VALENCIA PHASE THREE

By SHETE PATIL DEVELOPERS AOP

RG-MH-80548 · RERA P52200054153 · Last updated on MahaRERA portal: 3 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
1 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 50%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

VALENCIA PHASE THREE is a Residential / Group Housing project by SHETE PATIL DEVELOPERS AOP in Ahmednagar, Maharashtra, registered with MahaRERA as P52200054153 on 29 Dec 2023. Possession is promised by 30 Nov 2026.

At a glance

Project

  • NameVALENCIA PHASE THREE
  • TypeResidential / Group Housing
  • Location
    • AGASTI SUGAR FACTORY ROAD
    • VALENCIA GANESH VIHAR COLONY
    • Akola
    • Ahmednagar
    • 422601
  • Pincode422601
  • RERA no.P52200054153
  • ReraGenie IDRG-MH-80548

Builder

  • NameSHETE PATIL DEVELOPERS AOP
  • Entity typeOthers
  • MembersBHAGWAT RAOSAHEB SHETE SHETE, DATTATRAY RAOSAHEB SHETE SHETE, SHANTARAM RAOSAHEB SHETE SHETE, RAOSAHEB RABHAJI SHETE SHETE
  • MmeberGORAKH RAOSAHEB SHETE SHETE
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2023
  • Promised completion30 Nov 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B1NA60000
BUILDING A2NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 50%.

BUILDING B118%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
BUILDING B133
BUILDING A211

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,978 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHETE PATIL DEVELOPERSAkolaAhmednagar

Approvals and building plan

Permissible FSI4564.04
Proposed, not sanctioned4,564 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo 153/1 and 153/2, Ground Floor, Smrutigandh, Kolhar Ghoti Road, Mahalaxmi Colony, Akole Ahmednagar - 422601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATPUTE PRIYANKA
EngineerPARMANAND BHASKAR SHINDE
Chartered AccountantNIKHIL KASAT
PartnerRole in project
SHETE PATIL DEVELOPERS AOP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Phase Three June 2024.pdf3 Dec 2025
Form 2File: Form 2 Phase Three June 2024.pdf3 Dec 2025
Form 3File: VALENCIA PHASE THREE JUNE -2024.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 01-07-2024.pdf3 Dec 2025
Form 1File: Form 1 Phase Three September 2024.pdf3 Dec 2025
Form 2File: Form 2 Phase Three September 2024.pdf3 Dec 2025
Form 3File: VALENCIA PHASE THREE September-2024.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 03-10-2024.pdf3 Dec 2025
Form 1File: FORM 1 VALENCIA PHASE THREE DEC 2024.pdf3 Dec 2025
Form 2File: FORM 2 VALENCIA PHASE THREE DEC 24.pdf3 Dec 2025
Form 3File: FORM 3 VALENCIA PHASE THREE DEC 24.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 05-01-2025.pdf3 Dec 2025
Form 1File: FORM-1 (JANUARY-MARCH 2025) .pdf3 Dec 2025
Form 2File: FORM -2 (JANUARY-MARCH 2025) .pdf3 Dec 2025
Form 3File: FORM 3 VALENCIA P-3 MARCH 2025.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 2-04-2025.pdf3 Dec 2025
Form 1File: FORM -1 (APRIL-JUNE 2025) .pdf3 Dec 2025
Form 2File: FORM-2 (APRIL-JUNE 2025) .pdf3 Dec 2025
Form 3File: FORM 3 VALENCIA P-3 JUNE 2025.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 2-7-2025.pdf3 Dec 2025
Form 1File: FORM -1 (JULY- SEPTEMBER 2025) .pdf3 Dec 2025
Form 2File: FORM-2 (JULY-SEPTEMBER 2025) .pdf3 Dec 2025
Form 3File: FORM 3 VALENCIA P-3 SEPT 2025.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 2-10-2025.pdf3 Dec 2025
Form 1File: FORM 1 VALENCIA PHASE THREE DATED DEC 23.pdf2 Dec 2025
Form 2File: FORM 2 VALENCIA PHASE THREE DT DEC 23.pdf2 Dec 2025
Form 3File: FORM 3 VALENCIA PHASE THREE DEC 23.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 06-01-2024.pdf2 Dec 2025
Form 1File: Form 1 Phase Three March 2024.pdf2 Dec 2025
Form 2File: Form 2 Phase Three March 2024.pdf2 Dec 2025
Form 3File: VALENCIA PHASE THREE MARCH -2024.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 02-04-2024.pdf2 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VALENCIA PHASE THREE DEC 2024.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VALENCIA PHASE THREE DEC 24.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VALENCIA PHASE THREE DEC 24.pdf16 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase Three Form 5 23-24.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase Three March 2024.pdf3 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase Three June 2024.pdf3 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase Three September 2024.pdf3 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VALENCIA PHASE THREE MARCH -2024.pdf3 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VALENCIA PHASE THREE JUNE -2024.pdf3 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VALENCIA PHASE THREE September-2024.pdf3 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Three March 2024.pdf3 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Three June 2024.pdf3 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Three September 2024.pdf3 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Phase Three 2023-2024.pdf3 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: Phase Three Sold Unsold.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf9 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf9 Jan 2024
Other - TechnicalFile: Speed Post.pdf3 Dec 2023
Other - TechnicalFile: Post Delivery.pdf3 Dec 2023
Building plan approvalFile: Building Plan with Area.pdf21 Nov 2023
Layout approvalFile: Layout Plan with Area Final.pdf21 Nov 2023
Copy of Layout Approval (in case of layout)File: Layout Plan with Area Final.pdf21 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan with Area.pdf21 Nov 2023
Other - TechnicalFile: Land Area Declaration_compressed.pdf20 Nov 2023
Other - TechnicalFile: Akole Nagarpanchayat Mail Confirmation.pdf9 Nov 2023
Copy of the legal title reportFile: Legal Title Report.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf3 Nov 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf3 Nov 2023
Proforma of Agreement for saleFile: AFS Phase III.pdf3 Nov 2023
Proforma of Allotment letterFile: AL Corrected.pdf3 Nov 2023
Deviation Report with respect to Allotment letterFile: No Deviation AL.pdf3 Nov 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation AFS.pdf3 Nov 2023
Other - TechnicalFile: Email Screenshot.pdf3 Nov 2023
Other - TechnicalFile: Akole Nagarpanchayat Mail.pdf14 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Gorakh.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Shantaram.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Raosaheb.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dattatray.pdf5 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Bhagwat.pdf5 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Building Permission Renewal.pdf2 Sep 2023
Declaration about Commencement CertificateFile: Yearly Renewal CC.pdf2 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA CERTIFICATE.pdf2 Sep 2023
Other - TechnicalFile: PLINTH Certificate.pdf2 Sep 2023
Other - TechnicalFile: PLINTH INTIMATION.pdf2 Sep 2023
Details of encumbrances concerned to FinanceFile: N ENCUM ALL PHASE 3.pdf4 Aug 2023
Details of encumbrances concerned to LegalFile: N ENCUM ALL PHASE 3.pdf4 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VALENCIAP52200029222GANESH VIHAR COLONY, Ahmednagar48May 2021OngoingApr 2023Not delivered

How this compares with Ahmednagar

7%of Ahmednagar projects moved their completion datethis one has not
28%of Ahmednagar registrations have lapsed or been cancelledthis one is on the register

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep VALENCIA PHASE THREE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VALENCIA GANESH VIHAR COLONY490+ in Ahmednagar

Builder: SHETE PATIL DEVELOPERS AOP

SHETE PATIL DEVELOPERS AOP has 1 registration on MahaRERA, including VALENCIA PHASE THREE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What are my rights if VALENCIA PHASE THREE is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VALENCIA PHASE THREE?

The registered promoter entity is SHETE PATIL DEVELOPERS AOP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VALENCIA PHASE THREE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VALENCIA PHASE THREE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VALENCIA PHASE THREE?

The professionals named in the filing: Architect: SATPUTE PRIYANKA; Engineer: PARMANAND BHASKAR SHINDE; Chartered Accountant: NIKHIL KASAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VALENCIA PHASE THREE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VALENCIA PHASE THREE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VALENCIA PHASE THREE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.