ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / UNIVERSAL TRADE CENTER

Registered No litigation declared Others project

UNIVERSAL TRADE CENTER

By UNIVERSAL DEVELOPERS

RG-MH-31463 · RERA P53100079798 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 45%
38 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

UNIVERSAL TRADE CENTER is a Others project by UNIVERSAL DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100079798 on 26 Mar 2025. Possession is promised by 31 Dec 2028. 3 of the 41 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameUNIVERSAL TRADE CENTER
  • TypeOthers
  • Location
    • 100 FT ROAD
    • NEAR IDBI BANK
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100079798
  • ReraGenie IDRG-MH-31463

Builder

  • NameUNIVERSAL DEVELOPERS
  • Entity typePartnership
  • PartnersRAVINDRA SHANKAR KHILARE, ANANDKUMAR BABAN RAJMANE
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

7%3 of 41 units booked
34.7%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIVERSAL TRADE CENTERNA88142741

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 45%.

UNIVERSAL TRADE CENTER: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area671 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
Declared on22 May 2025
LandownerVillageDistrict
AMIT ARVIND PATILSangli Miraj Kupwad (M Corp.)Sangli
ARUN SHRIRANG BHANDARESangli Miraj Kupwad (M Corp.)Sangli
APPASAHEB BABU CHOUGULESangli Miraj Kupwad (M Corp.)Sangli
SWAPNIL BALASAHEB BHOSALESangli Miraj Kupwad (M Corp.)Sangli
MADHURI APPASAHEB CHOUGULESangli Miraj Kupwad (M Corp.)Sangli
BHUPAL GANGARAM AWATISangli Miraj Kupwad (M Corp.)Sangli
VISHAL VASUDEV KAMATSangli Miraj Kupwad (M Corp.)Sangli
BALASAO KALGAONDA PATILSangli Miraj Kupwad (M Corp.)Sangli
RAHUL PRABHAKAR KHIRESangli Miraj Kupwad (M Corp.)Sangli
GIRISH SHIVAJI INGALGISangli Miraj Kupwad (M Corp.)Sangli
MALHARIRAO PUNDLIKRAO MALHATKARSangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authoritySANGLI MIRAJ AND KUPWAD MUNICIPAL CORPORATION
Permissible FSI2400.03
Proposed, not sanctioned2,400 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS T COLONY,SANGLI, KESAR BHAVAN,100 FT ROAD, NR. GANESH MANDIR, VISHRAMBAG, SANGLI-416415
Estimated costRs 5.60 cr
Cost incurredRs 1.94 cr
Work done34.73%
BuildingWingEstimatedIncurred
UNIVERSAL TRADE CENTERNARs 5.60 crRs 1.94 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMBAR M SHINDE
EngineerUTTAM ARAGE
Chartered AccountantLAXMAN K GAIKWAD
PartnerRole in project
UNIVERSAL DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31-3-26.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 31-3-26.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 31-3-26_compressed.pdf21 Apr 2026
Withdrawal Update Form 1File: form 1 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 2File: FORM-2 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 3File: FORM-3 31-12-25.pdf13 Jan 2026
Withdrawal Update Form 1File: form 1 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 1File: form 1 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 1File: FORM-1 30-6-25.pdf14 Oct 2025
Withdrawal Update Form 1File: form 1 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 2File: form 2 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 2File: form 2 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 2File: FORM-2 30-06-25.pdf14 Oct 2025
Withdrawal Update Form 2File: form 2 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 3File: form 3 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 3File: form 3 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 3File: FORM 3 30-6-25.pdf14 Oct 2025
Withdrawal Update Form 3File: form 3 30-9-25.pdf14 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf10 Jul 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf10 Jul 2025
Withdrawal Update Form 3File: form 3.pdf10 Jul 2025
Form 1File: from 1.pdf5 Jun 2025
Form 2File: from 2.pdf5 Jun 2025
Form 3File: FORM-3 31-03-25.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: progress.pdf5 Jun 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf5 Jun 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf5 Jun 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf5 Jun 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf5 Jun 2025
Withdrawal Update Form 3File: form 3.pdf5 Jun 2025
Withdrawal Update Form 3File: form 3.pdf5 Jun 2025
Other - LegalFile: power of attorny.pdf21 Mar 2025
Other - LegalFile: redevelopment agreement (1).pdf21 Mar 2025
Other - LegalFile: chuk durusti.pdf21 Mar 2025
Other - LegalFile: Ingangi Haqqsodpatra.pdf12 Mar 2025
Other - LegalFile: self dec for land owner saledeed.pdf31 Dec 2024
Layout approvalFile: new drg_compressed.pdf27 Dec 2024
Copy of Layout Approval (in case of layout)File: new drg_compressed.pdf27 Dec 2024
Other - FinanceFile: DocScanner Dec 27, 2024 1-49 PM.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf16 Nov 2024
Other - TechnicalFile: annexture a.pdf15 Nov 2024
Layout approvalFile: cc new 1-1_compressed.pdf28 Oct 2024
Building plan approvalFile: mun dwg.pdf28 Oct 2024
PAN CardFile: DocScanner Oct 28, 2024 7-33 PM.pdf28 Oct 2024
Copy of the legal title reportFile: FORMAT A_compressed.pdf28 Oct 2024
Details of encumbrances concerned to FinanceFile: NO ENC FIN.pdf28 Oct 2024
Details of encumbrances concerned to FinanceFile: NO ENC LEGAL.pdf28 Oct 2024
Copy of Layout Approval (in case of layout)File: cc new 1-1_compressed.pdf28 Oct 2024
Proforma of Allotment letterFile: Allotment Letter(Latest)_compressed.pdf28 Oct 2024
Declaration in FORM BFile: FORM B.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - UNIVERSAL TRADE CENTER.pdf28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: cc new 1-1_compressed.pdf28 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: mun dwg.pdf28 Oct 2024
Declaration about Commencement CertificateFile: DEC ABOUT COM.pdf28 Oct 2024
CERSAI detailsFile: CERSAI.pdf28 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: from a bank.pdf28 Oct 2024
Deviation Report with respect to Allotment letterFile: NO DEV ALT.pdf28 Oct 2024
Details of encumbrances concerned to LegalFile: NO ENC FIN.pdf28 Oct 2024
Details of encumbrances concerned to LegalFile: NO ENC LEGAL.pdf28 Oct 2024
Deviation Report with respect to model copy of AgreementFile: NO DEV AGRI.pdf28 Oct 2024
Proforma of Agreement for saleFile: Model Agreement For Sale.pdf28 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIS OTHER REAL EXTATE.pdf28 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B bank new.pdf28 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: unscured fin.pdf28 Oct 2024

How this compares with Sangli

7%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep UNIVERSAL TRADE CENTER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR IDBI BANK790+ in Sangli

Builder: UNIVERSAL DEVELOPERS

UNIVERSAL DEVELOPERS has 2 registrations on MahaRERA, including GOLDFIELDS and UNIVERSAL TRADE CENTER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if UNIVERSAL TRADE CENTER is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIVERSAL TRADE CENTER?

The registered promoter entity is UNIVERSAL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIVERSAL TRADE CENTER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNIVERSAL TRADE CENTER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIVERSAL TRADE CENTER?

The professionals named in the filing: Architect: AMBAR M SHINDE; Engineer: UTTAM ARAGE; Chartered Accountant: LAXMAN K GAIKWAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIVERSAL TRADE CENTER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIVERSAL TRADE CENTER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIVERSAL TRADE CENTER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.