ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / VASTU IMPRESSA B-WING

Registered No litigation declared Residential / Group Housing project

VASTU IMPRESSA B-WING

By Pradeep Prabhakar Patil

RG-MH-29261 · RERA P99000028045 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 33 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 33 months from the original
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
5 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

VASTU IMPRESSA B-WING is a Residential / Group Housing project by Pradeep Prabhakar Patil in Palghar, Maharashtra, registered with MahaRERA as P99000028045 on 26 Jan 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 33 months from the original filing. 14 of the 19 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameVASTU IMPRESSA B-WING
  • TypeResidential / Group Housing
  • Location
    • Makane
    • Makane Village
    • Palghar
    • 401102
  • Pincode401102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000028045
  • ReraGenie IDRG-MH-29261

Builder

  • NamePradeep Prabhakar Patil
  • Entity typeIndividual
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2021First promiseSep 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Jan 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Sep 2024)
  • Buildings1 building record
  • Documents filed64 files

Current status

74%14 of 19 units booked
88.2%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vastu Impressa B-WingNA5519019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Vastu Impressa B-Wing: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered7
Open Space43

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 May 2026

Approvals and building plan

Sanctioning authorityPalghar Municipal Corporation
Permissible FSI644.83
Proposed, not sanctioned642 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVirar West
Estimated costRs 1.05 cr
Cost incurredRs 92.61 lakh
Work done88.2%
BuildingWingEstimatedIncurred
Vastu Impressa B-WingNARs 94.50 lakhRs 92.61 lakh
-NARs 10.50 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRoshan Patil & Associates
EngineerShah & Associates
Chartered AccountantJitesh Kothari & Associates
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantN B Sayed & Associates
Chartered AccountantRESHMA VAIBHAV PATIL
PartnerRole in project
Pradeep Prabhakar Patil-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000024970Sep 2024 → Sep 2025

Reason as filed by the promoterThe primary reason for the delay has been a shortage of labor and contractor resources, which significantly impacted our overall progress and timeline. In addition, unforeseen supply chain disruptions have affected the availability of critical materials, further complicating our efforts to stay on schedule. These challenges impacted our progress and timeline. We have secured additional labor and engaged reliable contractors, which will allow us to accelerate the remaining work.

EA31122519185Sep 2024 → Jun 2027

Reason as filed by the promoterWe respectfully request an extension for the project registration due to unavoidable financial constraints arising from the fact that major units of the project have been unsold till date. The absence of sales has resulted in insufficient cash inflow, which has directly impacted the availability of working capital required for timely project construction. To ensure that the project is completed as per approved plans and quality standards, we require additional time to stabilize finances, secure alternative funding, and resume construction activities at full pace. We assure the Authority that t

