Home / Browse projects / Raigarh, Maharashtra / UNIMAX PRIDE
UNIMAX PRIDE
RG-MH-30656 · RERA P52000031129 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
UNIMAX PRIDE is a Residential / Group Housing project by MYCITY CONSTRUCTIONS LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000031129 on 5 Oct 2021. Possession is promised by 31 Dec 2026. 72 of the 132 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete.
At a glance
Project
- NameUNIMAX PRIDE
- TypeResidential / Group Housing
- Location
- KOYNAVALE
- GHOT VILLAGE
- Ghot
- Panvel
- Raigarh
- 410208
- Pincode410208
- RERA no.P52000031129
- ReraGenie IDRG-MH-30656
Builder
- NameMYCITY CONSTRUCTIONS LLP
- Entity typePartnership
- PartnersNISHIT AHIR, VIKRANT MAGGU, MUKESH SINGH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings3 building records
- Documents filed78 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| UNIMAX PRIDE BUILDING 1 | NA | 5 | 5 | 45 | 0 | 45 |
| UNIMAX PRIDE BUILDING 2 | NA | 5 | 4 | 29 | 0 | 29 |
| UNIMAX PRIDE BUILDING 3 | NA | 5 | 4 | 58 | 0 | 58 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 75%.
UNIMAX PRIDE BUILDING 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
UNIMAX PRIDE BUILDING 277%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
UNIMAX PRIDE BUILDING 377%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| UNIMAX PRIDE BUILDING 1 | NA | Rs 3.74 cr | Rs 3.54 cr |
| UNIMAX PRIDE BUILDING 2 | NA | Rs 3.58 cr | Rs 3.38 cr |
| UNIMAX PRIDE BUILDING 3 | NA | Rs 3.47 cr | Rs 3.28 cr |
| - | NA | Rs 47.63 lakh | Rs 16.67 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DEEPAK THAKARE |
| Engineer | SAMARTH SGARWAL |
| Chartered Accountant | MANISH KUMAR GUPTA & CO |
| Chartered Accountant | Dipika Patel |
| Partner | Role in project |
|---|---|
| MYCITY CONSTRUCTIONS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Feb 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 19 Form 1 Architect Certificate 31-03-2026.pdf | 6 Jul 2026 |
| Withdrawal Update Form 2File: 19 Engineers Certificate 31-03-2026.pdf | 6 Jul 2026 |
| Withdrawal Update Form 3File: 18 Unimax Pride Form-3 CA 31-03-2026.pdf | 6 Jul 2026 |
| Withdrawal Update Form 1File: 18 Form 1 Architect Certificate 31-12-2025.pdf | 17 Mar 2026 |
| Withdrawal Update Form 2File: 18 Engineers Certificate 31-12-2025.pdf | 17 Mar 2026 |
| Withdrawal Update Form 3File: 17 Unimax Pride Form-3 CA 31-12-2025.pdf | 17 Mar 2026 |
| Layout approvalFile: Scan_1799-01.pdf | 28 Feb 2026 |
| Building plan approvalFile: Scan_1799-02.pdf | 28 Feb 2026 |
| Building plan approvalFile: Scan_1799-03.pdf | 28 Feb 2026 |
| Building plan approvalFile: Scan_1799-04.pdf | 28 Feb 2026 |
| Commencement certificateFile: New CC 08-12-2023.pdf | 28 Feb 2026 |
| Withdrawal Update Form 1File: 17 Form 1 Architect Certificate 30-09-2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: 11 Engineeru0027s Certificate 31-3-2024.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: 10 Unimax Pride Form-3-CA 31-03-2024.pdf | 30 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf | 18 Dec 2025 |
| Form 1File: 15 Form 1 Architect's Certificate 31-03-2025.pdf | 17 Jul 2025 |
| Form 2File: 15 Engineer's Certificate 31-03-2025.pdf | 17 Jul 2025 |
| Form 3File: 14 Unimax Pride Form-3 CA 31-03-2025.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 Disclosure of Sold-Booked Inventories 31-03-2025.pdf | 17 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: 1 Self Declaration of Quarterly Progress 31-03-2025.pdf | 17 Jul 2025 |
| Form 1File: 16 Form 1 Architect's Certificate 30-06-2025.pdf | 17 Jul 2025 |
| Form 2File: 16 Engineer's Certificate 30-06-2025.pdf | 17 Jul 2025 |
| Form 3File: 15 Unimax Pride Form-3 CA 30-06-2025.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of Sold-Booked Inventories 30-06-2025.pdf | 17 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: 2 Self Declaration of Quarterly Progress 30-06-2025.pdf | 17 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Form 1 Architect's Certificate 31-12-2024.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 Unimax Pride Form-3 CA 31-12-2024.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer's Certificate 31-12-2024.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Form 1 Architect's Certificate 30-06-2024.pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Form 1 Architect's Certificate 30-09-2024.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 Unimax Pride Form-3 CA 30-06-2024.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Unimax Pride Form-3 CA 30-09-2024.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer's Certificate 30-06-2024.