Registration lapsed No litigation declared Residential / Group Housing project

URJIT PARK

By INFINITE BUILD & COATS PVT LTD

RG-MH-90383 · RERA P51600051942 · Last updated on MahaRERA portal: 31 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
17 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

URJIT PARK is a Residential / Group Housing project by INFINITE BUILD & COATS PVT LTD in Nashik, Maharashtra, registered with MahaRERA as P51600051942 on 13 Jul 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 1 of the 18 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameURJIT PARK
  • TypeResidential / Group Housing
  • Location
    • OFF GANGAPUR ROAD
    • JALALPUR
    • Nashik
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600051942
  • ReraGenie IDRG-MH-90383

Builder

  • NameINFINITE BUILD & COATS PVT LTD
  • Entity typeCompany
  • DirectorsSHRINANDAN PRABHAKAR BHALEROA, ANIL ANAND ARGADE, SONALI P JOSHI, ROHAN PANKAJ JOSHI

Key dates

7 months past promisethis monthRegisteredJul 2023PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on13 Jul 2023
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

6%1 of 18 units booked

Figures as on 31 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
URJIT PARKNA6618018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

URJIT PARK: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Open Space32

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area510 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Oct 2025

Approvals and building plan

Sanctioning authorityNASHIK METROPOLITAN REGION DEVELOPMENT AUTHORITY, NASHIK
Permissible FSI1621.33
Proposed, not sanctioned1,621 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRUSHIRAJ TOWER JEHAN CIRCLE NASHIK 422005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr AJIT SHRIKANT KULKARNI SHRIKANT KULKARNI
EngineerMitesh Vijaykumar Mutha
Chartered AccountantCA LALIT ASHOK PAWAR
PartnerRole in project
INFINITE BUILD & COATS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_30 06 2024.pdf31 Jul 2025
Form 2File: Form 2_30 06 2024 scanned.pdf31 Jul 2025
Form 3File: From-3 30 06 2022.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold_Booked Inventory 300624.pdf31 Jul 2025
Form 1File: Form 1_30 09 2024.pdf31 Jul 2025
Form 2File: Form 2_30 09 2024 scanned.pdf31 Jul 2025
Form 3File: Form-3 30 09 2024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold_Booked 300924.pdf31 Jul 2025
Form 1File: Form 1_31 12 2024.pdf31 Jul 2025
Form 2File: Form 2_31 12 2024 scanned.pdf31 Jul 2025
Form 3File: Form-3 31 12 2024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold_Booked 311224.pdf31 Jul 2025
Form 1File: Form 1_31 03 2025.pdf31 Jul 2025
Form 2File: Form 2_31 03 2025 scanned.pdf31 Jul 2025
Form 3File: From -3 31 03 2025.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold_Booked Inventory 310325.pdf31 Jul 2025
Form 1File: Form I_ Architect Certificate 30092023.pdf31 Jul 2025
Form 2File: RERA Form 2 Engineer's Certificate 30 09 2024.pdf31 Jul 2025
Form 3File: form-3 30-09-2023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Urjit Park-Sold Booked Inventory 30-09-23.pdf31 Jul 2025
Form 1File: Form I_ Architect Certificate 31122023.pdf31 Jul 2025
Form 2File: RERA Form 2 Engineer's Certificate 31 12 2024.pdf31 Jul 2025
Form 3File: form-3 31-12-2023.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Urjit Park-Sold Booked Inventory 31-12-23.pdf31 Jul 2025
Form 1File: Form I_ Architect Certificate 31032024.pdf31 Jul 2025
Form 2File: RERA Form 2 Engineer's Certificate 30 03 2025.pdf31 Jul 2025
Form 3File: form-3 31-03-2024.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Urjit Park-Sold Booked Inventory 31-03-24.pdf31 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I_ Architect Certificate 30092023.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I_ Architect Certificate 31122023.pdf10 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I_ Architect Certificate 31032024.pdf10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Engineer Certificate_30 09 2023.pdf10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Engineer Certificate_31 12 2023.pdf10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Engineer Certificate_30 03 2024.pdf10 Jun 2024
Disclosure of sold/ booked inventoryFile: Urjit Park-Sold Booked Inventory 30-09-23.pdf10 Jun 2024
Disclosure of sold/ booked inventoryFile: Urjit Park-Sold Booked Inventory 31-12-23.pdf10 Jun 2024
Disclosure of sold/ booked inventoryFile: Urjit Park-Sold Booked Inventory 31-03-24.pdf10 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3_CA Certificate 30-09-23.pdf10 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3_CA Certificate 31-12-23.pdf10 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3_CA Certificate 31-03-24.pdf10 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: INFINITE FORM-3.pdf4 Jul 2023
Proforma of Agreement for saleFile: RERA FINAL DARFT - infinite.pdf4 Jul 2023
Proforma of Allotment letterFile: A L FORMATE A.pdf26 Jun 2023
CERSAI detailsFile: INFINITE - CERSAI DECLARATION.pdf10 Jun 2023
Details of encumbrances concerned to FinanceFile: INFINITE - LEGALE.pdf9 Jun 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbarance-Legal.pdf9 Jun 2023
Details of encumbrances concerned to LegalFile: INFINITE - LEGALE.pdf9 Jun 2023
Details of encumbrances concerned to LegalFile: Non-Encumbarance-Legal.pdf9 Jun 2023
Declaration about Commencement CertificateFile: Commencemnt Certificate.pdf9 Jun 2023
Declaration in FORM BFile: FORM- B.pdf9 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory.pdf9 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: INFINITE FORMAT A.pdf9 Jun 2023
Deviation Report with respect to Allotment letterFile: INFINITE - LETTER.pdf9 Jun 2023
Deviation Report with respect to model copy of AgreementFile: INFINITE - SALE.pdf9 Jun 2023
Layout approvalFile: Approved layout dt 27032023 Plot 33 34.pdf8 Jun 2023
Building plan approvalFile: Approved Building Plan Urjit Park.pdf8 Jun 2023
PAN CardFile: PAN Card Infinite.pdf8 Jun 2023
Copy of the legal title reportFile: Title and Search Report.pdf8 Jun 2023
Copy of Layout Approval (in case of layout)File: Approved layout dt 27032023 Plot 33 34.pdf8 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Building Plan Urjit Park.pdf8 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Amalgamation Order Urjit Park.pdf8 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1.pdf8 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2_compressed.pdf8 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER PROJECT INTEREST.pdf8 Jun 2023
Proforma of Allotment letterFile: Allotment Letter Final.pdf8 Jun 2023

How this compares with Nashik

6%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep URJIT PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JALALPUR4,100+ in Nashik

2 kmURJIT PARKCompleted 3Lapsed / revoked 1Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: INFINITE BUILD & COATS PVT LTD

INFINITE BUILD & COATS PVT LTD has 1 registration on MahaRERA, including URJIT PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that URJIT PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if URJIT PARK is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of URJIT PARK?

The registered promoter entity is INFINITE BUILD & COATS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in URJIT PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for URJIT PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at URJIT PARK?

The professionals named in the filing: Architect: Ar AJIT SHRIKANT KULKARNI SHRIKANT KULKARNI; Engineer: Mitesh Vijaykumar Mutha; Chartered Accountant: CA LALIT ASHOK PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in URJIT PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About URJIT PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save URJIT PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.