ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / RAJLAXXMI PARK

Registered No litigation declared Residential / Group Housing project

RAJLAXXMI PARK

By SAPHALE LAND DEVELOPERS LLP

RG-MH-07659 · RERA P99000056103 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 20.00 crore secured on the land, in favour of PIRAMAL ENTERPRISES LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 0%
297 of 341Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

RAJLAXXMI PARK is a Residential / Group Housing project by SAPHALE LAND DEVELOPERS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000056103 on 10 May 2024. Possession is promised by 31 Dec 2030. 44 of the 341 units on this registration are recorded sold or booked, and 0 of 66 construction stages are filed complete.

At a glance

Project

  • NameRAJLAXXMI PARK
  • TypeResidential / Group Housing
  • Location
    • RAMBAG
    • SAPHALE
    • Mande
    • Palghar
    • 401102
  • Pincode401102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000056103
  • ReraGenie IDRG-MH-07659

Builder

  • NameSAPHALE LAND DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27AFAFS3970C1Z3
  • PartnersSHILPA HEMANT SAMPAT, JIGAR JAWAHARLAL SHAH, GLEN NAZRETH DCUNHA, KIRAN MADHUKAR BHOIR, KALPIT ASHOK JAIN, SANTOSH LAXMAN CHAUDHARI, RUTURAJ KRISHNAKANT BANDAGALE, VIKAS POONAMCHAND HIRAN

Key dates

this monthRegisteredMay 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings6 building records
  • Documents filed113 files

Current status

13%44 of 341 units booked
12.1%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO 1 WING A AND BNA88602787
BLDG NO 2NA5532032
BLDG NO 3 WING A AND BNA5559059
BLDG NO 4 WING A AND BNA8891091
BLDG NO 5NA5543043
HOUSING FOR THE AFFECTED PEOPLENA5529029

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 0%.

BLDG NO 1 WING A AND B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 3 WING A AND B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 4 WING A AND B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
HOUSING FOR THE AFFECTED PEOPLE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed419

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots419
Closed/Covered31
Open Space388
BuildingClosed/CoveredOpen SpaceTotal
BLDG NO 1 WING A AND B12116128
BLDG NO 233437
BLDG NO 3 WING A AND B56267
BLDG NO 4 WING A AND B894102
BLDG NO 534851
HOUSING FOR THE AFFECTED PEOPLE03434

Land and ownership5

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area12,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared present
Charge in favour ofPIRAMAL ENTERPRISES LIMITED
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on28 Sep 2024
LandownerVillageDistrict
JAGANNATH MAHADEV RAUTMandePalghar
JAYSHREE JAGANNATH RAUTMandePalghar
SHRADDHA SUNIL RAUTGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
ULHAS JAGANNATH RAUTMandePalghar
AJIT JAGANNATH RAUTMandePalghar