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Engineer's Certificate 30-09-2024.pdf | 9 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24 - Mycity.pdf | 22 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf | 29 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Form 1 Architect's Certificate 31-03-2024.pdf | 28 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer's Certificate 31-3-2024.pdf | 28 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Unimax Pride Form-3-CA 31-03-2024.pdf | 28 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: New CC 08-12-2023_compressed.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 Architect's Certificate 31-12-2023.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer's Certificate 30-12-2023.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Unimax Pride Form-3-CA 31-12-2023.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Engineer's Certificate 30-06-2023.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Unimax Pride Form-3-CA 30-06-2023.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Unimax Pride Form-3-CA 30-09-2023.pdf | 9 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 Architect's Certificate 30-09-2023.pdf | 6 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer's Certificate 30-09-2023.pdf | 6 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect certificate Form 30-06-2023.pdf | 6 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer's Certificate 30-06-2023.pdf | 6 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Unimax Pride Form-3-CA 31-03-2023.pdf | 12 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 Architect's Certificate 30-06-2022.pdf | 19 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer's Certificate 30-06-2022.pdf | 19 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 My city Form-3-CA Certificate 30-06-2022.pdf | 19 Jul 2022 |
| Proforma of Allotment letterFile: payment schedule.pdf | 21 Jun 2022 |
| OtherFile: payment schedule.pdf | 21 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf | 5 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2021_.pdf | 19 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer's Certificate 31-12-2021.pdf | 19 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Unimax Pride Form-3-CA.pdf | 19 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf | 27 Sep 2021 |
| Building plan approvalFile: Scan_0730-01_compressed.pdf | 25 Sep 2021 |
| Building plan approvalFile: Scan_0731-01_compressed.pdf | 25 Sep 2021 |
| Layout approvalFile: layout approval_compressed_finalllll'.pdf | 25 Sep 2021 |
| Building plan approvalFile: Scan_0729-01_compressed_compressed.pdf | 25 Sep 2021 |
| Copy of the legal title reportFile: Title Search report.pdf | 25 Sep 2021 |
| Details of encumbrancesFile: encumbrance certificate.pdf | 25 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: layout approval_compressed_finalllll'.pdf | 25 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_0729-01_compressed_compressed.pdf | 25 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_0730-01_compressed.pdf | 25 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_0731-01_compressed.pdf | 25 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration about cc.pdf | 25 Sep 2021 |
| Declaration in FORM BFile: Form B.pdf | 25 Sep 2021 |
| Proforma of Allotment letterFile: Allotment Letter Unimax Pride -RERA.pdf | 25 Sep 2021 |
| PAN CardFile: mycity constructions LLP PAN Card.pdf | 9 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy Ghot-6 (24_04_2021)_compressed (1).pdf | 9 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep UNIMAX PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GHOT VILLAGE5,900+ in Raigarh
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -1 Sector -31 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
SAI SUNCITY PHASE II
Chariot Properties LLP
Plot No. 14 Sector-37 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
ARIHANT ADARSH PHASE I
ARIHANT SUPERSTRUCTURES LIMITED
See every Raigarh project, with the district possession charts
Builder: MYCITY CONSTRUCTIONS LLP
MYCITY CONSTRUCTIONS LLP has 1 registration on MahaRERA, including UNIMAX PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if UNIMAX PRIDE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of UNIMAX PRIDE?
The registered promoter entity is MYCITY CONSTRUCTIONS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in UNIMAX PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for UNIMAX PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at UNIMAX PRIDE?
The professionals named in the filing: Architect: DEEPAK THAKARE; Engineer: SAMARTH SGARWAL; Chartered Accountant: MANISH KUMAR GUPTA & CO; Chartered Accountant: Dipika Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in UNIMAX PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback