Home / Browse projects / Nashik, Maharashtra / VARAD LAXMI APARTMENT

Completed No litigation declared Residential / Group Housing project

VARAD LAXMI APARTMENT

By SHIRISH DEVOLOPERS

RG-MH-14362 · RERA P51600033193 · Last updated on MahaRERA portal: 25 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

VARAD LAXMI APARTMENT is a Residential / Group Housing project by SHIRISH DEVOLOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600033193 on 9 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameVARAD LAXMI APARTMENT
  • TypeResidential / Group Housing
  • Location
    • S. NO. 21/1/1
    • PLOT NO. 4
    • 5
    • 6
    • GANESH NAGAR
    • OLD SAIKHEDA ROAD
    • Nashik
    • 422101
  • Pincode422101
  • RERA no.P51600033193
  • ReraGenie IDRG-MH-14362

Builder

  • NameSHIRISH DEVOLOPERS
  • Entity typePartnership
  • PartnersJYOTI ARUN MALVE, SAURAV ARUN MALVE, KAJAL SHIRISH MALVE
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Feb 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VARAD LAXMI DEPARTMENTNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

VARAD LAXMI DEPARTMENT: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area896 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3013.18
Proposed, not sanctioned3,013 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMITHILA BUILDING NASHIK ROAD NASHIK 422101

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogesh T Mahajan
EngineerMr. BHANUVILAS P. BHAWSAR
Chartered AccountantCA CHETAN BUMB
PartnerRole in project
SHIRISH DEVOLOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Feb 2025

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA VARAD LAXMI MAR 25.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FY-24-24 4 QTR.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA VARAD LAXMI MAR 25.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER FY-24-24 4 QTR.pdf25 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5.pdf11 Apr 2025
Other - TechnicalFile: FORM 4.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 23-24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 - Architect Q1_2425_Varad Laxmi.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 - Architect Q2_2425_Varad Laxmi.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 23-24_merged.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY24-25_merged.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 24-25_merged.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 24-25_merged.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer fy-23-24 q 4.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer fy-23-24 q 4.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer fy-24-25 q 1.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer fy-24-25 q 2.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer fy-24-25 q 3.pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NMC.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 22-23.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 FY 23-24.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 FY 23-24.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 23-24.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY 22-23.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 FY 23-24.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 FY 23-24.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 23-24.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 FY 22-23.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 23-24.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 FY 23-24.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 23-24.pdf11 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 RERA.PDF29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate APRIL 22.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate JULY 22.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate OCT 22.pdf22 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate JAN 23.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate APRIL 22.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate JULY 22.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate OCT 22.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate JAN 23.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q4.PDF22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q1.PDF22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q2.PDF22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q3.PDF22 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: shirish devoplopers-- RERA CA Certificate-Form 5.PDF30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: shirish devoplopers-- RERA CA Certificate-Form 5.PDF27 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: shirish devoplopers-- RERA CA Certificate-Form 5.PDF27 Sep 2022
Copy of the legal title reportFile: legal title report- NEW-compressed.pdf1 Feb 2022
Declaration about Commencement CertificateFile: declaration form D_new.pdf1 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200226487039_For_Debtor_Based_Search_23_12_2021_16_02_25_660.pdf4 Jan 2022
Layout approvalFile: Shirish Municipal Sheet 2-New approved plan_.pdf8 Dec 2021
Copy of Layout Approval (in case of layout)File: Shirish Municipal Sheet 2-New approved plan_.pdf8 Dec 2021
Disclosure of sold/ booked inventoryFile: INVENTORY DISCLOSURE-On Letterhead.pdf8 Dec 2021
Proforma of Allotment letterFile: Sale Deed - Varad Laxmi Apartment.pdf8 Dec 2021
OtherFile: LETTER OF AUTHORISATION- On Letterhead.pdf8 Dec 2021
Building plan approvalFile: Shirish Municipal Sheet 2-New approved plan_.pdf7 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Shirish Municipal Sheet 2-New approved plan_.pdf7 Dec 2021
Declaration in FORM BFile: affidavit cum declaration.pdf7 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf7 Dec 2021
PAN CardFile: shirish devolopers pan.PDF6 Dec 2021
Details of encumbrancesFile: NON ENCUBRANCE CERTIFICATE- On Letterhead.pdf6 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.PDF6 Dec 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER PROFORMA- On Letterhead.pdf6 Dec 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
HERAMBA APARTMENTPLOT NO.7 PANCHAK NASHIK 42210120CompletedDec 2021Jul 2021

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VARAD LAXMI APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GANESH NAGAR, OLD SAIKHEDA ROAD4,100+ in Nashik

Builder: SHIRISH DEVOLOPERS

Shirish Devolopers has 2 registrations on MahaRERA, including HERAMBA APARTMENT and VARAD LAXMI APARTMENT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if VARAD LAXMI APARTMENT is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VARAD LAXMI APARTMENT?

The registered promoter entity is SHIRISH DEVOLOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VARAD LAXMI APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VARAD LAXMI APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VARAD LAXMI APARTMENT?

The professionals named in the filing: Architect: Yogesh T Mahajan; Engineer: Mr. BHANUVILAS P. BHAWSAR; Chartered Accountant: CA CHETAN BUMB. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VARAD LAXMI APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VARAD LAXMI APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VARAD LAXMI APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.