ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Universal 11 up Apartments

Completed No litigation declared Residential / Group Housing project

Universal 11 up Apartments

By UNIVERSAL HOUSE PVT. LTD.

RG-MH-57081 · RERA P50500022622 · Last updated on MahaRERA portal: 24 Jan 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Slabs of Super Structure, 12%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Universal 11 up Apartments is a Residential / Group Housing project by UNIVERSAL HOUSE PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500022622 on 9 Oct 2019. The registration is recorded completed; possession was promised by 30 Sep 2023.

At a glance

Project

  • NameUniversal 11 up Apartments
  • TypeResidential / Group Housing
  • Location
    • Ambazari Road
    • Shivaji Nagar
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500022622
  • ReraGenie IDRG-MH-57081

Builder

  • NameUNIVERSAL HOUSE PVT. LTD.
  • Entity typeCompany
  • DirectorSANJAY SUDHAKAR KULKARNI
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2019PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Oct 2019
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
11 up ApartmentsNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 12%.

11 up Apartments: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 24 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Installation of LiftYes100%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered25
Open Space20

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,021 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Universal House Pvt LtdNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI3194.0
Proposed, not sanctioned3,194 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSomalwada,Wardha Road, Nagpur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Satpute
EngineerAspect Design
Chartered AccountantRodi Dabir & Co
PartnerRole in project
UNIVERSAL HOUSE PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Sep 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 May 2023

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 46WA 2022-23.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Booking 11UP March 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 11UP March-2023.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-05 11UP FY2022-23.pdf19 Jan 2024
OtherFile: QPR 11UP March 2023.pdf19 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate 11UP APARTMENT.pdf25 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form-04 11UP APARTMENT.pdf25 May 2023
Details of encumbrancesFile: Encumbrance to Finance 11UP.pdf11 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance to Legal 11UP.pdf11 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrance to Legal 11UP.pdf11 Apr 2023
Disclosure of sold/ booked inventoryFile: Booking Sept2022 11UP.pdf11 Apr 2023
Disclosure of sold/ booked inventoryFile: Booking Dec2022 11UP.pdf11 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sanjay Kulkarni Annexure A.pdf11 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ashish Kalode Annexure A.pdf11 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A 11UP.pdf11 Apr 2023
OtherFile: QPR Sept2022 11UP.pdf11 Apr 2023
OtherFile: Booking Sept2022 11UP.pdf11 Apr 2023
OtherFile: QPR Dec2022 11UP.pdf11 Apr 2023
OtherFile: Booking Dec2022 11UP.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2À FY 2020-21 11UP.pdf8 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A FY 2021-22.pdf8 Apr 2023
OtherFile: Booking Status 11UP June-2022.pdf8 Apr 2023
OtherFile: QPR 11UP June-2022.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-01 Sept-2022 11UP.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-01 Dec-2022 11UP.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-02 Sept-2022 11UP_compressed.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-02 Dec-2022 11UP_compressed.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11UP Form-03 Sept-2022_compressed.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11UP Form-03 Dec-2022_compressed.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5-11UP-FY2021-22.pdf7 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 11UP June-2022.pdf15 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 11UP June-2022_compressed.pdf15 Sep 2022
Disclosure of sold/ booked inventoryFile: Booking Status 11UP June-2022.pdf15 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 11UP June-2022_compressed.pdf15 Sep 2022
OtherFile: QPR 11UP June-2022.pdf15 Sep 2022
Disclosure of sold/ booked inventoryFile: I QTR-30 June 2021.pdf1 Jul 2022
Disclosure of sold/ booked inventoryFile: II Qtr-30 Sept 2021.pdf1 Jul 2022
Disclosure of sold/ booked inventoryFile: IV QTR-31 Mar 2022.pdf1 Jul 2022
Disclosure of sold/ booked inventoryFile: III QTR-31 Dec 2021.pdf1 Jul 2022
OtherFile: I QRT-30 June 2021.pdf1 Jul 2022
OtherFile: II QRT-30 Sept 2021.pdf1 Jul 2022
OtherFile: III QRT-31 Dec 2021.pdf1 Jul 2022
OtherFile: IV QRT-31 Mar 2022.pdf1 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A.pdf10 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Cert 31 Mar22.pdf12 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engg Cert 31 Mar22.pdf12 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Cert 31 Mar22-compressed.pdf12 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf14 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf14 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate.pdf12 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate.pdf12 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate_compressed.pdf12 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_11 UP.pdf19 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec'21.pdf29 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -March'21.pdf1 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -June'21.pdf1 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Sept'21.pdf1 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A FY 2019-20.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A FY 2021-22.pdf15 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert- Jan'21.pdf11 Nov 2021
Declaration about Commencement CertificateFile: Format-D.pdf27 Oct 2021
Disclosure of sold/ booked inventoryFile: Disc of sold-booked.pdf27 Oct 2021
Declaration about Commencement CertificateFile: Commencement Cert 1.pdf1 Oct 2021
Declaration about Commencement CertificateFile: Commencement Cert 2.pdf1 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf10 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert10 Slab.pdf15 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert-I slab.pdf10 Jun 2020
Layout approvalFile: Slf Dclr- LO.pdf1 Oct 2019
Details of encumbrancesFile: Slf Dclr-encumbr.pdf1 Oct 2019
Copy of Layout Approval (in case of layout)File: Slf Dclr- LO.pdf1 Oct 2019
Proforma of Allotment letterFile: AGREEMENT-UNIVERSAL-11 UP APTS.pdf1 Oct 2019
Building plan approvalFile: SANCTIONED PLAN-1.pdf30 Sep 2019
Building plan approvalFile: SANCTIONED PLAN-2.pdf30 Sep 2019
PAN CardFile: UHPL-PAN.pdf30 Sep 2019
Copy of the legal title reportFile: TITLE REPORT.pdf30 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN-1.pdf30 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED PLAN-2.pdf30 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert 1.pdf30 Sep 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
46 West AvenuePlot No 46 Shivaji Nagar Nagpur 44001016CompletedDec 2023Dec 2023
11 up Apartments157 Shivaji Nagar Nagpur22CompletedSep 2023Sep 2023
CROSS WINDPLOT NO 380 CORP HOUSE NO 597 SHEET NO 58 NORTH AMBAZARI ROAD GANDHI NAGAR NAGPUR12CompletedDec 2021Dec 2021
UNIVERSAL MOTIFHOUSE NO 112 KHARE TOWN DHARAMPETH NAGPUR 44001024CompletedJun 2016Jun 2016

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Universal 11 up Apartments on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Nagar2,800+ in Nagpur

2 kmUniversal 11 up ApartmenCompleted 26Lapsed / revoked 15Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 80 registered projects within 2 km.

Builder: UNIVERSAL HOUSE PVT. LTD.

UNIVERSAL HOUSE PVT. LTD. has 4 registrations on MahaRERA, including CROSS WIND and Universal 11 up Apartments. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Universal 11 up Apartments is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Universal 11 up Apartments?

The registered promoter entity is UNIVERSAL HOUSE PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Universal 11 up Apartments?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Universal 11 up Apartments?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Universal 11 up Apartments?

The professionals named in the filing: Architect: Prashant Satpute; Engineer: Aspect Design; Chartered Accountant: Rodi Dabir & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Universal 11 up Apartments?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Universal 11 up Apartments. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Universal 11 up Apartments to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.