VAYM TOWERS
RG-MH-33913 · RERA P52000047677 · Last updated on MahaRERA portal: 28 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VAYM TOWERS is a Others project by SABURI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000047677 on 17 Nov 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameVAYM TOWERS
- TypeOthers
- Location
- BAZARPETH
- KHOPOLI
- Khalapur
- Raigarh
- 410203
- Pincode410203
- RERA no.P52000047677
- ReraGenie IDRG-MH-33913
Builder
- NameSABURI DEVELOPERS
- Entity typePartnership
- PartnersKISHOR PORWAL, INDARMAL KHANDELWAL, ANIL PINGALE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Nov 2022
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
- Buildings2 building records
- Documents filed71 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VAYM TOWERS WING A | NA | 7 | 0 | 0 | 0 | 0 |
| VAYM TOWERS WING B | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 85%.
VAYM TOWERS WING A56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VAYM TOWERS WING B75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| VAYM TOWERS WING A | 1 | 1 |
| VAYM TOWERS WING B | 1 | 1 |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MAHENDRAKUMAR KANTILAL SHAH | Khopoli | Raigarh |
| KRUSHNAJIVAN KANTILAL SHAH | Khopoli | Raigarh |
| KIRTIKUMAR AMRUTLAL SHAH | Khopoli | Raigarh |
| ALKABEN RAMESHCHANDRA SHAH | Khopoli | Raigarh |
| HEMANSHU RAMESHCHANDRA SHAH | Khopoli | Raigarh |
| HETAL RAMESHCHANDRA SHAH | Khopoli | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABHIKALPA |
| Engineer | MS YATEESH TARE CONSULTING ENGINEERS |
| Chartered Accountant | NIKUNJ OSWAL |
| Partner | Role in project |
|---|---|
| SABURI DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur Project is incomplete due to insufficient funds. Our bank loan was not passed in time so we faced too much problems of building funds for construction.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: 1 Dec 2022.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 2 Mar 2023.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 3 June 2023.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 4 Sept 2023.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 5 Dec 2023.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6 Mar 2024.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 7 June 2024.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 8 Sept 2024.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 9 Dec 2024.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 10 Mar 2025.pdf | 28 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 28 Apr 2025 |
| Declaration in FORM BFile: Affidavit .pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Latest UPLOAD.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Latest).pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 2023 March 2nd Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 2023 June 3rd Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Set 2023 4th Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Dec 2023 5th Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 March 2024 6th Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 2024 7th Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Sept 2024 8th Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Dec 2024 9th Quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 March 2025 10th quarter.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 2022 1ST quarter.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate - September 2024 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 CA Certificate - March 2025 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 CA Certificate - December 2024 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certificate - June 2024 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Certificate - March 2024 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate - September 2023 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate - June 2023 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate - March 2023 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate - December 2022 UPLOAD.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate - December 2023 UPLOAD.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Dec 2023 5th Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 March 2025 10th Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Dec 2024 9th Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Sept 2024 8th Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 June 2024 7th Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 March 24 6th Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Sept 2023 4th Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 June 2023 3rd Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 March 2023 2nd Quarter.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Dec 2022 1st Quarter.pdf | 5 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A signed FY 22-23.pdf | 5 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 signed 22-23.pdf | 5 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A signed FY 23-24.pdf | 5 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed 23-24.pdf | 5 Apr 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: New bank details as per order 34.pdf | 24 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Annexture D.pdf | 7 Nov 2022 |
| Proforma of Agreement for saleFile: Proforma letter as per order 31 new_compressed (1).pdf | 25 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation AL new.pdf | 25 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation ATS new.pdf | 25 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE (1).pdf | 13 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 8 Sep 2022 |
| Declaration about Commencement CertificateFile: dcc.pdf | 8 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details as per Order 34.pdf | 8 Sep 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200245850237_For_Asset_Based_Search_30_08_2022_10_37_41_028.pdf | 30 Aug 2022 |
| Proforma of Agreement for saleFile: Agreement to sell.pdf | 18 Aug 2022 |
| Proforma of Allotment letterFile: Agreement to sell.pdf | 18 Aug 2022 |
| Layout approvalFile: layout.pdf | 17 Aug 2022 |
| Building plan approvalFile: Building Plan C.pdf | 17 Aug 2022 |
| PAN CardFile: saburi developers pan.pdf | 17 Aug 2022 |
| Copy of the legal title reportFile: Legal Title Report_compressed-1-13.pdf | 17 Aug 2022 |
| Copy of the legal title reportFile: Legal Title Report_compressed-14-22.pdf | 17 Aug 2022 |
| Copy of the legal title reportFile: Legal Title Report_compressed-23-27.pdf | 17 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate new.pdf | 17 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Non Encombrance.pdf | 17 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 17 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan C.pdf | 17 Aug 2022 |
| Declaration in FORM BFile: Form B new.pdf | 17 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep VAYM TOWERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHOPOLI5,900+ in Raigarh
Godrej Hillview Estate
Godrej Projects Development Limited
Haware My First Home Shil Phata Phase 2 Bldg 1
Haware Properties LLP
UNIMONT IMPERIA
RSM DESIGNERS
Haware My First Home Shil Phata Phase 1 Bldg 1
Haware Properties LLP
AeroEstate
HOABL Landmark Realty Private Limited
Haware My First Home Shil Phata Phase 2 Bldg 2
Haware Properties LLP
See every Raigarh project, with the district possession charts
Builder: SABURI DEVELOPERS
SABURI DEVELOPERS has 1 registration on MahaRERA, including VAYM TOWERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that VAYM TOWERS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VAYM TOWERS is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VAYM TOWERS?
The registered promoter entity is SABURI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VAYM TOWERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VAYM TOWERS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VAYM TOWERS?
The professionals named in the filing: Architect: ABHIKALPA; Engineer: MS YATEESH TARE CONSULTING ENGINEERS; Chartered Accountant: NIKUNJ OSWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VAYM TOWERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback