UNIQUE VISHWA-II
By GANPATI BUILDERS AND DEVELOPERS
RG-MH-91281 · RERA P50500047770 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
UNIQUE VISHWA-II is a Plotted project by GANPATI BUILDERS AND DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500047770 on 28 Nov 2022. Possession is promised by 26 Oct 2027. 0 of the 336 units on this registration are recorded sold or booked.
At a glance
Project
- NameUNIQUE VISHWA-II
- TypePlotted
- Location
- PH NO 74
- MOUZA WARANGA
- TEHSIL & DISTRICT NAGPUR
- Waranga
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500047770
- ReraGenie IDRG-MH-91281
Builder
- NameGANPATI BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersATUL MANOHARRAO YAMSHANWAR, NEELESH GAJANAN CHANDAWAR, VYANKATESH TRYAMBAKRAO KUNAWAR, CHANDRAKANT BHAURAO PADMAWAR
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Nov 2022
- Promised completion26 Oct 2027
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed96 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 7.96 cr | Rs 8.01 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH LAMGE |
| Engineer | MAHENDRA S BHANDARI |
| Engineer | NASEEM AHMED SIDDIQUI |
| Chartered Accountant | RANJEET MISHRA |
| Partner | Role in project |
|---|---|
| GANPATI BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 26 Oct 2027
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Sept 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Sept 25 Qtr.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Sept 25 Qtr.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: June 25 Form 1.pdf | 6 Jan 2026 |
| Withdrawal Update Form 1File: June 25 Form 1.pdf | 6 Jan 2026 |
| Withdrawal Update Form 2File: June 25 Form 2.pdf | 6 Jan 2026 |
| Withdrawal Update Form 2File: June 25 Form 2.pdf | 6 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 March 2025.pdf | 6 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 March 2025.pdf | 6 Jan 2026 |
| Form 1File: March 25 Form 1.pdf | 7 Oct 2025 |
| Form 2File: March 25 Form 2.pdf | 7 Oct 2025 |
| Form 3File: Form 3 March 2025.pdf | 7 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: March 25 Sold Unsold.pdf | 7 Oct 2025 |
| Withdrawal Update Form 1File: March 25 Form 1.pdf | 7 Oct 2025 |
| Withdrawal Update Form 1File: March 25 Form 1.pdf | 7 Oct 2025 |
| Withdrawal Update Form 1File: March 25 Form 1.pdf | 7 Oct 2025 |
| Withdrawal Update Form 1File: March 25 Form 1.pdf | 7 Oct 2025 |
| Withdrawal Update Form 1File: March 25 Form 1.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: March 25 Form 2.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: March 25 Form 2.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: March 25 Form 2.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: March 25 Form 2.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: March 25 Form 2.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 March 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 March 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 March 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 March 2025.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 March 2025.pdf | 7 Oct 2025 |
| Layout approvalFile: NMRDA Final Sanction MAP.pdf | 29 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: NMRDA Final Sanction MAP.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Dec 2022.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 March 2023.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 June 2023.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Sept 2023.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Dec 2023.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 March 2024.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 June 2024.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 Sept 2024.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09 Dec 2024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 June 2023.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 09 Dec 2024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 08 Sept 2024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 07 June 2024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 March 2024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 Dec 2023.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 Sept 2023.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 March 2023.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 Dec 2022.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 June 2023.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 09 Dec 2024.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08 Sept 2024.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 June 2024.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 March 2024.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 Sept 2023.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 March 2023.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Dec 2022.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 Dec 2023.pdf | 29 Jan 2025 |
| Other - LegalFile: NMRDS Development Agreement.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 05 Dec 2023.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 09 Dec 2024.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 08 Sept 2024.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 07 June 2024.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 06 March 2024.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 04 Sept 2023.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 03 June 2023.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 02 March 2023.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 01 Dec 2022.pdf | 29 Jan 2025 |
| Declaration about Commencement CertificateFile: Format D.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 01 March 2023.pdf | 29 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 01 March 2023.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 02 March 2024.pdf | 29 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 02 March 2024.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf | 16 Nov 2022 |
| CERSAI detailsFile: Undertaking.pdf | 5 Nov 2022 |
| Building plan approval or NA orderFile: NA Order.pdf | 27 Oct 2022 |
| Layout approvalFile: MAP.pdf | 27 Oct 2022 |
| PAN CardFile: FIRM PAN CARD.pdf | 27 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep UNIQUE VISHWA-II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUZA WARANGA, TEHSIL & DISTRICT NAGPUR2,800+ in Nagpur
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: GANPATI BUILDERS AND DEVELOPERS
GANPATI BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including UNIQUEVISHWA WARANGA and UNIQUE VISHWA-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if UNIQUE VISHWA-II is delayed beyond 26 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of UNIQUE VISHWA-II?
The registered promoter entity is GANPATI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in UNIQUE VISHWA-II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for UNIQUE VISHWA-II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at UNIQUE VISHWA-II?
The professionals named in the filing: Architect: UMESH LAMGE; Engineer: MAHENDRA S BHANDARI; Engineer: NASEEM AHMED SIDDIQUI; Chartered Accountant: RANJEET MISHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in UNIQUE VISHWA-II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback