ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / UNIQUE APARTMENT

Registered No litigation declared Others project

UNIQUE APARTMENT

By VARDHAMAN HOUSING

RG-MH-07108 · RERA P99000055914 · Last updated on MahaRERA portal: 24 Aug 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of Truhome Finance
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 70%
116 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

UNIQUE APARTMENT is a Others project by VARDHAMAN HOUSING in Palghar, Maharashtra, registered with MahaRERA as P99000055914 on 29 Apr 2024. Possession is promised by 31 Aug 2027. 50 of the 166 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameUNIQUE APARTMENT
  • TypeOthers
  • Location
    • P P MARG
    • VIRAR
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000055914
  • ReraGenie IDRG-MH-07108

Builder

  • NameVARDHAMAN HOUSING
  • Entity typePartnership
  • GSTIN27AAWFV3483G1ZG
  • PartnersHITESH LALCHAND JAIN, KANHAIYALAL NANALAL JAIN, LALITKUMAR GHERILAL JAIN
  • PartnerMAYUR NALINKANT SHAH

Key dates

this monthRegisteredApr 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

30%50 of 166 units booked
89.6%Work done, per cost certificate

Figures as on 24 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIQUE APARTMENTNA14147690166

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

UNIQUE APARTMENT: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed261

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots261
Open Space261

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,613 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTruhome Finance
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on26 Feb 2026
LandownerVillageDistrict
UNIQUE COOPERATIVE HOUSING SOCIETY LTDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI8462.19
Proposed, not sanctioned8,462 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLOOR NEW GULMOHAR 1 RAMEDI MAULANA AZAD RD OPP SHANTI MANDIR VASAI WEST 401201
Estimated costRs 21.04 cr
Cost incurredRs 18.85 cr
Work done89.57%
BuildingWingEstimatedIncurred
UNIQUE APARTMENTNARs 20.94 crRs 18.85 cr
-NARs 10.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHIMESH GUPTA & ASSOCIATES VIJAY GUPTA
EngineerVP CONSULTANTS
EngineerDEVANG DILIP MHATRE
Chartered AccountantR D LUKAD & CO D LUKAD
Chartered AccountantRAMESH DHONDIRAM LUKAD
PartnerRole in project
VARDHAMAN HOUSING-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Unique Form 2A (1) (1).pdf24 Aug 2026
Withdrawal Update Form 1File: FORM-1.pdf14 Aug 2026
Withdrawal Update Form 2File: UNIQUE FORM 2 .pdf14 Aug 2026
Withdrawal Update Form 3File: Form 3 VARDHAMAN HOUSING.pdf14 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf8 May 2026
Withdrawal Update Form 2File: FORM 2.pdf8 May 2026
Withdrawal Update Form 3File: vardhaman housing from 3.pdf8 May 2026
Form 5 (FY 2024-2025)File: vardhaman housing from 5 24-25.pdf8 May 2026
Form 5 (FY 2025-2026)File: vardhaman housing from 5 25-26.pdf8 May 2026
Withdrawal Update Form 1File: UNIQUE FORM-1.pdf3 Feb 2026
Withdrawal Update Form 2File: UNIQUE FORM-2.pdf3 Feb 2026
Withdrawal Update Form 3File: VARDHMAN HOUING UNIQUE APARTMENT_compressed.pdf3 Feb 2026
Withdrawal Update Form 1File: FORM 1 - 14-10-25.pdf8 Dec 2025
Withdrawal Update Form 1File: FORM 1 - 14-10-25.pdf8 Dec 2025
Withdrawal Update Form 2File: NOV 25 FORM 2.pdf8 Dec 2025
Withdrawal Update Form 2File: NOV 25 FORM 2.pdf8 Dec 2025
Withdrawal Update Form 3File: FORM3.pdf8 Dec 2025
Withdrawal Update Form 3File: VARDHAMAN HOUSING- Unique Apartment_11zon.pdf8 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VARDHAMAN HOUSING_0001 (1)_compressed.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UNIQUE FORM-1.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UNQUIE FORM 2 JAN-1_compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UNIQUE FOMR 2-2-JULY_compressed.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: sOLD uNSOLD.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UNIQUE April To June.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UNIQUE JULY TO SEP.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Unique Form1.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Unique Form2.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD APRIL TO JUNE24.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JULY TO SEP24.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2.pdf12 Dec 2024
