USHAJOSHI PARK PHASE II

By J K T GROUP

RG-MH-57045 · RERA P51700007222 · Last updated on MahaRERA portal: 22 May 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
33 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

USHAJOSHI PARK PHASE II is a Residential / Group Housing project by J K T GROUP in Thane, Maharashtra, registered with MahaRERA as P51700007222 on 17 Aug 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameUSHAJOSHI PARK PHASE II
  • TypeResidential / Group Housing
  • Location
    • Khadavali
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700007222
  • ReraGenie IDRG-MH-57045

Builder

  • NameJ K T GROUP
  • Entity typePartnership
  • PartnersSALMAN ABUBAKAR THITTOO, VINAYAK ANANT JOSHI, ANANTAJI KRISHNA JOSHI
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

40 months past promisethis monthRegisteredAug 2017First promiseDec 2021Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Dec 2021)
  • Buildings4 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B2NA40000
F1NA40000
C1NA40000
BUILDING A, WING-BNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 80%.

B291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C164%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
BUILDING A, WING-B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Open Space4
BuildingOpen SpaceTotal
B211
F111
C111
BUILDING A, WING-B11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ANANTA KRISHNAJI JOSHINadgaonThane

Approvals and building plan

Permissible FSI6700.0
Proposed, not sanctioned6,103 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANDA TITWAL TAL-KALYAN THANE MAHARASHTRA 421605

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS K CONSULTANTS
EngineerS K CONSULTANTS
PartnerRole in project
J K T GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700011601Dec 2021 → Jun 2023

Reason as filed by the promoterwe hereby apply extension of the project Name USHA JOSHI PARK PHASE II registered with the regulatory authority vide project registration certificate bearing No. P517000007222 which expire on 30/12/2021. due to COVID 19 Pandemic and Lockdown situation, we request you good self to give us extension up to 30/06/2023.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: ENCRUBANCE.pdf22 May 2023
Details of encumbrances concerned to LegalFile: ENCRUBANCE.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Merg_compressed.pdf22 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Meg_compressed (1).pdf22 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: J K T Group Form 2A 2021-22.pdf22 May 2023
Certificates of CA (Form 3)File: Form3 CA Certificate-31-03-2022_compressed.pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Razi.pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Salma.pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Other Real Estate.pdf22 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 31-03-2022_compressed.pdf22 May 2023
Proforma of Agreement for saleFile: Agreement Draft JKT Group.pdf22 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperat Bank Account.pdf22 May 2023
Deviation Report with respect to Allotment letterFile: Declaration for Agreement and Allotment.pdf22 May 2023
Deviation Report with respect to model copy of AgreementFile: Declaration for Agreement and Allotment.pdf22 May 2023
Disclosure of sold/ booked inventoryFile: Form D Desclouser of Inventries_compressed.pdf29 Mar 2022
Declaration about Commencement CertificateFile: Declaration for CC.pdf16 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J K T Group Form 1 2019_compressed.pdf16 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: J K T Group Form 1 31-03-2020_compressed.pdf16 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2021_compressed.pdf16 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: J K T Group Form 2 2019_compressed.pdf16 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: J K T Group Form 2 31-03-2020_compressed.pdf16 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-2021_compressed.pdf16 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: J K T Group Form 2A 30-09-2020_compressed.pdf16 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: J K T Group Form 2A 30-09-2021_compressed.pdf16 Mar 2022
Disclosure of sold/ booked inventoryFile: Form D Desclouser Inventries_compressed.pdf16 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200232632062_For_Asset_Based_Search_16_03_2022_17_20_06_256.pdf16 Mar 2022
Certificates of CA (Form 3)File: CA Certificate J K T Group 2019_compressed.pdf16 Mar 2022
Certificates of CA (Form 3)File: CA Certificate J K T Group 2020_compressed.pdf16 Mar 2022
Certificates of CA (Form 3)File: CA Certificate J K T Group 2021_compressed.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 JKT Group 2019.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 JKT Group 31032020.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 JKT Group 31032021.pdf16 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A Wing B Form 1.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C1 Form 1 .pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B2 Form 1.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F1 Form 1.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A Wing B Form 2.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: B2 Form 2.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: C1 Form 2.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F1 Form 2.pdf15 Oct 2018
Certificates of CA (Form 3)File: Form 3.pdf15 Oct 2018
Certificates of CA (Form 5)File: form 5.pdf15 Oct 2018
Layout approvalFile: LAY OUT.pdf31 Jul 2017
Building plan approvalFile: LAY OUT.pdf31 Jul 2017
PAN CardFile: pan grp.pdf31 Jul 2017
Copy of the legal title reportFile: TITLE CERT.pdf31 Jul 2017
Details of encumbrancesFile: ENCOM.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAY OUT.pdf31 Jul 2017
Building Plan Approval (IOD)File: LAY OUT.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf31 Jul 2017
Declaration in FORM BFile: FORM B 004.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 A WING B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 B2.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 C1.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 F1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 A WING-B.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 B2.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 C1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 F1.pdf31 Jul 2017
Certificates of CA (Form 3)File: form 3 CA Cert.pdf31 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep USHAJOSHI PARK PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khadavali7,600+ in Thane

2 kmUSHAJOSHI PARK PHASE IICompleted 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: J K T GROUP

J K T GROUP has 2 registrations on MahaRERA, including USHAJOSHI PARK PHASE II and USHA JOSHI PARK PHASE III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that USHAJOSHI PARK PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if USHAJOSHI PARK PHASE II is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of USHAJOSHI PARK PHASE II?

The registered promoter entity is J K T GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in USHAJOSHI PARK PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for USHAJOSHI PARK PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at USHAJOSHI PARK PHASE II?

The professionals named in the filing: Architect: S K CONSULTANTS; Engineer: S K CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in USHAJOSHI PARK PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About USHAJOSHI PARK PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save USHAJOSHI PARK PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.