Builders and Infrastructures Private Limited has 1 registration on MahaRERA, including Vayuputra Trident. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Vayuputra Trident is delayed beyond 1 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vayuputra Trident?

The registered promoter entity is Vayuputra Builders and Infrastructures Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vayuputra Trident?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vayuputra Trident?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vayuputra Trident?

The professionals named in the filing: Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vayuputra Trident?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vayuputra Trident. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vayuputra Trident to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.