Completed No litigation declared Residential / Group Housing project

VALENCIA

By SHETE PATIL DEVELOPERS

RG-MH-13872 · RERA P52200029222 · Last updated on MahaRERA portal: 2 Jan 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 60%
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

VALENCIA is a Residential / Group Housing project by SHETE PATIL DEVELOPERS in Ahmednagar, Maharashtra, registered with MahaRERA as P52200029222 on 10 May 2021. The registration is recorded completed; possession was promised by 31 Mar 2024. The completion date has moved by 11 months from the original filing.

At a glance

Project

  • NameVALENCIA
  • TypeResidential / Group Housing
  • Location
    • AGASTI SUGAR FACTORY RAOD
    • GANESH VIHAR COLONY
    • Akola
    • Ahmednagar
    • 422601
  • Pincode422601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52200029222
  • ReraGenie IDRG-MH-13872

Builder

  • NameSHETE PATIL DEVELOPERS
  • Entity typeOthers
  • Named personsBHAGWAT RAOSAHEB SHETE, GORAKSH RAOSAHEB SHETE, DATTATRAY RAOSAHEB SHETE, SHANTARAM RAOSAHEB SHETE, RAOSAHEB RABHAJI SHETE

Key dates

this monthRegisteredMay 2021First promiseApr 2023Revised toMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2021
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 1 Apr 2023)
  • Buildings2 building records
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A1NA60000
ROW BNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 60%.

BUILDING A172%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,964 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHETE PATIL DEVELOPERSAkolaAhmednagar

Approvals and building plan

Permissible FSI3902.13
Proposed, not sanctioned3,902 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR SARDA PETROL PUMP , KOLHAR GHOTI HIGHWAY, AKOLE, TALUKA AKOLE, DISTRICT AHMEDNAGAR 422 601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATPUTE PRIYANKA AMOL
EngineerPARMANAND BHASKAR SHINDE
Chartered AccountantVIKAS S VAIDYA
PartnerRole in project
SHETE PATIL DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52200015370Apr 2023 → Mar 2024

Reason as filed by the promoterThe above extension proposed is due to change in Layout Approval and Building Plan Approval and commencement certificate obtained dated 17/03/2022. The project is sanctioned now at full capacity due to which it will consume extra time to complete the project. Hence, we propose to apply for extension of completion date of the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Nov 2024

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase Two Form 5 23-24.pdf2 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ROW B COMPLETION.pdf20 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BUILD A1 COMPLETION.pdf20 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Phase Two.pdf20 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Phase Two.pdf20 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ROW B COMPLETION.pdf20 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BUILD A1 COMPLETION.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase Two March 2024.pdf3 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase Two June 2024.pdf3 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase Two September 2024.pdf3 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Phase Two December 2023.pdf3 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase Two Dec 2023.pdf3 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Valencia phase Two March -2024.pdf3 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Valencia Phase Two June -2024.pdf3 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: valencia Phase Two September-2024.pdf3 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Two March 2024.pdf3 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Two September 2024.pdf3 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Two June 2024.pdf3 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Two December 2023.pdf3 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Phase Two 2020-2021.pdf3 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Phase Two 2021 -2022.pdf3 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Phase Two 2022-2023.pdf3 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Phase Two 2023-2024.pdf3 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VALENCIA PHASE TWO QUARTER SEPT 2023_compressed.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VALENCIA PHASE TWO QUARTER SEPT 2023_compressed.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VALENCIA PHASE TWO QUARTER SEPT 2023_compressed.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 phase Two Aug 23.pdf30 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A June 2023.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 phase 2 june 2023.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 phase 2 june 2023.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE june2023.pdf21 Aug 2023
Disclosure of sold/ booked inventoryFile: PHASE 02 BOOKED INVENTORY (3).pdf21 Aug 2023
Declaration about Commencement CertificateFile: Declaration About Commencemnt certificate (2).pdf14 Aug 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY.pdf14 Aug 2023
Declaration in FORM BFile: FORM B Phase Two_compressed (1).pdf4 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A March 2022 (5).pdf3 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A March 2023 (3).pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3 phase Two 2022.pdf3 Aug 2023
Layout approvalFile: VALENCIA PHASE TWO MARKING (2)_compressed.pdf26 Jul 2023
Copy of Layout Approval (in case of layout)File: VALENCIA PHASE TWO MARKING (2)_compressed.pdf26 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200273210792_For_Asset_Based_Search_02_07_2023_13_50_05_777 (1).pdf26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate (2)_compressed.pdf1 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE (1)_compressed.pdf1 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A DECEMBER 2021.pdf1 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A DECEMBER 2022_compressed.pdf1 Jun 2023
Layout approvalFile: NA LAYOUT (1)_compressed.pdf15 Apr 2023
Layout approvalFile: LAYOUT (3)_compressed.pdf15 Apr 2023
Building plan approvalFile: BUILDING B1 B2 B3 (1)_compressed.pdf15 Apr 2023
Building plan approvalFile: BUILDING A1_compressed.pdf15 Apr 2023
Copy of Layout Approval (in case of layout)File: NA LAYOUT (1)_compressed.pdf15 Apr 2023
Copy of Layout Approval (in case of layout)File: LAYOUT (3)_compressed.pdf15 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING B1 B2 B3 (1)_compressed.pdf15 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING A1_compressed.pdf15 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: REVISED BUILDING PERMISSIONS (1).pdf15 Apr 2023
Declaration about Commencement CertificateFile: 1 Declaration in FORM B.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Priyanka Architects Document (1)_compressed.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf31 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Phase Two Valencia 21-22 (1).pdf31 Mar 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter (1).pdf31 Mar 2023
PAN CardFile: SHETE PATIL DEVELOPERS GST.pdf1 May 2021
PAN CardFile: FINAL BIG ADHAR PAN SINGLE.pdf1 May 2021
PAN CardFile: FINAL BIG ADHAR PAN SINGLE.pdf1 May 2021
Proforma of Allotment letterFile: VALENCIA ALLOTMENT LETTER.pdf1 May 2021
Building plan approvalFile: BUILDING A1.pdf29 Apr 2021
Building plan approvalFile: BUILDING A SECTION.pdf29 Apr 2021
Building plan approvalFile: ROW HOUSE B.pdf29 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING A1.pdf29 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING A SECTION.pdf29 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: ROW HOUSE B.pdf29 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: ORDER RENEWAL 1.pdf28 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: ORDER RENEWAL 2.pdf28 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf24 Apr 2021
Layout approvalFile: Final NA order 128-20190107110800.pdf17 Apr 2021
Layout approvalFile: LAYOUT.pdf17 Apr 2021
Building plan approvalFile: NA ORDER.pdf17 Apr 2021
PAN CardFile: PAN CARD.pdf17 Apr 2021
Copy of the legal title reportFile: VALENCIA COPY OF LEGAL REPORT.pdf17 Apr 2021

How this compares with Ahmednagar

7%of Ahmednagar projects moved their completion datethis one moved by 11 months
28%of Ahmednagar registrations have lapsed or been cancelledthis one is completed

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep VALENCIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GANESH VIHAR COLONY490+ in Ahmednagar

2 kmVALENCIACompleted 14Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: SHETE PATIL DEVELOPERS

SHETE PATIL DEVELOPERS has 1 registration on MahaRERA, including VALENCIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What are my rights if VALENCIA is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VALENCIA?

The registered promoter entity is SHETE PATIL DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VALENCIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VALENCIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VALENCIA?

The professionals named in the filing: Architect: SATPUTE PRIYANKA AMOL; Engineer: PARMANAND BHASKAR SHINDE; Chartered Accountant: VIKAS S VAIDYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VALENCIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VALENCIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VALENCIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.