Home / Browse projects / Pune, Maharashtra / Vascon Goodlife Phase C

Registration lapsed No litigation declared Residential / Group Housing project

Vascon Goodlife Phase C

By Vascon Engineers Ltd

RG-MH-72361 · RERA P52100016293 · Last updated on MahaRERA portal: 7 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Vascon Goodlife Phase C is a Residential / Group Housing project by Vascon Engineers Ltd in Pune, Maharashtra, registered with MahaRERA as P52100016293 on 2 May 2018. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameVascon Goodlife Phase C
  • TypeResidential / Group Housing
  • Location
    • Gat No 78
    • 79
    • 80
    • 132
    • 133
    • 134
    • 135
    • Katavi
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016293
  • ReraGenie IDRG-MH-72361

Builder

  • NameVascon Engineers Ltd
  • Entity typeCompany
  • CINL70100PN1986PLC175750
  • GSTIN27AAACV1249F1ZI
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorSiddharth Vasudevan Moorthy
  • DirectorsSantosh Pursram Sundararajan, Santosh Sundararajan, Santosh Sundararajan
  • Other registrations11 more →
  • Completed6 of 12
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

22 months past promisethis monthRegisteredMay 2018PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 May 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 7 and 8NA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

Building 7 and 8: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.67%

Progress on shared amenities21

As on 7 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes35%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes75%
Open ParkingYes80%
Space for Study AreaYes0%
Solar Water Heating SystemYes0%
Outdoor GamesYes0%
Online Education CenterYes0%
Multi Activity CourtYes0%
Cricket PitchYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,804 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7535.68
Proposed, not sanctioned7,536 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTara Chambers, Wakdewadi, Mumbai-Pune Highway, Pune 411003

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Sandeep Hardikar
EngineerDr. Santosh Sundarajan
PartnerRole in project
Vascon Engineers Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jan 2025

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 with declaration Goodlife Ph C.pdf7 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Cerificete Phase C Goodlife.pdf7 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Vascon Goodlife Phase C.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Cerificete Phase C Goodlife.pdf31 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife Phase C July 24.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife Phase C Oct 24.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife Phase C April 24.pdf27 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Vascon Goodlife Phase C.pdf27 Dec 2024
Certificates of CA (Form 3)File: Goodlife Phase C Sep 24- RERA Form 3.pdf27 Dec 2024
Certificates of CA (Form 3)File: Goodlife Phase C June 24- RERA Form 3.pdf27 Dec 2024
Certificates of CA (Form 3)File: Goodlife Phase C Mar 24- RERA Form 3.pdf27 Dec 2024
Certificates of CA (Form 3)File: Goodlife Phase C Dec 23- RERA Form 3.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Phase C April 24.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Phase C July 24.pdf27 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Phase C Oct 24.pdf27 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Cerificete Phase C Goodlife.pdf27 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Goodlife Ph C.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form-5_FY 2023-24_Phase C.pdf27 Dec 2024
Certificates of CA (Form 3)File: Form 3 Goodlife PH C Sep 23.pdf2 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife Phase C Sep 23.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife Phase C Dec 23.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Phase C Sep 23.pdf29 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Phase C Dec 23.pdf29 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase C goodlife March 2023.pdf28 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Goodlife Ph C 2023.pdf28 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Rera Form 5 Katvi 16293.pdf28 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife PH C March 22.pdf10 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife Ph C Sep 2022.pdf10 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Goodlife Ph C Dec 2022.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife ph C March 2020.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Ph C March 2021.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Ph C March 2022.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Ph C Sep 2022.pdf10 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Goodlife Ph C Dec 2022.pdf10 Mar 2023
Disclosure of sold/ booked inventoryFile: Goodlife Phase C Sold Unit Inventory.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3 Goodlife Ph C March 2020.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3 Goodlife Ph C March 2021.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3 Goodlife Ph C March 2022.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3 Goodlife Ph C Sep 2022.pdf10 Mar 2023
Certificates of CA (Form 3)File: Form 3 Goodlife Ph C December 2022.pdf10 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Form 5 - Katvi - 16293.pdf9 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eng Cert Jan to June 2021 Phase C.pdf10 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 202021 Goodlife Phase C.pdf10 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certificate PH C 270721.pdf27 Jul 2021
OtherFile: Katvi - QA certificate (Phase C)-June 20.pdf9 Nov 2020
OtherFile: Katvi - QA certificate (Phase C) Sept 20.pdf9 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Goodlife Phase C - Form 5 FY 19-20.pdf5 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert - Phase C 2020.pdf3 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Katvi - QA certificate (Phase C) March 20.pdf17 Apr 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Goodlife Phase C 2019.pdf30 Jan 2020
Building plan approvalFile: BP Layout 2018.pdf20 Apr 2018
Layout approvalFile: BP Layout 2018.pdf20 Apr 2018
PAN CardFile: vascon engineers ltd PAN.pdf20 Apr 2018
Copy of the legal title reportFile: Supplementary Title Certificate Gat No 133.pdf20 Apr 2018
Copy of the legal title reportFile: Supplementary Title Certificate Gat No 135.pdf20 Apr 2018
Copy of the legal title reportFile: Title Certificate Gat No 78,79,80,132,134.pdf20 Apr 2018
Copy of the legal title reportFile: Title Certificate Gat No 78.pdf20 Apr 2018
Details of encumbrancesFile: Encumbrance Phase C.pdf20 Apr 2018
Copy of Layout Approval (in case of layout)File: BP Layout 2018.pdf20 Apr 2018
Building Plan Approval (IOD)File: BP Layout 2018.pdf20 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert 2018.pdf20 Apr 2018
Declaration in FORM BFile: Form B - Affidavit - Siddharth Vasudevan.pdf20 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Cert Phase C.pdf20 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Certificate KATVI Phase C rev.pdf20 Apr 2018
Certificates of CA (Form 3)File: CA Cert PHASE C.pdf20 Apr 2018
Proforma of Allotment letterFile: Draft Agreement to Sale.pdf20 Apr 2018
OtherFile: N A Order Katavi.pdf20 Apr 2018
OtherFile: PRESENT SITE LAYOUT.pdf20 Apr 2018
OtherFile: SITE PLAN TENTITIVE ROAD ALIGNMENT.pdf20 Apr 2018

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Forest CountyKharadi809CompletedDec 2017Apr 2017
Forest CountyKharadi809CompletedDec 2017Apr 2017
ELA HadapsarHadapsar94CompletedDec 2014Late, Jul 2017
EcoTowerBaner19CompletedAug 2014Late, Nov 2016
WillowsBaner160CompletedNov 2013Late, Apr 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vascon Goodlife Phase C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Katavi13,700+ in Pune

2 kmVascon Goodlife Phase CCompleted 29Lapsed / revoked 31Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 92 registered projects within 2 km.

Builder: Vascon Engineers Ltd

Vascon Engineers Ltd has 12 registrations on MahaRERA, including Vista II and Windermere Phase 1. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Vascon Goodlife Phase C shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Vascon Goodlife Phase C is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vascon Goodlife Phase C?

The registered promoter entity is Vascon Engineers Ltd, a company as per the filing. Its CIN L70100PN1986PLC175750 and GSTIN 27AAACV1249F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vascon Goodlife Phase C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vascon Goodlife Phase C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vascon Goodlife Phase C?

The professionals named in the filing: Architect: Ar. Sandeep Hardikar; Engineer: Dr. Santosh Sundarajan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vascon Goodlife Phase C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vascon Goodlife Phase C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vascon Goodlife Phase C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.