Home / Browse projects / Pune, Maharashtra / HAPPYCITY VARALE

Registered No litigation declared Others project

HAPPYCITY VARALE

By NAMRATA DEVELOPERS PRIVATE LIMITED

RG-MH-19167 · RERA P52100078221 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
116 of 193Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

HAPPYCITY VARALE is a Others project by NAMRATA DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100078221 on 29 Nov 2024. Possession is promised by 30 Dec 2027. 77 of the 193 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameHAPPYCITY VARALE
  • TypeOthers
  • Location
    • Talegaon-Ambi MIDC Road
    • Near HP Line Varale Phata
    • Varale
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • RERA no.P52100078221
  • ReraGenie IDRG-MH-19167

Builder

  • NameNAMRATA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsShailesh Kantilal Shah, Deepak Kantilal Shah
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed83 files

Current status

40%77 of 193 units booked
66.1%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A Wing A1NA13139510105
Building A Wing A2NA111179988

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

Building A Wing A140%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building A Wing A240%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes0%

Parking filed461

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots461
Closed/Covered17
Open Space444
BuildingClosed/CoveredOpen SpaceTotal
Building A Wing A19222231
Building A Wing A28222230

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,074 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Jun 2025
LandownerVillageDistrict
Rajashree Group of CompaniesWakadPune
Rupali Ganesh MhaskeKalasPune
Chaitrali Ravindra KalokheTalegaon Dabhade (M Cl)Pune
Ravindra Pandharinath KalokheTalegaon Dabhade (M Cl)Pune
Vinaya Rahul KalokheTalegaon Dabhade (M Cl)Pune
Rahul Pandharinath KalokheTalegaon Dabhade (M Cl)Pune
Sumitra Pandharinath KalokheTalegaon Dabhade (M Cl)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority, Pune
Permissible FSI13073.25
Proposed, not sanctioned10,948 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOffice No 101 and 102, First Floor, Next Gen Avenue,Bahiratwadi, Off Senapati Bapat Road, Pune 41101
Estimated costRs 30.24 cr
Cost incurredRs 20.00 cr
Work done66.13%
BuildingWingEstimatedIncurred
Building A Wing A1NARs 11.70 crRs 7.50 cr
Building A Wing A2NARs 11.70 crRs 7.50 cr
-NARs 6.83 crRs 5.00 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Mangesh Gotal
EngineerYogendra L Girase
EngineerDeepak Kanase
EngineerSanjivani Ade
Chartered AccountantSSAP & Associates LLP
Chartered AccountantC. Maneklal & CO
PartnerRole in project
NAMRATA DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: HCV_Form 1_31032026.pdf18 Apr 2026
Withdrawal Update Form 2File: HCV_A1A2 BLDG_Form 2_31032026.pdf18 Apr 2026
Withdrawal Update Form 3File: HCV_Form 3_31032026.pdf18 Apr 2026
Withdrawal Update Form 1File: Happycity Varale_Form 1_Dec 2025.pdf14 Jan 2026
Withdrawal Update Form 2File: HCV_Form 2_Dec 2025.pdf14 Jan 2026
Withdrawal Update Form 3File: HCV_Form 3_DEc 2025.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: hcv form 5_2024 25.pdf18 Oct 2025
Withdrawal Update Form 1File: HCV_Form1_Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: HCV_Form 2_Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: HCV_Form 3_Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 1File: HCV A1 A2_Form 1_30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Happycity Varale A1_A2_Form 2_30062025.pdf18 Jul 2025
Withdrawal Update Form 3File: HCV A1 A2_Form 3_30062025.pdf18 Jul 2025
Form 1File: HCV A1 A2_Form 1_30062025.pdf16 Jul 2025
Form 2File: Happycity Varale A1_A2_Form 2_30062025.pdf16 Jul 2025
Form 3File: HCV A1 A2_Form 3_30062025.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: HCV A1 A2_Sold Unsold Declaration_30062025.pdf16 Jul 2025
Form 120 Jun 2025
Form 220 Jun 2025
Form 3File: 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)_31032025.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory_31032025.pdf20 Jun 2025
Form 120 Jun 2025
Form 220 Jun 2025
Form 3File: 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)_31122024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory_31122024.pdf20 Jun 2025
Form 2A (FY 2024-2025)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)_2024-25.pdf20 Jun 2025
Disclosure of sold/ booked inventoryFile: Happycity Varale_Information of Sold_Booked Inventory.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Happycity Varale_Form 2A_2024-25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Happycity Varale_Form 1_March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Happycity Varale_Form 3_March 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Happycity Varale_Form 2_March 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Happycity Varale_Disclosure of sold_booked inventory.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Happycity Varale_CA Cert_Dec 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Happycity Varale_Engg Cert_Dec 2024_.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HCV A1-A2 BLDG_Architect Cert_Dec 2024.pdf16 Jan 2025
Building plan approvalFile: 5_5.pdf16 Nov 2024
Building plan approvalFile: Plan 4 Highlighted.pdf16 Nov 2024
Building plan approvalFile: Plan 4.pdf16 Nov 2024
Building plan approvalFile: Plan 4.pdf16 Nov 2024
Building plan approvalFile: Plan 4 Highlighted.pdf16 Nov 2024
Building plan approvalFile: 5_5.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4 Highlighted.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_5.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4 Highlighted.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_5.pdf16 Nov 2024
Other - FinanceFile: Clarification_difference in estimate cost and actaual cost.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HCV A1A2 CA Certificate_Form 3_24102024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HCV_A1A2_Engg Certifiacte_24102024.pdf24 Oct 2024
Declaration about Commencement CertificateFile: HCV A1A2_Declaration about commencment_24102024.pdf24 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Happycity Varale_Revised Commencement certificate_2024.pdf22 Oct 2024
Building plan approvalFile: 3_5_11zon.pdf19 Oct 2024
Building plan approvalFile: 2_5_11zon.pdf19 Oct 2024
Building plan approvalFile: 1_5_Edited.pdf19 Oct 2024
Layout approvalFile: 1_5_compressed.pdf19 Oct 2024
Copy of Layout Approval (in case of layout)File: 1_5_compressed.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HCV_A1A2_Form 1_19102024.pdf19 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 1_5_Edited.pdf19 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2_5_11zon.pdf19 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 3_5_11zon.pdf19 Oct 2024
Other - TechnicalFile: HCV_A1A2_Declaration about Sanction Plan_12062024.pdf12 Jun 2024
Other - TechnicalFile: Happycity Varale_Declaration Cum Undertaking.pdf25 May 2024
Deviation Report with respect to model copy of AgreementFile: HCV_A1A2 BLDG_Final Deviation wrt AGS.pdf20 May 2024
Proforma of Agreement for saleFile: HCV_Proforma of AGS_18052024.pdf20 May 2024
Proforma of Allotment letterFile: Model Draft of Allotment letter_18052024.pdf18 May 2024
Deviation Report with respect to Allotment letterFile: Deviation_Model Draft of allotment letter_18052024.pdf18 May 2024
Copy of the legal title reportFile: HCV A1A2 TSR.pdf17 May 2024
CERSAI detailsFile: HCV Cerdai_17052024.pdf17 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Happycity Varale_Separate Bank Account Declaration.pdf24 Apr 2024
Declaration in FORM BFile: Form B_Shailesh Kantilal Shah.pdf5 Apr 2024
Other - LegalFile: Developement Agreement_2016.pdf5 Apr 2024
Other - LegalFile: Suppliment_1_2018_11zon.pdf5 Apr 2024
Other - LegalFile: Supplement_2 Corrigendum To development Agreement_2021.pdf5 Apr 2024
Other - LegalFile: Supplement_3_2022_11zon.pdf5 Apr 2024
Other - TechnicalFile: Declaration about sanctioned buildings and execution status.pdf5 Apr 2024
Other - TechnicalFile: Architect Declaration for RERA.pdf5 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: NDPL_SKS_DKS_Disclosure of interest.pdf5 Apr 2024
PAN CardFile: NDPL Pan Card.pdf29 Mar 2024
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances concerned to legal.pdf29 Mar 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Eco city 2Survey no 27 part village varale taluka maval dist pune 410507556CompletedDec 2020Dec 2020
Weekender birds viewsurvey no 117 2 village khadkale taluka maval dist pune 412106258CompletedMay 2018May 2018

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HAPPYCITY VARALE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near HP Line Varale Phata13,700+ in Pune

Builder: NAMRATA DEVELOPERS PRIVATE LIMITED

NAMRATA DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including HAPPYCITY VARALE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if HAPPYCITY VARALE is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HAPPYCITY VARALE?

The registered promoter entity is NAMRATA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HAPPYCITY VARALE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HAPPYCITY VARALE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HAPPYCITY VARALE?

The professionals named in the filing: Architect: Ar Mangesh Gotal; Engineer: Yogendra L Girase; Engineer: Deepak Kanase; Engineer: Sanjivani Ade; Chartered Accountant: SSAP & Associates LLP; Chartered Accountant: C. Maneklal & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HAPPYCITY VARALE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HAPPYCITY VARALE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HAPPYCITY VARALE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.