Home / Browse projects / Sangli, Maharashtra / VASTUSHRI

Completed No litigation declared Residential / Group Housing project

VASTUSHRI

By REAL LAND MARK DEVELOPERS LLP

RG-MH-23153 · RERA P53100032624 · Last updated on MahaRERA portal: 6 Jun 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

VASTUSHRI is a Residential / Group Housing project by REAL LAND MARK DEVELOPERS LLP in Sangli, Maharashtra, registered with MahaRERA as P53100032624 on 17 Jan 2022. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameVASTUSHRI
  • TypeResidential / Group Housing
  • Location
    • 100 FT ROAD
    • NEAR PETROL PUMMP
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100032624
  • ReraGenie IDRG-MH-23153

Builder

  • NameREAL LAND MARK DEVELOPERS LLP
  • Entity typePartnership

Key dates

this monthRegisteredJan 2022PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jan 2022
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VASTUSHRINA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

VASTUSHRI: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area634 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1586.9
Proposed, not sanctioned1,587 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG 3 BALAJI CELEBRATIONS NEMINATHNAGAR VISHRAMBAG SANGLI 416415

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN G KANOJE
EngineerPRAVIN PISE
Chartered AccountantSHOUNAK PAILWAN
PartnerRole in project
REAL LAND MARK DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100019668Mar 2024 → Dec 2024

Reason as filed by the promoterDUE TO SANGLI MIRAJ KUPWAD MUNICIAPL CORORATION ONLINE SYSTEM ITS TAKING TIME

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jun 2024

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTI.pdf6 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: FROM 4.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf25 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: from 2a.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf3 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf24 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf24 Feb 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf24 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf24 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engineers certificate for quality assurance.pdf6 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf11 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf11 Apr 2022
Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf11 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: engineers certificate for quality assurance.pdf11 Apr 2022
Copy of the legal title reportFile: Title search.pdf15 Jan 2022
Layout approvalFile: MOJNI NAKASHA.pdf7 Jan 2022
Building plan approvalFile: MUN DRG.pdf7 Jan 2022
PAN CardFile: PAN ACRD.pdf7 Jan 2022
Details of encumbrancesFile: INCUMBRACNE CERTIFICATE.pdf7 Jan 2022
Copy of Layout Approval (in case of layout)File: MOJNI NAKASHA.pdf7 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: MUN DRG.pdf7 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: BANDHKAM PARWANA.pdf7 Jan 2022
Declaration about Commencement CertificateFile: COMMENCEMNT CERTIFICATE.pdf7 Jan 2022
Declaration in FORM BFile: form b.pdf7 Jan 2022
CERSAI detailsFile: CERSAI Search Report.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf7 Jan 2022
Proforma of Allotment letterFile: agreement.pdf7 Jan 2022

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep VASTUSHRI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR PETROL PUMMP790+ in Sangli

2 kmVASTUSHRICompleted 79Lapsed / revoked 50Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: REAL LAND MARK DEVELOPERS LLP

REAL LAND MARK DEVELOPERS LLP has 1 registration on MahaRERA, including VASTUSHRI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if VASTUSHRI is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VASTUSHRI?

The registered promoter entity is REAL LAND MARK DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VASTUSHRI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VASTUSHRI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VASTUSHRI?

The professionals named in the filing: Architect: SACHIN G KANOJE; Engineer: PRAVIN PISE; Chartered Accountant: SHOUNAK PAILWAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VASTUSHRI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VASTUSHRI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VASTUSHRI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.