ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / Usha Enclave

Completed No litigation declared Others project

Usha Enclave

By Kalash Developers

RG-MH-52933 · RERA P53100050076 · Last updated on MahaRERA portal: 23 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Apr 2026Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Internal walls, 95%
11 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Usha Enclave is a Others project by Kalash Developers in Sangli, Maharashtra, registered with MahaRERA as P53100050076 on 13 Mar 2023. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 4 months from the original filing. 9 of the 20 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameUsha Enclave
  • TypeOthers
  • Location
    • Mangalmurti Colony
    • Mangalmurti Colony
    • Sangli
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100050076
  • ReraGenie IDRG-MH-52933

Builder

  • NameKalash Developers
  • Entity typePartnership
  • PartnersNitesh Vilasrao Pawar, Prakash Laxmanrao Patil, Sachinkumar Anant Gudale
  • Other registrations3 more →
  • Completed4 of 4

Key dates

this monthRegisteredMar 2023First promiseDec 2025Revised toApr 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Mar 2023
  • Promised completion30 Apr 2026
  • Revised completionRevised to 30 Apr 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed87 files

Current status

45%9 of 20 units booked
81.1%Work done, per cost certificate

Figures as on 23 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Usha EnclaveNA8720020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Usha Enclave: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 23 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered40
Open Space40

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area488 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
Ushadevi Sadashiv GaikwadNeralRaigarh

Approvals and building plan

Sanctioning authoritySangli Miraj and Kupwad City Municipal Corporation
Permissible FSI1561.6
Proposed, not sanctioned1,549 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchYash Avenue, 120/A, Ram Mandir Corner, Sangli-Miraj Road, Sangli-416416
Estimated costRs 2.81 cr
Cost incurredRs 2.28 cr
Work done81.08%
BuildingWingEstimatedIncurred
Usha EnclaveNARs 2.41 crRs 2.23 cr
-NARs 40.15 lakhRs 4.50 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash L Patil
EngineerPravin Pise
EngineerMarkarand M Shinde
Chartered AccountantR K Kale & Associates
Chartered AccountantMs D V Patil and Co
Chartered AccountantNursal Banu Sayed
PartnerRole in project
Kalash Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03122518515Dec 2025 → Apr 2026

Reason as filed by the promoterWe request an extension of the project timeline because the planning authority is in the process of approving additional FSI for the project. Using this extra FSI will require additional construction work, which will take further time to complete the project. Since we do not want to compromise on the quality of the project and must finish the work as per the revised approvals, we are seeking the Authority’s permission for an extension so we can complete the project properly and hand over possession to all allottees peacefully. Given the circumstances, we kindly request an extension until 30-04

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Usha Dec 25.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Usha Dec 25.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3_KL_Dec 25.pdf23 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Usha Enclave for FY 2024-25.pdf27 Nov 2025
Withdrawal Update Form 1File: Form 1_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2_Kalash_Sep 25.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_KalashSep 25.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_KalashSep 25.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_KalashSep 25.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_KalashSep 25.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_KalashSep 25.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3_KalashSep 25.pdf7 Nov 2025
Layout approvalFile: KALASH.PDF29 Apr 2025
Copy of Layout Approval (in case of layout)File: KALASH.PDF29 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Kalash Revised Building Permission.pdf29 Apr 2025
Declaration about Commencement CertificateFile: Format D.pdf29 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - FY 2023-24.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_KL_Mar 25-compressed.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_KL_Mar 25.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_KL_Mar 25.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory KL Mar 25.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_KL_2023-24.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 KL Dec 24.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 KL Dec 24-compressed.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 KL Dec 24.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory KL Dec 24.pdf25 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Usha_Mar 2024.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_KL_Sep 24.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 KL Sep 24.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 KL Sep24.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: KL_UNSOLD INVENTORY_JUNE 24.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory_KL_Sep24.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KL_FORM 1_JUNE 24.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KL_FORM 2_JUNE 24.pdf20 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: KL_UNSOLD INVENTORY_JUNE 24.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KL_FORM 3_JUNE 24.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KL_FORM 1_MAR 24.pdf21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KL_FORM 2_MAR 24.pdf21 Apr 2024
Disclosure of sold/ booked inventoryFile: KL_UNSOLD_MAR 24.pdf21 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KL_FORM 3_MAR 24.pdf21 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Kalash_Dec23.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_KL_Dec23_11zon.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_KL_Dec23_11zon.pdf12 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Usha Enclave.pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KL Form 1 Sep 23.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KL Form 2 Sep 23.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KL Form 3 Sep 23_compressed.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Usha Enclave as on 2022-23.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KL Form 3 Jun 23_compressed (1).pdf24 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KL Form 1 Jun 23.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KL Form 2 Jun 23.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KL_Arch_Q4_22-23.pdf25 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KL_Engg_Q4_22-23.pdf25 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KL_CA_Q4_22-23_compressed.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KL_Arch_Q4_22-23.pdf23 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KL_Engg_Q4_22-23.pdf23 May 2023
Proforma of Agreement for saleFile: AFS_Usha Enclave_Kalash Developers_02032023.pdf3 Mar 2023
Deviation Report with respect to model copy of AgreementFile: New Deviation Report Agreement for Sale_Compressed.pdf3 Mar 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf25 Feb 2023
Layout approvalFile: Kalash SMKC Plan -Compressed.pdf20 Feb 2023
Building plan approvalFile: Kalash SMKC Plan -Compressed.pdf20 Feb 2023
Copy of the legal title reportFile: Kalash Search Report_Compressed.pdf20 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Legal.pdf20 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finance.pdf20 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter Legal.pdf20 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter Finance.pdf20 Feb 2023
Copy of Layout Approval (in case of layout)File: Kalash SMKC Plan -Compressed.pdf20 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Kalash SMKC Plan -Compressed.pdf20 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Kalash CC.pdf20 Feb 2023
Declaration in FORM BFile: Form B promoter.pdf20 Feb 2023

How this compares with Sangli

45%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one moved by 4 months
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep Usha Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mangalmurti Colony, Sangli790+ in Sangli

Builder: Kalash Developers

Kalash Developers has 4 registrations on MahaRERA, including KUMKUM Sector 7 Building 23 Wing F and AAI CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if Usha Enclave is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Usha Enclave?

The registered promoter entity is Kalash Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Usha Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Usha Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Usha Enclave?

The professionals named in the filing: Architect: Prakash L Patil; Engineer: Pravin Pise; Engineer: Markarand M Shinde; Chartered Accountant: R K Kale & Associates; Chartered Accountant: Ms D V Patil and Co; Chartered Accountant: Nursal Banu Sayed. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Usha Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Usha Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Usha Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.