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Vastu b wing jan to apr 26.pdf20 May 2026
Withdrawal Update Form 2File: Form 2 Vastu b wing jan to apr 26.pdf20 May 2026
Withdrawal Update Form 3File: form 3 vastu.PDF20 May 2026
Layout approvalFile: Layout and Bldg plan_Vastu Impressa HL.pdf27 Apr 2026
Building plan approvalFile: Layout and Bldg plan_Vastu Impressa HL.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 Bwing Oct to Dec.pdf27 Mar 2026
Withdrawal Update Form 2File: Form 2 B wing Oct to Dec 25.pdf27 Mar 2026
Withdrawal Update Form 3File: VASTU FORM 3.PDF27 Mar 2026
Withdrawal Update Form 1File: Form 1 Bwing Oct to Dec.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 B wing Oct to Dec 25.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 Sep 25.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf31 Dec 2025
Withdrawal Update Form 1File: Form 1 Sep 25.pdf31 Dec 2025
Withdrawal Update Form 2File: Form 2 Sep 25.pdf31 Dec 2025
Withdrawal Update Form 2File: Form 2 Sep 25.pdf31 Dec 2025
Withdrawal Update Form 3File: Form 3 Sep 25.pdf31 Dec 2025
Withdrawal Update Form 3File: Form 3 Sep 25.pdf31 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pradeep Patil.pdf4 Nov 2024
Proforma of Allotment letterFile: Allotment letter.pdf29 Oct 2024
Declaration in FORM BFile: P99000028045_FileName_4.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022-23- Signed.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24- signed.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Pradeep Patil sep 24.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate (1).pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Pradeep Patil Sep 24.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-booked inventory.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Pradeep Patil 22-23.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Pradeep Patil Sep 24.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Pradeep Patil Sep 24.pdf23 Oct 2024
Details of encumbrances concerned to FinanceFile: self declaration.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: No emcumbrance to legal.pdf22 Oct 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf22 Oct 2024
CERSAI detailsFile: Undertaking about cersai certificate.pdf22 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA designated bank ac.pdf22 Oct 2024
Deviation Report with respect to Allotment letterFile: No deviation from model allotment letter.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: No emcumbrance to legal.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: self declaration.pdf22 Oct 2024
Other - TechnicalFile: Annexure ‘A’.pdf22 Oct 2024
Deviation Report with respect to model copy of AgreementFile: No deviation from agreement for sale.pdf22 Oct 2024
Proforma of Agreement for saleFile: PRADIP_PATIL_MAKNE_WING_B_DRAFT (1).pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B wing form 1 vastu developers.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B wing form 2 vastu developers.pdf8 May 2023
Disclosure of sold/ booked inventoryFile: vastu impressa B wing disclosure of flats.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Vastu Impressa B Wing.pdf3 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form2a vaastu impressa.pdf3 Mar 2023
Disclosure of sold/ booked inventoryFile: vastu B wing Unsold flats.pdf3 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Pradeep Patil.pdf3 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: vastu impressa B wing Form 5.pdf3 Mar 2023
Layout approvalFile: Plan_compressed (1).pdf21 Jan 2021
Copy of Layout Approval (in case of layout)File: Plan_compressed (1).pdf21 Jan 2021
Building plan approvalFile: Plan_compressed (1).pdf19 Jan 2021
PAN CardFile: Pradeep PAN.pdf19 Jan 2021
Copy of the legal title reportFile: Vastu_Impressa_B_Wing_Title_Certificate_0001_compressed.pdf19 Jan 2021
Details of encumbrancesFile: no encumbrances.pdf19 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan_compressed (1).pdf19 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: cc_compressed-1-3.pdf19 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: cc_compressed-4-6.pdf19 Jan 2021
Declaration in FORM BFile: Affidavit Form-B_compressed.pdf19 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Building B wing.pdf19 Jan 2021
Proforma of Allotment letterFile: PRADIP PATIL MAKNE WING B DRAFT.pdf19 Jan 2021
Proforma of Allotment letterFile: allotment declaration.pdf19 Jan 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PARK - 16P99000034593Makane, Palghar19Apr 2022OngoingMar 2027Not due yet
VASTU IMPRESSAP99000025123Saphale East, Palghar38Mar 2020OngoingMar 2025Not delivered
Pride ApartmentP99000025508Near Saphale, Palghar9Jun 2020OngoingNov 2023Not delivered

How this compares with Palghar

74%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 33 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VASTU IMPRESSA B-WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Makane Village3,200+ in Palghar

2 kmVASTU IMPRESSA B-WINGCompleted 19Lapsed / revoked 7Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: Pradeep Prabhakar Patil

Pradeep Prabhakar Patil has 1 registration on MahaRERA, including VASTU IMPRESSA B-WING. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VASTU IMPRESSA B-WING is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VASTU IMPRESSA B-WING?

The registered promoter entity is Pradeep Prabhakar Patil, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VASTU IMPRESSA B-WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VASTU IMPRESSA B-WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VASTU IMPRESSA B-WING?

The professionals named in the filing: Architect: Roshan Patil & Associates; Engineer: Shah & Associates; Chartered Accountant: Jitesh Kothari & Associates; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: RESHMA VAIBHAV PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VASTU IMPRESSA B-WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VASTU IMPRESSA B-WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VASTU IMPRESSA B-WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.