Home / Browse projects / Satara, Maharashtra / VASTUSHILP

Registered No litigation declared Residential / Group Housing project

VASTUSHILP

By VASTUSHREE BUILDERS AND DEVELOPERS

RG-MH-51303 · RERA P52700019381 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Internal walls, 80%
22 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

VASTUSHILP is a Residential / Group Housing project by VASTUSHREE BUILDERS AND DEVELOPERS in Satara, Maharashtra, registered with MahaRERA as P52700019381 on 23 Jan 2019. Possession is promised by 30 Dec 2026. 26 of the 48 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameVASTUSHILP
  • TypeResidential / Group Housing
  • Location
    • NAGTHANE
    • Satara
    • 415519
  • Pincode415519
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700019381
  • ReraGenie IDRG-MH-51303

Builder

  • NameVASTUSHREE BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSUHAS PRABHAKAR KASAR, NIRAJ BALKRISHNA MOHOLKAR

Key dates

this monthRegisteredJan 2019PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jan 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

54%26 of 48 units booked
72.0%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VASTU SHILPNA44143448

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

VASTU SHILP: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025
LandownerVillageDistrict
PRASHANT PRAKASH TIWATANENagthaneSatara
PRAVIN PRAKASH TIWATANENagthaneSatara
PADMA PRAKASH TIWATANENagthaneSatara
PRAGATI ATUL KASARNashikNashik

Approvals and building plan

Sanctioning authoritySUHAS PRABHAKAR KASAR
Permissible FSI980.15
Proposed, not sanctioned980 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSATARA
Estimated costRs 2.38 cr
Cost incurredRs 1.71 cr
Work done72.03%
BuildingWingEstimatedIncurred
VASTU SHILPNARs 1.96 crRs 1.55 cr
-NARs 42.00 lakhRs 16.30 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAVIN SURESH MORE AND ASSOCIATES SURESH MORE
EngineerAVINASH CHANDRAKANT KALI CHANDRAKANT KALI
EngineerMAHESH UTTAMRAO KADAM
Chartered AccountantV SJADHAV AND CO SHRIPATI JADHAV
Chartered AccountantSHUBHAM SALUNKHE AND ASSOCIATES
Chartered AccountantSAMADHAN RAMDAS KADAM
PartnerRole in project
VASTUSHREE BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 VASTUSHILP JUN 2026.pdf15 Jul 2026
Withdrawal Update Form 2File: FORM 2 VASTUSHILP JUN 2026.pdf15 Jul 2026
Withdrawal Update Form 3File: FORM 3 VASTUSHILP JUN 2026.pdf15 Jul 2026
Withdrawal Update Form 1File: Vastuahilp Form no 1.pdf18 Apr 2026
Withdrawal Update Form 1File: Vastuahilp Form no 1.pdf18 Apr 2026
Withdrawal Update Form 2File: Form no 2 Vastuahilp.pdf18 Apr 2026
Withdrawal Update Form 2File: Form no 2 Vastuahilp.pdf18 Apr 2026
Withdrawal Update Form 3File: Vastuahilp Form no 3.pdf18 Apr 2026
Withdrawal Update Form 3File: Vastuahilp Form no 3.pdf18 Apr 2026
Withdrawal Update Form 1File: Vastushilp Form 1 Dec 25.pdf3 Mar 2026
Withdrawal Update Form 2File: Vastushilp Form 2 Dec 25.pdf3 Mar 2026
Withdrawal Update Form 3File: vastu shree from 3 Jun 25.pdf3 Mar 2026
Withdrawal Update Form 1File: Form No 1 Sep 2025.pdf15 Oct 2025
Withdrawal Update Form 2File: Form No 2 Eng Jun 2025.pdf15 Oct 2025
Withdrawal Update Form 3File: vastu shree from 3 Jun 25.pdf15 Oct 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arki 1 VASTUSHILP March 25.pdf19 Apr 2025
Certificates of CA (Form 3)File: CA 3 VASTUSHILP March 25.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg 2 VASTUSHILP March 25.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VASTUSHREE BUILDERS DEVLOPERS Arki Vastushilp - Dec 2024.pdf17 Feb 2025
Certificates of CA (Form 3)File: Vastuslip - CA Certificate Dec 2024.pdf17 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastuslip - Engineer Certificate Dec 2024.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vastuslip - Architect Certificate Jun 2024.pdf9 Nov 2024
Certificates of CA (Form 3)File: Vastuslip - CA Certificate Jun 2024.pdf9 Nov 2024
Certificates of CA (Form 3)File: Vastuslip - CA Certificate Sep 2024.pdf9 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastuslip - Engineer Certificate Jun 2024.pdf9 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastuslip - Engineer Certificate Sep 2024.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vastuslip - Architect Certificate Mar 2024.pdf21 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastuslip - Engineer Certificate Mar 2024.pdf21 May 2024
Certificates of CA (Form 3)File: Vastuslip - CA Certificate Mar 2024.pdf21 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 VASTUSHREE BUILDERS DEVELOPERS.pdf11 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Vastushilp Dec 23.pdf11 Jan 2024
Certificates of CA (Form 3)File: RERA Certificate- Vastushilp Dec 23.pdf11 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31 12 2023 FROM 1 VASTUSHREE BUILDERS DEVELOPERS.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30 9 2023 FORM 1 VASTUSHILP.pdf3 Nov 2023
Certificates of CA (Form 3)File: FROM 3 VASTUSHILP VASTUSHREE BUILDERS DEVELOPERS.pdf3 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arki 1 VASTUSHILP March 23.pdf20 Jun 2023
Certificates of CA (Form 3)File: Form 3 Vastushilp March 23.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Vastushree Builders Developers Annual report March 23.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: vASTUSHREE 1.pdf7 Feb 2023
Certificates of CA (Form 3)File: Vastushree 3.pdf7 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Vastushilp March 22.pdf26 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Vastushilp June 22.pdf26 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Vastushilp June 22.pdf26 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Vastu Shilp 2022 FORM 2A.pdf26 Aug 2022
Certificates of CA (Form 3)File: Form 3 Vastushilp March 22.pdf26 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VASTUSHREE BUILDERS DEVLOPERS Arki Vastushilp.pdf10 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastushree Builders ENG Vastushilp.pdf10 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Fund Utilization Report.pdf28 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vastushilp Arki June 21.pdf19 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastusilp engineer march 21.pdf19 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VASTUShilp form 1 march 21.pdf19 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastus hilpa Engineer June 21.pdf19 Jul 2021
Certificates of CA (Form 3)File: VASTUSHILPA form 3.pdf19 Jul 2021
Certificates of CA (Form 3)File: VASTUSHILPA form 3 june 21.pdf19 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VASHTUSHREE BUILDERS DEVELOPERS FORM 1.pdf5 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VASHUSHREE BUILDERS DEVELOPERS FORM 2.pdf5 Nov 2020
Certificates of CA (Form 3)File: VASHTUSHILPA FORM3.pdf5 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf29 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf29 Jul 2020
Certificates of CA (Form 3)File: FORM 3.pdf29 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf4 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: certificate.pdf4 Jun 2020
Certificates of CA (Form 3)File: form 3.pdf4 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf25 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf25 Jan 2020
Certificates of CA (Form 3)File: CA certificate.pdf25 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArchitectCertificateVastushilpa.pdf23 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers CertificateVastushilpa.pdf23 Oct 2019
Certificates of CA (Form 3)File: Form 3 Vastushilpa.pdf23 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vastushree Form 1.pdf20 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: vastushree form 2.pdf20 Jul 2019
Certificates of CA (Form 3)File: vastushree form 3.pdf20 Jul 2019
Form 2AFile: Vastushilp 2A.pdf12 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vastushree Builders Form 1 VASTUSHILPA.pdf4 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastushree Builders form 2 vASTUSHILPA.pdf4 Jun 2019
Certificates of CA (Form 3)File: Form No 3 Vastushilp Q4.pdf4 Jun 2019
Details of encumbrancesFile: Non Encumbrance Certificate.pdf11 Jan 2019
Declaration in FORM BFile: Form B.pdf11 Jan 2019
Certificates of CA (Form 3)File: FORM 3.pdf11 Jan 2019
Building plan approvalFile: Sanction Plan.pdf2 Jan 2019

How this compares with Satara

54%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep VASTUSHILP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAGTHANE1,100+ in Satara

Builder: VASTUSHREE BUILDERS AND DEVELOPERS

VASTUSHREE BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including VASTUSHILP. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if VASTUSHILP is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VASTUSHILP?

The registered promoter entity is VASTUSHREE BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VASTUSHILP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VASTUSHILP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VASTUSHILP?

The professionals named in the filing: Architect: PRAVIN SURESH MORE AND ASSOCIATES SURESH MORE; Engineer: AVINASH CHANDRAKANT KALI CHANDRAKANT KALI; Engineer: MAHESH UTTAMRAO KADAM; Chartered Accountant: V SJADHAV AND CO SHRIPATI JADHAV; Chartered Accountant: SHUBHAM SALUNKHE AND ASSOCIATES; Chartered Accountant: SAMADHAN RAMDAS KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VASTUSHILP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VASTUSHILP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VASTUSHILP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.