Declaration in FORM BFile: VARDHAMAN HOUSING RERA UNDERTAKING.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UNIQUE FORM 1.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UNQIUE FORM 1.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UNIQUE FORM 2_compressed.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UNIQUE FOMR 2_compressed.pdf9 Dec 2024
Other - LegalFile: UNIQUE-DESIGNATED ACCOUNT_0001.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JULY TO SEP24.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD APRIL TO JUNE24.pdf9 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: UNIQUE-DESIGNATED ACCOUNT_0001.pdf9 Dec 2024
Other - FinanceFile: UNIQUE-FORMAT-A-DECLARATION SEPARATE BANK ACCOUNT_0001.pdf9 Dec 2024
Other - TechnicalFile: UNIQUE-APPLICATION CORRECTION UNDER PROJECT_0001.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: UNIQUE ENGG CERTIFICATE .pdf9 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: HDFC BANK UNIQUE.pdf9 Dec 2024
Other - TechnicalFile: 1 Copy of Layout Approval (in case of layout)(1).pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Disclosure of Interest in Other Real Estate Organizations.pdf13 Mar 2024
Declaration in FORM BFile: FORMB.pdf13 Feb 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf13 Feb 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf13 Feb 2024
Copy of the legal title reportFile: Rera title search.pdf12 Dec 2023
Building plan approvalFile: UNIQUE GROUND TO 6 PLAN_compressed_compressed.pdf5 Dec 2023
Building plan approvalFile: UNIQUE 7 TO 14 PLAN_compressed.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: UNIQUE GROUND TO 6 PLAN_compressed_compressed.pdf5 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: UNIQUE 7 TO 14 PLAN_compressed.pdf5 Dec 2023
Proforma of Allotment letterFile: Rera allotment UNIQUE.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (1).pdf17 Nov 2023
Layout approvalFile: UNIQUE LAYOUT PDF.PDF16 Nov 2023
Copy of Layout Approval (in case of layout)File: UNIQUE LAYOUT PDF.PDF16 Nov 2023
Details of encumbrances concerned to FinanceFile: Declaration legal.pdf11 Nov 2023
Details of encumbrances concerned to LegalFile: Declaration legal.pdf11 Nov 2023
Declaration about Commencement CertificateFile: CC declaration(3).pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter.pdf11 Nov 2023
CERSAI detailsFile: cersai.pdf11 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: saparate bank.pdf11 Nov 2023
Deviation Report with respect to Allotment letterFile: rera allotment(3).pdf11 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Rera agreement.pdf11 Nov 2023
PAN CardFile: PANCARD (1).pdf10 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Orders.pdf10 Nov 2023

How this compares with Palghar

30%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNIQUE APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR3,200+ in Palghar

2 kmUNIQUE APARTMENTCompleted 56Lapsed / revoked 32Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 190 registered projects within 2 km.

Builder: VARDHAMAN HOUSING

VARDHAMAN HOUSING has 1 registration on MahaRERA, including UNIQUE APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if UNIQUE APARTMENT is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIQUE APARTMENT?

The registered promoter entity is VARDHAMAN HOUSING, a partnership as per the filing. Its GSTIN 27AAWFV3483G1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIQUE APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNIQUE APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIQUE APARTMENT?

The professionals named in the filing: Architect: HIMESH GUPTA & ASSOCIATES VIJAY GUPTA; Engineer: VP CONSULTANTS; Engineer: DEVANG DILIP MHATRE; Chartered Accountant: R D LUKAD & CO D LUKAD; Chartered Accountant: RAMESH DHONDIRAM LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIQUE APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIQUE APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIQUE APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.