Home / Browse projects / Mumbai Suburban, Maharashtra / VARDHMAN GRANDEUR

Registration lapsed Litigation declared Residential / Group Housing project

VARDHMAN GRANDEUR

By VARDHMAN DEVELOPERS LTD

RG-MH-10929 · RERA P51800005952 · Last updated on MahaRERA portal: 6 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date
  • Litigation declared, 1 case
  • 7 complaints at MahaRERA
  • Completion date moved by 63 months
  • 5 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
20 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 95%
7Complaints at MahaRERAon this registration
Jump to the 166 documents Report an error

VARDHMAN GRANDEUR is a Residential / Group Housing project by VARDHMAN DEVELOPERS LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005952 on 14 Aug 2017. Possession was promised by 31 Mar 2025 and is now 19 months past that date. The completion date has moved by 63 months from the original filing. 7 complaints are on record with the regulator.

At a glance

Project

  • NameVARDHMAN GRANDEUR
  • TypeResidential / Group Housing
  • Location
    • DAWOOD BAUG LANE
    • ANDHERI
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005952
  • ReraGenie IDRG-MH-10929

Builder

  • NameVARDHMAN DEVELOPERS LTD
  • Entity typeCompany
  • ChairpersonRAMESH BABULAL VARDHAN
  • Managing DirectorRAJESH BABULAL VARDHAN
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

19 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 30 Dec 2019)
  • Buildings3 building records
  • Documents filed166 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA160000
WING DNA160000
WING BNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 95%.

WING C92%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
WING D98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
WING B43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed151

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots151
Closed/Covered151
BuildingClosed/CoveredTotal
WING C8585
WING D6565
WING B11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,075 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ANDHERI KRUPA PRASAD CO-OP. HSG. SOCIETY LTD.AndheriMumbai Suburban

Approvals and building plan

Permissible FSI6000.0
Proposed, not sanctioned6,000 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Manekji Wadia Building, Nanik Motwani Marg, Fort, Mumbai - 400001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHAVIN MODI
EngineerPankaj Shah
Chartered AccountantTODI TULSYAN & CO
Chartered AccountantShravankumar Gandhi
PartnerRole in project
VARDHMAN DEVELOPERS LTD-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017813Dec 2019 → Mar 2024

Reason as filed by the promoterThe project got delayed due to severe impact of COVID-19 as well as very poor response from buyers to deal with financial crisis. Even existing allottees were not having arrangements. We took some time to arrange fund and approvals to complete the project. We need Six month extension u/s 7(3)of RERA to complete the project with OC. we will complete in the project within in the stipulated time given by planning Authority and thereafter we will take the necessary steps for inspection of the project till submission of satisfactory reports and simultaneously we will be submitting appropriate appli

EXT51800006385Dec 2019 → Jun 2022

Reason as filed by the promoterThe influx of Covid-19 and the consequent lockdown imposed by the Government has derailed our best laid plans. Suffice it to say that even today our offices are working at less than optimum capacity in accordance with the lockdown/restrictions imposed by the Government. Availability of labour is another serious issue that we are facing. As many as 6 (six) months’ worth of construction activity is already wasted due to the pandemic and it will still take some time for the development to be completely on track. This all has a domino effect on the project financials and also spirally increased th

EXT51800001459Dec 2019 → Dec 2020

Reason as filed by the promoter1) Approvals could not be availed due to the changes in guidelines and subsequently due to the implication of new DCPR 2034. Further transition polices for DCPR 2034 are also in process. 2) SWM NOC - Delay has been attributed due to the matter being sub-judice in the Hon’ble Supreme Court and subsequently, Bank Guarantee was submitted for getting the further approvals. 3) Due to unavailability of input material mainly sand and other material.

EXT51800013413Dec 2019 → Sep 2023

Reason as filed by the promoterDue to Covid-19 there was delay due to various factors such as labour, procurement of materials etc. and after the said delay certain amendments had to be carried out in the plans in lieu of DCPR 2034. The RCC work is almost complete We require another 9 months for completion of finishing work and obtaining Occupation Certificate.

EXT51800024670Dec 2019 → Mar 2025

Reason as filed by the promoterWe hereby declare that our above project has expired on 31.03.24 and we have submitted our application for extension for completion of the project valid till 31.03.2025 u/s of 7(3) of RERA. Our Project got delayed due to COVID impact, labour problem, market & financial crunch, non payment by allottees on time etc. We are clear and committed that our project will get complete by 31st March 2025

Litigation declared1

CaseCourtStatus
1047/2024/2024City Civil Court, DindoshiOngoing

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000397875YOGENDRA GOVIND MUZUMDARVardhman Developers Limited18/10/2023
CC006000000480299Viraj Ravindra PrabhawalkarVardhaman Developers Limited28/04/2024
CC12400399Priti Khelan ShahVARDHMAN DEVELOPERS LTD11/10/2024
CC12500371Eulalia Mary FernandesVARDHMAN DEVELOPERS LTD03/02/2025
CC12501674VARDHMAN DEVELOPERS LTDPRITI KHELAN SHAH24/05/2025
CC12502575Sohni Amin KheradaVARDHMAN DEVELOPERS LTD26/07/2025
CC12504544Amit Shailesh MunshiVARDHMAN DEVELOPERS LTD20/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed166

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30_9_24 signed.pdf6 Dec 2024
CERSAI detailsFile: CERSAI_Search_Report_200330444795_For_Asset_Based_Search_06_12_2024_14_32_44.pdf6 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 30_06_2024.pdf25 Nov 2024
Certificates of CA (Form 3)File: Form 3 as on 30_09_2024.pdf25 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 as on 30_6_24.pdf25 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 30_9_24.pdf25 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23_24.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30_6_24.pdf23 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_30 09 2024.pdf23 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From-5 VDL - Grandeur FY-2023-24.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: sold unsold disclosure_30_9_24.pdf12 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: format A (2).pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discl of Interest - Rajesh Vardhan.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discl of Interest - Ramesh Vardhan.pdf12 Nov 2024
Declaration in FORM BFile: Form B_31 3 2025.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31_3_24.pdf9 Oct 2024
Certificates of CA (Form 3)File: Form 3 as on 31 03 2024_compressed.pdf9 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_31_3_24.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1_31_12_23.pdf31 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_31_12_2023.PDF31 Jul 2024
Certificates of CA (Form 3)File: Form 3 as on 31_12_2023_compressed.pdf31 Jul 2024
Disclosure of sold/ booked inventoryFile: sold -booked inventory.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA FORM 5 Grandeur FY_2021_22.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 Grandeur FY-2022_23.pdf5 Jan 2024
Certificates of CA (Form 3)File: Form 3 as on 30_09_23_compressed.pdf21 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Grandeur (B,C,D) - 31 03 2022.pdf20 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: fORM 1 31 March 2023.pdf20 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 30 September 2023.pdf20 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 30 June 2023.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30 MAR 2023.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 30 JUNE 2023.pdf20 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30 SEPT 2023.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 2022_23.pdf20 Dec 2023
Certificates of CA (Form 3)File: Form 3 as on 31 MAR 2023.pdf20 Dec 2023
Certificates of CA (Form 3)File: Form 3 as on 30 JUNE 2023 compressed.pdf20 Dec 2023
Certificates of CA (Form 3)File: Form 3 as on 30 SEPT 2023.pdf20 Dec 2023
Declaration about Commencement CertificateFile: Decl about CC.pdf26 Oct 2023
Declaration in FORM BFile: form B_compressed.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: Vardhaman_Sold Booked Inv.PDF6 Feb 2023
Disclosure of sold/ booked inventoryFile: Vardhman_Sold Booked Inventory Disclosure.pdf4 Feb 2023
Building plan approvalFile: Drawing1.pdf30 Jan 2023
Building plan approvalFile: Drawing2.pdf30 Jan 2023
Building plan approvalFile: Drawing3.pdf30 Jan 2023
Building plan approvalFile: Drawing4.pdf30 Jan 2023
Building plan approvalFile: Drawing5.pdf30 Jan 2023
Building plan approvalFile: Drawing6.pdf30 Jan 2023
Building plan approvalFile: Drawing7.pdf30 Jan 2023
Building plan approvalFile: Drawing8.pdf30 Jan 2023
Building plan approvalFile: Drawing9.pdf30 Jan 2023
Building plan approvalFile: Drawing10.pdf30 Jan 2023
Building plan approvalFile: Drawing11.pdf30 Jan 2023
Building plan approvalFile: Drawing12.pdf30 Jan 2023
Building plan approvalFile: Drawing-13.pdf30 Jan 2023
Building plan approvalFile: Drawing-14.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing1.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing2.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing3.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing4.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing5.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing6.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing7.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing8.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing9.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing10.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing11.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing12.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing-13.pdf30 Jan 2023
Building Plan Approval (IOD)File: Drawing-14.pdf30 Jan 2023
Building plan approvalFile: 2345917Amendletter_signed.pdf28 Jan 2023
Building Plan Approval (IOD)File: 2345917Amendletter_signed.pdf28 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2350801_FurtherCC_signed.pdf28 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2358363_FurtherCC_signed.pdf28 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 0032 Rera Form 31 MAR 2022.pdf22 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 0032 Rera Form 30 JUNE 2022.pdf22 Jul 2022
Certificates of CA (Form 3)File: Form 3 CA CERTIFICATE 31 DEC 2021.pdf22 Jul 2022
Certificates of CA (Form 5)File: FORM 5.pdf22 Jul 2022
Building plan approvalFile: Andheri Amended IOD 3-9-2019.pdf17 Mar 2022
Building plan approvalFile: 0001.pdf17 Mar 2022
Building plan approvalFile: 0002.pdf17 Mar 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
VARDHMAN GALAXYMUMBAI74CompletedDec 2014Late, Oct 2015
VARDHMAN VISTAMUMBAI38CompletedApr 2014Late, Oct 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 63 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VARDHMAN GRANDEUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI6,700+ in Mumbai Suburban

2 kmVARDHMAN GRANDEURCompleted 129Lapsed / revoked 84Abeyance 1Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 361 registered projects within 2 km.

Builder: VARDHMAN DEVELOPERS LTD

VARDHMAN DEVELOPERS LTD has 6 registrations on MahaRERA, including VARDHMAN EMPIRE and VARDHMAN GRANDEUR. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that VARDHMAN GRANDEUR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VARDHMAN GRANDEUR is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VARDHMAN GRANDEUR?

The registered promoter entity is VARDHMAN DEVELOPERS LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VARDHMAN GRANDEUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VARDHMAN GRANDEUR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VARDHMAN GRANDEUR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VARDHMAN GRANDEUR?

The professionals named in the filing: Architect: BHAVIN MODI; Engineer: Pankaj Shah; Chartered Accountant: TODI TULSYAN & CO; Chartered Accountant: Shravankumar Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VARDHMAN GRANDEUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VARDHMAN GRANDEUR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VARDHMAN GRANDEUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.