URBAN GLORY WING A
RG-MH-07585 · RERA P50500013215 · Last updated on MahaRERA portal: 30 Jan 2024
Source: official MahaRERA filing
Red flags
- 10 complaints at MahaRERA
- 2 extensions taken
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
URBAN GLORY WING A is a Residential / Group Housing project by PARADISE INFRASTRUCTURE in Nagpur, Maharashtra, registered with MahaRERA as P50500013215 on 21 Sep 2017. The registration is recorded completed; possession was promised by 30 Sep 2021. 10 complaints are on record with the regulator.
At a glance
Project
- NameURBAN GLORY WING A
- TypeResidential / Group Housing
- Location
- PANJRI ROAD
- PARSODI
- Parsodi (535883)
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500013215
- ReraGenie IDRG-MH-07585
Builder
- NamePARADISE INFRASTRUCTURE
- Entity typePartnership
- PartnersRAHUL LALIT MOTE, HARSHAD LALIT MOTE
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Sep 2017
- Promised completion30 Sep 2021
- Revised completionNone
- Buildings1 building record
- Documents filed86 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| URBAN GLORY WING A | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
URBAN GLORY WING A: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 30 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 85% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 25% |
| Solid Waste Management And Disposal | Yes | 10% |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed112
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARAG KOTWAL |
| Engineer | PRASHANT GHUSE |
| Engineer | SHYAM SAHARE |
| Chartered Accountant | RAKESH THAKRE & CO |
| Partner | Role in project |
|---|---|
| PARADISE INFRASTRUCTURE | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSINCE LAST MARCH 2020 THERE IS A LOCK DOWN INPOSED IN MAHARASHTRA DUE TO WHICH NO CONSTRUCTION ACTIVITY WAS POSSIBLE AND AS SUCH THE PROJECT CONSTRUCTION WORK WAS COMPLETELY STOPPED .FURTHER WHEN SOME RELAXATION WAS THERE FOR SOME TIME , THERE WAS NON AVAILABILITY OF LABOUR AND MATERIAL, RESULTING IN STOPPAGE OF CONSTRUCTION ACTIVITY. AGAIN IN MARCH 2021 A LOCKDOWN WAS AGAIN IMPOSED AND IS STILL CONTINUING WITH RECENT CIRCULAR DATED.28/06/2021. ALL THE GOVERNMENT ORDERS , NOTIFICATIONS/CIRCULARS ARE UPLOADED FOR YOUR KIND REFERANCE.UNDRE THE CIRCUMSTANCES YOU ARE REQUESTED TO EXTEND THE PROJEC
Reason as filed by the promoterDue to financial crises the project got delayed and as we all know because of COVID-19 we all have faced many issues in our personal and financial ,even business also got affected, due to this many times labour is not there for work and required material not delivered to site on time.These are the major issue which me and my team has faced. So there is a request to authority kindly consider my application for extension so that i can complete my project as soon as possible to deliver it to the flat owner..
