ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Vandan Park 1

Registration lapsed No litigation declared Plotted project

Vandan Park 1

By Mandar Narendra Muley

RG-MH-48215 · RERA P50500049143 · Last updated on MahaRERA portal: 12 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
2 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Vandan Park 1 is a Plotted project by Mandar Narendra Muley in Nagpur, Maharashtra, registered with MahaRERA as P50500049143 on 1 Feb 2023. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 80 of the 82 units on this registration are recorded sold or booked.

At a glance

Project

  • NameVandan Park 1
  • TypePlotted
  • Location
    • Partwari Halka
    • Grampancayat Wela
    • Wela harichandra
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500049143
  • ReraGenie IDRG-MH-48215

Builder

  • NameMandar Narendra Muley
  • Entity typeIndividual

Key dates

10 months past promisethis monthRegisteredFeb 2023First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Feb 2023
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2024)
  • BuildingsNot stated in filing
  • Documents filed66 files

Current status

98%80 of 82 units booked

Figures as on 12 Feb 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 12 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,330 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Sep 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI16993.31
Proposed, not sanctioned16,993 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManewada Besa Road, Shahu Nagar, Nagpur

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Lamge
EngineerPrayas N Vaidya
EngineerPradip S Kulkarni
Chartered AccountantCA Amey Dabke
PartnerRole in project
Mandar Narendra Muley-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500025895Dec 2024 → Dec 2025

Reason as filed by the promoterWe have received RL for 68 plots which is 82% completion of work, due to labour issues we were not able to complete the project, we are in the process of completing the project as early as possible, please grant the extension so we can regularize the compliances.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec-24 VP.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec-24 VP.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec-24 VP.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: SandU Dec-24 VP.pdf12 Feb 2025
Declaration in FORM BFile: Form B Mandar Muley.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31-03-24 vandan park 1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-06-24 Vandan Park 1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-09-24 Vandan Park 1.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: S and U 31-03-2024.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: S and U 30-06-24 vandan park 1.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: S and U 30-09-24 Vandan Park 1.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 March-24 Vandan Park 1.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 June 24 Vandan Park 1.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sep-24 Vandan Park 1.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 3 March-24 Vandan Park 1.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24_signed.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2024.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf11 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 31-03-2024.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: soldunsold.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30-06-23.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 31-03-23 ar.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30-09-23 ar.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2023 en.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-06-23 en.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-09-2023 en.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Index Vandan Park.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mandar Muley form 5 Updated.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ar certificate sep 23.pdf10 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29 30-09-2023.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2023.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2023.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 2023.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MANDAR MULEY_compressed.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30-06-23.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30-09-23 ar.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 31-03-23 ar.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-06-23 en.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-09-2023 en.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2023 en.pdf8 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Qulity assurance certificate.pdf8 Jan 2024
Copy of the legal title reportFile: New Legal Tital Report.pdf25 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: New Bank Declration Certificate.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: edited organised architecht cirtificate.pdf13 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Velahari 160 (2).pdf11 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment letter.pdf11 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Model Form of Agreement.pdf11 Jan 2023
Layout approvalFile: Sanctioned Map_compressed.pdf10 Jan 2023
Copy of Layout Approval (in case of layout)File: Sanctioned Map_compressed.pdf10 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_.pdf10 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cirtificate to_org Final organized_compressed.pdf10 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: `partner interest.pdf10 Jan 2023
Proforma of Allotment letterFile: Annexure 1 Allotment Letter (1)_compressed.pdf10 Jan 2023
Building plan approval or NA orderFile: NA Order.pdf9 Jan 2023
PAN CardFile: Pan Card.pdf9 Jan 2023
Details of encumbrances concerned to FinanceFile: Financial Leagal Marged.pdf9 Jan 2023
Details of encumbrances concerned to LegalFile: Financial Leagal Marged.pdf9 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf9 Jan 2023
Declaration about Commencement CertificateFile: Declaration About commencemnt certificate0202023.pdf9 Jan 2023
Declaration in FORM BFile: Form B.pdf9 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure - B Enhineer's Certificate.pdf9 Jan 2023
Proforma of Agreement for saleFile: Format Of Agreement To Sale_compressed.pdf9 Jan 2023

How this compares with Nagpur

98%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vandan Park 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Grampancayat Wela2,800+ in Nagpur

2 kmVandan Park 1Completed 6Lapsed / revoked 10Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: Mandar Narendra Muley

Mandar Narendra Muley has 1 registration on MahaRERA, including Vandan Park 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that Vandan Park 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Vandan Park 1 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vandan Park 1?

The registered promoter entity is Mandar Narendra Muley, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vandan Park 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vandan Park 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vandan Park 1?

The professionals named in the filing: Architect: Umesh Lamge; Engineer: Prayas N Vaidya; Engineer: Pradip S Kulkarni; Chartered Accountant: CA Amey Dabke. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vandan Park 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vandan Park 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vandan Park 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.