Home / Browse projects / Nagpur, Maharashtra / URBAN GLORY WING A

Completed No litigation declared Residential / Group Housing project

URBAN GLORY WING A

By PARADISE INFRASTRUCTURE

RG-MH-07585 · RERA P50500013215 · Last updated on MahaRERA portal: 30 Jan 2024

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA
  • 2 extensions taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2021Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
10Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

URBAN GLORY WING A is a Residential / Group Housing project by PARADISE INFRASTRUCTURE in Nagpur, Maharashtra, registered with MahaRERA as P50500013215 on 21 Sep 2017. The registration is recorded completed; possession was promised by 30 Sep 2021. 10 complaints are on record with the regulator.

At a glance

Project

  • NameURBAN GLORY WING A
  • TypeResidential / Group Housing
  • Location
    • PANJRI ROAD
    • PARSODI
    • Parsodi (535883)
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500013215
  • ReraGenie IDRG-MH-07585

Builder

  • NamePARADISE INFRASTRUCTURE
  • Entity typePartnership
  • PartnersRAHUL LALIT MOTE, HARSHAD LALIT MOTE
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2017PromisedSep 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Sep 2017
  • Promised completion30 Sep 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
URBAN GLORY WING ANA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

URBAN GLORY WING A: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 30 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes25%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered107
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4383.0
Proposed, not sanctioned4,383 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAMDASPETH NAGPUR-440010

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARAG KOTWAL
EngineerPRASHANT GHUSE
EngineerSHYAM SAHARE
Chartered AccountantRAKESH THAKRE & CO
PartnerRole in project
PARADISE INFRASTRUCTURE-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500010262Sep 2021 → Sep 2022

Reason as filed by the promoterSINCE LAST MARCH 2020 THERE IS A LOCK DOWN INPOSED IN MAHARASHTRA DUE TO WHICH NO CONSTRUCTION ACTIVITY WAS POSSIBLE AND AS SUCH THE PROJECT CONSTRUCTION WORK WAS COMPLETELY STOPPED .FURTHER WHEN SOME RELAXATION WAS THERE FOR SOME TIME , THERE WAS NON AVAILABILITY OF LABOUR AND MATERIAL, RESULTING IN STOPPAGE OF CONSTRUCTION ACTIVITY. AGAIN IN MARCH 2021 A LOCKDOWN WAS AGAIN IMPOSED AND IS STILL CONTINUING WITH RECENT CIRCULAR DATED.28/06/2021. ALL THE GOVERNMENT ORDERS , NOTIFICATIONS/CIRCULARS ARE UPLOADED FOR YOUR KIND REFERANCE.UNDRE THE CIRCUMSTANCES YOU ARE REQUESTED TO EXTEND THE PROJEC

EXT50500016500Sep 2021 → Mar 2024

Reason as filed by the promoterDue to financial crises the project got delayed and as we all know because of COVID-19 we all have faced many issues in our personal and financial ,even business also got affected, due to this many times labour is not there for work and required material not delivered to site on time.These are the major issue which me and my team has faced. So there is a request to authority kindly consider my application for extension so that i can complete my project as soon as possible to deliver it to the flat owner..

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC004000000030440RAJESH BHIMRAO RAUTPARADISE INFRASTRUCTURE16/01/2023
CC004000000030454RAVIKANT BHARTIM/S PARADISE INFRASTRUCTURE18/01/2023
CC004000000030455AVINASH BABARAO KENEM/S PARADISE INFRASTRUCTURES18/01/2023
CC004000000030456Shivshankar Kashinath YadavM/S Paradise Infrastructure18/01/2023
CC004000000030457Upendra Prasad SinghM/S PARADISE INFRASTRUCTURE18/01/2023
CC004000000030459VASANT MADHUKAR VAIDYAM/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE19/01/2023
CC004000000030461Hareshwar Madhavrao DharmikM/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE19/01/2023
CC004000000030463RAVI KRUSHNARAO DEKATEM/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE19/01/2023
CC004000000030458DR NARMADA RAMDAS JATOTHM/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE19/01/2023
CC004000000030460GURMEET SINGH GURBACHAN SINGH RINM/s PARADISE INFRASTRUCTURES ,PARTNER RAHUL LALIT MOTE19/01/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jan 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form-4 urban glory.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AnyScanner_10_17_2023.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf25 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20240125_160204.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf4 Oct 2023
Disclosure of sold/ booked inventoryFile: sold inventory urban_compressed.pdf4 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY URBAN GLORY_compressed.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf26 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf4 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Emaar RERA FORM 2A 30 Sept 2022.pdf13 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Annexure 1 Quality Assurance Certificate 30 Sept 2022.pdf13 Dec 2022
Certificates of CA (Form 3)File: Emaar RERA Form 3 30 Sept 2022.pdf13 Dec 2022
Certificates of CA (Form 3)File: Form 3 Certificate of financial progress of work Urban Glory Wing 30 Sept 2022.pdf13 Dec 2022
Other - TechnicalFile: Emaar RERA Form 1 30 Sept 2022.pdf13 Dec 2022
Other - TechnicalFile: Emaar RERA Form 2 30 Sept 2022.pdf13 Dec 2022
Other - TechnicalFile: Discolsure Of Sold-Booked Inventory Building Wise 30 Sept 2022.pdf13 Dec 2022
Other - TechnicalFile: Form 1 Architect Certificate 30 Sept 2022.pdf13 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate of percentage Completion Work Form 1 30JUNE2022.pdf13 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for Cost Incurred Form 2 30 JUNE 2022.pdf13 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate Quality Assurance Form 2A 30 JUNE 2022.pdf13 Aug 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Flat Position on 30 JUNE2022.pdf13 Aug 2022
Certificates of CA (Form 3)File: CA Certificate 30 JUNE 2022.pdf13 Aug 2022
Certificates of CA (Form 3)File: form 3 rerra 31-03-2021.pdf14 Sep 2021
Certificates of CA (Form 3)File: form 3rera 30-06-2021.pdf14 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 PARADISE 21 22 (2).pdf18 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 PARADISE 21 22.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form No 2 PARADISE 21 22 (2).pdf18 Aug 2021
Details of Restarting of Construction work post lockdownFile: Form No 2 PARADISE 21 22.pdf18 Aug 2021
Declaration about Commencement CertificateFile: Form D PARADISE.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold unsold 12-8-2021.pdf12 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate URBAN GLORY.pdf11 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From No 2 URBAN GLORY.pdf11 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From No 2 URBAN GLORY.pdf11 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold unsold URBAN GLORY.pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: From 5 Paradise 18-19.pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: From 5 Paradise 19-20.pdf11 Aug 2021
Building plan approvalFile: Revised Building Plan Urban Glory-1.pdf5 Apr 2019
Building plan approvalFile: Revised Building Plan Urban Glory-2.pdf5 Apr 2019
Building plan approvalFile: Revised Buiding Plan Urban Glory-3.pdf5 Apr 2019
Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-1.pdf5 Apr 2019
Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-2.pdf5 Apr 2019
Building Plan Approval (IOD)File: Revised Buiding Plan Urban Glory-3.pdf5 Apr 2019
OtherFile: Additional Loan from HFFC of Rs 325 lacs Sanctioned Letter.pdf5 Apr 2019
Building plan approvalFile: Revised Building Plan Urban Glory-1.pdf11 Mar 2019
Building plan approvalFile: Revised Building Plan Urban Glory-2.pdf11 Mar 2019
Building plan approvalFile: Revised Buiding Plan Urban Glory-3.pdf11 Mar 2019
Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-1.pdf11 Mar 2019
Building Plan Approval (IOD)File: Revised Building Plan Urban Glory-2.pdf11 Mar 2019
Building Plan Approval (IOD)File: Revised Buiding Plan Urban Glory-3.pdf11 Mar 2019
OtherFile: Additional Loan from HFFC of Rs 325 lacs Sanctioned Letter.pdf11 Mar 2019
OtherFile: Revised Building Permit dt 4 Sept 2018.pdf11 Mar 2019
Certificates of CA (Form 5)File: Paradise 17-18 RERA Report.pdf30 Sep 2018
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf7 Mar 2018
OtherFile: Construction Finance Facility.pdf7 Mar 2018
Layout approvalFile: Lay Out Plan.pdf18 Sep 2017
Building plan approvalFile: Sanctioned Building Plan-1.pdf18 Sep 2017
Building plan approvalFile: Sanctioned Building Plan-2.pdf18 Sep 2017
Building plan approvalFile: Sanctioned Building Plan-3.pdf18 Sep 2017
Building plan approvalFile: Sanctioned Building Plan-4.pdf18 Sep 2017
Building plan approvalFile: Sanctioned Building Plan-5.pdf18 Sep 2017
Building plan approvalFile: Sanctioned Building Plan-6.pdf18 Sep 2017
PAN CardFile: pan card.pdf18 Sep 2017
Copy of the legal title reportFile: Title Verification Report.pdf18 Sep 2017
Details of encumbrancesFile: NON ENCUMBRANCE CERTIFICATE.pdf18 Sep 2017
Copy of Layout Approval (in case of layout)File: Lay Out Plan.pdf18 Sep 2017
Building Plan Approval (IOD)File: Sanctioned Building Plan-1.pdf18 Sep 2017
Building Plan Approval (IOD)File: Sanctioned Building Plan-2.pdf18 Sep 2017
Building Plan Approval (IOD)File: Sanctioned Building Plan-3.pdf18 Sep 2017
Building Plan Approval (IOD)File: Sanctioned Building Plan-4.pdf18 Sep 2017
Building Plan Approval (IOD)File: Sanctioned Building Plan-5.pdf18 Sep 2017
Building Plan Approval (IOD)File: Sanctioned Building Plan-6.pdf18 Sep 2017
Commencement Certificates / NA Order for plotted developmentFile: Commence Certificate.pdf18 Sep 2017
Declaration in FORM BFile: FORM B.pdf18 Sep 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf18 Sep 2017
Proforma of Allotment letterFile: Allotment Letter.pdf18 Sep 2017
Proforma of Allotment letterFile: DRAFT AGREEMENTURBAN GLORY WING A.pdf18 Sep 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
HARMONY IIPLOT NO 28 ENGG CO OP HOUSING LTD SOMALWADA NAGPUR9CompletedDec 2014Aug 2014
HARMONY-IPLOT NO 27 ENGG. COOP. HSG SOCIETY LTD SOMALWADA NAGPUR10CompletedDec 2013Dec 2013

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep URBAN GLORY WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PARSODI2,800+ in Nagpur

2 kmURBAN GLORY WING ACompleted 20Lapsed / revoked 2Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: PARADISE INFRASTRUCTURE

PARADISE INFRASTRUCTURE has 1 registration on MahaRERA, including URBAN GLORY WING A. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if URBAN GLORY WING A is delayed beyond 30 Sep 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of URBAN GLORY WING A?

The registered promoter entity is PARADISE INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in URBAN GLORY WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against URBAN GLORY WING A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for URBAN GLORY WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at URBAN GLORY WING A?

The professionals named in the filing: Architect: PARAG KOTWAL; Engineer: PRASHANT GHUSE; Engineer: SHYAM SAHARE; Chartered Accountant: RAKESH THAKRE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in URBAN GLORY WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About URBAN GLORY WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save URBAN GLORY WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.