Approvals and building plan

Sanctioning authorityGOVERNMENT OF MAHARASHTRA TOWN PLANNING AND VALUATION DEPARTMENT PALGHAR
Permissible FSI17128.29
Proposed, not sanctioned17,128 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SURVEY NO 265, MHATRE WADI, NEAR VIRAR RAILWAY STATION, VIRAR WEST- 401303
Estimated costRs 47.68 cr
Cost incurredRs 5.76 cr
Work done12.08%
BuildingWingEstimatedIncurred
BLDG NO 4 WING A AND BNARs 10.61 crRs 2.33 cr
BLDG NO 1 WING A AND BNARs 8.66 cr-
-NARs 7.45 cr-
BLDG NO 3 WING A AND BNARs 6.90 crRs 2.48 cr
HOUSING FOR THE AFFECTED PEOPLENARs 6.05 cr-
BLDG NO 5NARs 4.28 crRs 94.21 lakh
BLDG NO 2NARs 3.73 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHIRAG MISTRY AND ASSOCIATES
EngineerMUKESH KUMAR
Chartered AccountantPP BARAPATRE AND CO
Chartered AccountantCHRYSTAL FRANCIS LOPES
PartnerRole in project
SAPHALE LAND DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 SLD.pdf1 May 2026
Form 2File: Form 2.pdf1 May 2026
Form 3File: Form 3.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of inventory.pdf1 May 2026
Form 1File: SLD FORM 1 DEC QUTERS BLDG NO 1 to 6.pdf27 Feb 2026
Form 2File: SLD FORM 2 1 to 6 DEC QUARTER.pdf27 Feb 2026
Form 3File: FORM 3 DEC QUTERS SLD.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SLD DEC Qtr.pdf27 Feb 2026
Form 1File: FORM 1 30 06 2025 compressed.pdf23 Feb 2026
Form 2File: FORM 2 20 07 2025 compressed.pdf23 Feb 2026
Form 3File: FORM 3 31 07 2025 compressed.pdf23 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD JUNE 2025 compressed.pdf23 Feb 2026
Form 1File: FORM 1 30 09 2025 compressed.pdf21 Feb 2026
Form 2File: FORM 2 20 09 2025 NEW compressed.pdf21 Feb 2026
Form 3File: FORM 3 9 12 2025 compressed.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD SEP 2025 compressed.pdf21 Feb 2026
Form 1File: FORM 1 Dated 20250728155120.pdf28 Jul 2025
Form 2File: FORM 2 Dated 20250728160010.pdf28 Jul 2025
Form 3File: FORM 3 Dated 20250728160339_compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 1 DISCOLSURE OF SOLD & BOOKED20250728170935.pdf28 Jul 2025
Form 1File: FORM 1 Dated 20250728161500.pdf28 Jul 2025
Form 2File: FORM 2 Dated 20250728161338.pdf28 Jul 2025
Form 3File: FORM 3 Dated 20250728161044_compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 2 DISCOLSURE OF SOLD & BOOKED20250728171158.pdf28 Jul 2025
Form 1File: FORM 1 Dated 20250728162031.pdf28 Jul 2025
Form 2File: FORM 2 Dated 20250728161915.pdf28 Jul 2025
Form 3File: FORM 3 Dated 20250728161651_compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 3 DISCOLSURE OF SOLD & BOOKED20250728171402.pdf28 Jul 2025
Form 1File: FORM 1 DATED20250728182033.pdf28 Jul 2025
Form 2File: FORM 2 DATED20250728182242.pdf28 Jul 2025
Form 3File: FORM 3 DATED20250728182443_compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 4 DISCOLSURE OF SOLD & BOOKED20250728181414.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SLD2.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH3 COM.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA4 compressed.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SAPHALE LAND DEV compressed.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SAPHALE LAND DEV compressed.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf4 Jul 2024
Proforma of Agreement for saleFile: RERA DRAFT FOR SLD UPDATED ONE.pdf19 Jun 2024
Other - FinanceFile: Encumbrance Certificate (4).pdf17 Jun 2024
Building plan approvalFile: HOUSING FOR THE AFFCTED PEOPLE 20.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO1 WINGS A AND B 02.pdf30 Apr 2024
Building plan approvalFile: BUILDING 1 WING A AND B 03.pdf30 Apr 2024
Building plan approvalFile: BUILDING 1 WINGS A AND B 04.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 2 05.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 2 06.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 03 WING A 07.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 03 WING A 08.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 03 WING B 09.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 03 WING B 10.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 04 WING A 11.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 04 WING A 12.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 04 WING B 13.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 04 WING B 14.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 05 15.pdf30 Apr 2024
Building plan approvalFile: BUILDING NO 5 16.pdf30 Apr 2024
Building plan approvalFile: VIPASSANA CENTER 17.pdf30 Apr 2024
Building plan approvalFile: CLUB HOUSE 18.pdf30 Apr 2024
Building plan approvalFile: HOUSING FOR THE AFFCTED PEOPLE 19.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO1 WINGS A AND B 02.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING 1 WING A AND B 03.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING 1 WINGS A AND B 04.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 2 05.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 2 06.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 03 WING A 07.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 03 WING A 08.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 03 WING B 09.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 03 WING B 10.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 04 WING A 11.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 04 WING A 12.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 04 WING B 13.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 04 WING B 14.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 05 15.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING NO 5 16.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: VIPASSANA CENTER 17.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: CLUB HOUSE 18.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HOUSING FOR THE AFFCTED PEOPLE 19.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HOUSING FOR THE AFFCTED PEOPLE 20.pdf30 Apr 2024

How this compares with Palghar

13%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJLAXXMI PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAPHALE3,200+ in Palghar

2 kmRAJLAXXMI PARKCompleted 17Lapsed / revoked 5Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: SAPHALE LAND DEVELOPERS LLP

SAPHALE LAND DEVELOPERS LLP has 1 registration on MahaRERA, including RAJLAXXMI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if RAJLAXXMI PARK is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJLAXXMI PARK?

The registered promoter entity is SAPHALE LAND DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AFAFS3970C1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJLAXXMI PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJLAXXMI PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJLAXXMI PARK?

The professionals named in the filing: Architect: CHIRAG MISTRY AND ASSOCIATES; Engineer: MUKESH KUMAR; Chartered Accountant: PP BARAPATRE AND CO; Chartered Accountant: CHRYSTAL FRANCIS LOPES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJLAXXMI PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJLAXXMI PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJLAXXMI PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.