ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Twilight Terrace

Registered No litigation declared Residential / Group Housing project

Twilight Terrace

By Shri Swami Samarath Developers

RG-MH-90187 · RERA P52100076955 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 0%
27 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Twilight Terrace is a Residential / Group Housing project by Shri Swami Samarath Developers in Pune, Maharashtra, registered with MahaRERA as P52100076955 on 9 Jul 2024. Possession is promised by 31 Mar 2027. 13 of the 40 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameTwilight Terrace
  • TypeResidential / Group Housing
  • Location
    • PAUD ROAD
    • BHUGAON
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100076955
  • ReraGenie IDRG-MH-90187

Builder

  • NameShri Swami Samarath Developers
  • Entity typePartnership
  • PartnersRamchandra Nagu Khabre, Yogesh Vadju More

Key dates

this monthRegisteredJul 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jul 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed71 files

Current status

32%13 of 40 units booked
16.7%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TWILIGHT TERRACE A WINGNA4420020
TWILIGHT TERRACE B WINGNA4420020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 0%.

TWILIGHT TERRACE A WING55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TWILIGHT TERRACE B WING36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed98

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots98
Open Space98
BuildingOpen SpaceTotal
TWILIGHT TERRACE A WING5353
TWILIGHT TERRACE B WING4545

Land and ownership12

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Aug 2025
LandownerVillageDistrict
Rupali Ravindra WanjalePune (M Corp.)Pune
Pradeep BondreKashigPune
Shasikant Dagadu NivekarNivePune
Bhanudas Namdeo ShindeOvalePune
Amit Ashok MohalKulePune
Sunil Sahadu ShindeOvalePune
Ravindra Manohar WanjalePune (M Corp.)Pune
Raj Laxman KhaireGevhande KhadakPune
Manohar Jayaji WanjalePune (M Corp.)Pune
Sagar Laxman PokalePune (M Corp.)Pune
Sunanda Laxman PokalePune (M Corp.)Pune
Bhagashri Sagar PokalePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMRDA Pune
Permissible FSI2200.0
Proposed, not sanctioned2,157 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURVEY NO 529/2, GROUND FLOOR, BHUGAON, PUNE 412115
Estimated costRs 7.80 cr
Cost incurredRs 1.30 cr
Work done16.67%
BuildingWingEstimatedIncurred
TWILIGHT TERRACE A WINGNARs 3.50 crRs 1.00 cr
TWILIGHT TERRACE B WINGNARs 3.50 crRs 25.00 lakh
-NARs 80.00 lakhRs 5.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGIRAJ ASSOCIATES
EngineerSHRIKANT MATRE
Chartered AccountantDINESH KUDALE
PartnerRole in project
Shri Swami Samarath Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect.pdf27 Apr 2026
Withdrawal Update Form 2File: Engg.pdf27 Apr 2026
Withdrawal Update Form 3File: CA.pdf27 Apr 2026
Withdrawal Update Form 1File: Architect.pdf18 Dec 2025
Withdrawal Update Form 2File: Engineer.pdf18 Dec 2025
Withdrawal Update Form 3File: CA Certificate.pdf18 Dec 2025
Withdrawal Update Form 1File: Architect.pdf15 Oct 2025
Withdrawal Update Form 2File: Engineer.pdf15 Oct 2025
Withdrawal Update Form 3File: CA Certificate.pdf15 Oct 2025
Form 1File: Architect Certi.pdf4 Aug 2025
Form 2File: Engi.pdf4 Aug 2025
Form 3File: CA Certifi.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Sept 24.pdf4 Aug 2025
Form 1File: Arch Dec 24.pdf4 Aug 2025
Form 2File: Engg Dec 24.pdf4 Aug 2025
Form 3File: CA Dec 24.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Dec 24.pdf4 Aug 2025
Form 1File: Arch Mar 25.pdf4 Aug 2025
Form 2File: Engg Mar 25.pdf4 Aug 2025
Form 3File: CA Mar 25.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Mar 25.pdf4 Aug 2025
OthersFile: Fom 5 2425.pdf4 Aug 2025
Form 1File: Arch Jun 25.pdf4 Aug 2025
Form 2File: Engg Jun 25.pdf4 Aug 2025
Form 3File: CA Jun 25.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Jun 25.pdf4 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifi.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi.pdf7 May 2025
Copy of the legal title reportFile: Search 251 com.pdf27 Jun 2024
Copy of the legal title reportFile: Search 259 com.pdf27 Jun 2024
Other - LegalFile: Clarification On Survey No.pdf27 Jun 2024
Other - LegalFile: PMRDA Inward Letter.pdf27 Jun 2024
Other - LegalFile: More undertaking .pdf27 Jun 2024
CERSAI detailsFile: Cersai.pdf19 Apr 2024
Other - LegalFile: Title.pdf19 Apr 2024
Other - LegalFile: भुगांव_251.pdf19 Apr 2024
Other - LegalFile: भुगांव_259.pdf19 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf30 Mar 2024
Details of encumbrances concerned to FinanceFile: Legal Litigation Encumbrance.pdf30 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance.pdf30 Mar 2024
Details of encumbrances concerned to LegalFile: Legal Litigation Encumbrance.pdf30 Mar 2024
CERSAI detailsFile: Asset Based CERSAI.pdf30 Mar 2024
Other - TechnicalFile: PMRDA Gmail 251 P 259 P.pdf30 Mar 2024
Other - FinanceFile: CA Certificate.pdf26 Mar 2024
Other - TechnicalFile: Annexture A.pdf26 Mar 2024
Layout approvalFile: Saction 1.pdf27 Feb 2024
Building plan approvalFile: Saction 1.pdf27 Feb 2024
Building plan approvalFile: Saction 2.pdf27 Feb 2024
PAN CardFile: PAN Company.pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: Letter of Encumbrance.pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: Letter of Encumbrance.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: Saction 1.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Saction 1.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Saction 2.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement co.pdf27 Feb 2024
Declaration about Commencement CertificateFile: Declaration about Commencement certificate.pdf27 Feb 2024
Declaration in FORM BFile: Undertaking Form B.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf27 Feb 2024
CERSAI detailsFile: Asset Based Search.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate co.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXTURE- A.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexture A.pdf27 Feb 2024
Proforma of Agreement for saleFile: Agreement to sale co.pdf27 Feb 2024
Proforma of Allotment letterFile: Allotment Letter co.pdf27 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Account.pdf27 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for AL AFS.pdf27 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for AL AFS.pdf27 Feb 2024

How this compares with Pune

32%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Twilight Terrace on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHUGAON13,700+ in Pune

Builder: Shri Swami Samarath Developers

Shri Swami Samarath Developers has 1 registration on MahaRERA, including Twilight Terrace. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Twilight Terrace is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Twilight Terrace?

The registered promoter entity is Shri Swami Samarath Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Twilight Terrace?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Twilight Terrace?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Twilight Terrace?

The professionals named in the filing: Architect: YOGIRAJ ASSOCIATES; Engineer: SHRIKANT MATRE; Chartered Accountant: DINESH KUDALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Twilight Terrace?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Twilight Terrace. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Twilight Terrace to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.