Complaints filed with MahaRERA10
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC004000000030440 | RAJESH BHIMRAO RAUT | PARADISE INFRASTRUCTURE | 16/01/2023 |
| CC004000000030454 | RAVIKANT BHARTI | M/S PARADISE INFRASTRUCTURE | 18/01/2023 |
| CC004000000030455 | AVINASH BABARAO KENE | M/S PARADISE INFRASTRUCTURES | 18/01/2023 |
| CC004000000030456 | Shivshankar Kashinath Yadav | M/S Paradise Infrastructure | 18/01/2023 |
| CC004000000030457 | Upendra Prasad Singh | M/S PARADISE INFRASTRUCTURE | 18/01/2023 |
| CC004000000030459 | VASANT MADHUKAR VAIDYA | M/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE | 19/01/2023 |
| CC004000000030461 | Hareshwar Madhavrao Dharmik | M/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE | 19/01/2023 |
| CC004000000030463 | RAVI KRUSHNARAO DEKATE | M/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE | 19/01/2023 |
| CC004000000030458 | DR NARMADA RAMDAS JATOTH | M/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE | 19/01/2023 |
| CC004000000030460 | GURMEET SINGH GURBACHAN SINGH RIN | M/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE | 19/01/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Apr 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Jan 2024
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form-4 urban glory.pdf | 30 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AnyScanner_10_17_2023.pdf | 27 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 25 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20240125_160204.pdf | 25 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 4 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf | 4 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold inventory urban_compressed.pdf | 4 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 12 May 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY URBAN GLORY_compressed.pdf | 10 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 26 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf | 4 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf | 4 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Emaar RERA FORM 2A 30 Sept 2022.pdf | 13 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Annexure 1 Quality Assurance Certificate 30 Sept 2022.pdf | 13 Dec 2022 |
| Certificates of CA (Form 3)File: Emaar RERA Form 3 30 Sept 2022.pdf | 13 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3 Certificate of financial progress of work Urban Glory Wing 30 Sept 2022.pdf | 13 Dec 2022 |
| Other - TechnicalFile: Emaar RERA Form 1 30 Sept 2022.pdf | 13 Dec 2022 |
| Other - TechnicalFile: Emaar RERA Form 2 30 Sept 2022.pdf | 13 Dec 2022 |
| Other - TechnicalFile: Discolsure Of Sold-Booked Inventory Building Wise 30 Sept 2022.pdf | 13 Dec 2022 |
| Other - TechnicalFile: Form 1 Architect Certificate 30 Sept 2022.pdf | 13 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate of percentage Completion Work Form 1 30JUNE2022.pdf | 13 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for Cost Incurred Form 2 30 JUNE 2022.pdf | 13 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate Quality Assurance Form 2A 30 JUNE 2022.pdf | 13 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Flat Position on 30 JUNE2022.pdf | 13 Aug 2022 |
| Certificates of CA (Form 3)File: CA Certificate 30 JUNE 2022.pdf | 13 Aug 2022 |
| Certificates of CA (Form 3)File: form 3 rerra 31-03-2021.pdf | 14 Sep 2021 |
| Certificates of CA (Form 3)File: form 3rera 30-06-2021.pdf | 14 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 PARADISE 21 22 (2).pdf | 18 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 PARADISE 21 22.pdf | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form No 2 PARADISE 21 22 (2).pdf | 18 Aug 2021 |
| Details of Restarting of Construction work post lockdownFile: Form No 2 PARADISE 21 22.pdf | 18 Aug 2021 |
| Declaration about Commencement CertificateFile: Form D PARADISE.pdf | 12 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Sold unsold 12-8-2021.pdf | 12 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate URBAN GLORY.pdf | 11 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From No 2 URBAN GLORY.pdf | 11 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From No 2 URBAN GLORY.pdf | 11 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Sold unsold URBAN GLORY.pdf | 11 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: From 5 Paradise 18-19.pdf | 11 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5 Paradise 19-20.pdf | 11 Aug 2021 |
| Building plan approvalFile: Revised Building Plan Urban Glory-1.pdf | 5 Apr 2019 |
| Building plan approvalFile: Revised Building Plan Urban Glory-2.pdf | 5 Apr 2019 |
| Building plan approvalFile: Revised Buiding Plan Urban Glory-3.pdf | 5 Apr 2019 |
| Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-1.pdf | 5 Apr 2019 |
| Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-2.pdf | 5 Apr 2019 |
| Building Plan Approval (IOD)File: Revised Buiding Plan Urban Glory-3.pdf | 5 Apr 2019 |
| OtherFile: Additional Loan from HFFC of Rs 325 lacs Sanctioned Letter.pdf | 5 Apr 2019 |
| Building plan approvalFile: Revised Building Plan Urban Glory-1.pdf | 11 Mar 2019 |
| Building plan approvalFile: Revised Building Plan Urban Glory-2.pdf | 11 Mar 2019 |
| Building plan approvalFile: Revised Buiding Plan Urban Glory-3.pdf | 11 Mar 2019 |
| Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-1.pdf | 11 Mar 2019 |
| Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-2.pdf | 11 Mar 2019 |
| Building Plan Approval (IOD)File: Revised Buiding Plan Urban Glory-3.pdf | 11 Mar 2019 |
| OtherFile: Additional Loan from HFFC of Rs 325 lacs Sanctioned Letter.pdf | 11 Mar 2019 |
| OtherFile: Revised Building Permit dt 4 Sept 2018.pdf | 11 Mar 2019 |
| Certificates of CA (Form 5)File: Paradise 17-18 RERA Report.pdf | 30 Sep 2018 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf | 7 Mar 2018 |
| OtherFile: Construction Finance Facility.pdf | 7 Mar 2018 |
| Layout approvalFile: Lay Out Plan.pdf | 18 Sep 2017 |
| Building plan approvalFile: Sanctioned Building Plan-1.pdf | 18 Sep 2017 |
| Building plan approvalFile: Sanctioned Building Plan-2.pdf | 18 Sep 2017 |
| Building plan approvalFile: Sanctioned Building Plan-3.pdf | 18 Sep 2017 |
| Building plan approvalFile: Sanctioned Building Plan-4.pdf | 18 Sep 2017 |
| Building plan approvalFile: Sanctioned Building Plan-5.pdf | 18 Sep 2017 |
| Building plan approvalFile: Sanctioned Building Plan-6.pdf | 18 Sep 2017 |
| PAN CardFile: pan card.pdf | 18 Sep 2017 |
| Copy of the legal title reportFile: Title Verification Report.pdf | 18 Sep 2017 |
| Details of encumbrancesFile: NON ENCUMBRANCE CERTIFICATE.pdf | 18 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: Lay Out Plan.pdf | 18 Sep 2017 |
| Building Plan Approval (IOD)File: Sanctioned Building Plan-1.pdf | 18 Sep 2017 |
| Building Plan Approval (IOD)File: Sanctioned Building Plan-2.pdf | 18 Sep 2017 |
| Building Plan Approval (IOD)File: Sanctioned Building Plan-3.pdf | 18 Sep 2017 |
| Building Plan Approval (IOD)File: Sanctioned Building Plan-4.pdf | 18 Sep 2017 |
| Building Plan Approval (IOD)File: Sanctioned Building Plan-5.pdf | 18 Sep 2017 |
| Building Plan Approval (IOD)File: Sanctioned Building Plan-6.pdf | 18 Sep 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commence Certificate.pdf | 18 Sep 2017 |
| Declaration in FORM BFile: FORM B.pdf | 18 Sep 2017 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 18 Sep 2017 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 18 Sep 2017 |
| Proforma of Allotment letterFile: DRAFT AGREEMENTURBAN GLORY WING A.pdf | 18 Sep 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| HARMONY II | PLOT NO 28 ENGG CO OP HOUSING LTD SOMALWADA NAGPUR | 9 | Completed | Dec 2014 | Aug 2014 |
| HARMONY-I | PLOT NO 27 ENGG. COOP. HSG SOCIETY LTD SOMALWADA NAGPUR | 10 | Completed | Dec 2013 | Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
Keep URBAN GLORY WING A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PARSODI2,800+ in Nagpur
Filed coordinates, straight-line distance. 31 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: PARADISE INFRASTRUCTURE
PARADISE INFRASTRUCTURE has 1 registration on MahaRERA, including URBAN GLORY WING A. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if URBAN GLORY WING A is delayed beyond 30 Sep 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of URBAN GLORY WING A?
The registered promoter entity is PARADISE INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in URBAN GLORY WING A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against URBAN GLORY WING A?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for URBAN GLORY WING A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at URBAN GLORY WING A?
The professionals named in the filing: Architect: PARAG KOTWAL; Engineer: PRASHANT GHUSE; Engineer: SHYAM SAHARE; Chartered Accountant: RAKESH THAKRE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in URBAN GLORY WING A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback