Home / Browse projects / Kolhapur, Maharashtra / TUSTI
TUSTI
By Ramsina Constructions Pvt. Ltd
RG-MH-27357 · RERA P53000034161 · Last updated on MahaRERA portal: 2 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TUSTI is a Residential / Group Housing project by Ramsina Constructions Pvt. Ltd in Kolhapur, Maharashtra, registered with MahaRERA as P53000034161 on 24 Mar 2022. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 4 of the 22 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameTUSTI
- TypeResidential / Group Housing
- Location
- BAWADA ROAD
- NAGALA PARK
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416003
- Pincode416003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000034161
- ReraGenie IDRG-MH-27357
Builder
- NameRamsina Constructions Pvt. Ltd
- Entity typeCompany
- DirectorsSachin Abhaykumar Oswal, Sanjeevani Abhaykumar Oswal, KAVITA LAKHMICHAND NOTANI
- DirectorVIKESH ABHAYKUMAR OSWAL
- Other registrations3 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Mar 2022
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings1 building record
- Documents filed109 files
Current status
Figures as on 2 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TUSTI | NA | 16 | 11 | 22 | 0 | 22 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.
TUSTI: 58% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed90
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TUSTI | NA | Rs 17.37 cr | Rs 6.47 cr |
| - | NA | Rs 1.97 cr | Rs 5.71 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAVEEN S BAVADEKAR |
| Engineer | SHEKHAR S REVALKAR |
| Chartered Accountant | CA NIRAJ V NAWANDHAR |
| Chartered Accountant | SAW & Associates SIDDHARTH PRAVIN SHAHA |
| Partner | Role in project |
|---|---|
| Ramsina Constructions Pvt. Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed109
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Architect Certificate (F).pdf | 2 Jun 2025 |
| Form 2File: Form 2 - Engineers certificate_Tusti (F).pdf | 2 Jun 2025 |
| Form 3File: Form 3-Project Tusti_Dec2024.pdf | 2 Jun 2025 |
| Form 1File: Form 1 - Architect Certificate (F).pdf | 2 Jun 2025 |
| Form 2File: Form 2 - Engineers certificate_Tusti (F).pdf | 2 Jun 2025 |
| Form 3File: Form 3_CERTIFICATE TUSTI (F).pdf | 2 Jun 2025 |
| Form 1File: Form-1-Architect Certificate_June2024.pdf | 2 Jun 2025 |
| Form 2File: Form-2-Engineers certificate_Tusti_June2024.pdf | 2 Jun 2025 |
| Form 3File: Form-3-Project Tusti_June2024_compressed.pdf | 2 Jun 2025 |
| Form 1File: Form 1 - Architect Certificate.pdf | 2 Jun 2025 |
| Form 2File: Form 2 - Engineers certificate_Tusti.pdf | 2 Jun 2025 |
| Form 3File: Form No 3 Tusti.pdf | 2 Jun 2025 |
| Form 1File: Form 1 - Architect Certificate.pdf | 2 Jun 2025 |
| Form 2File: Form 2 - Engineers certificate_Tusti.pdf | 2 Jun 2025 |
| Form 3File: Form 3 - CA Certificate.pdf | 2 Jun 2025 |
| Form 1File: Tusti_Architect_Form 1.pdf | 2 Jun 2025 |
| Form 2File: Tusti_Engineers_Form 2.pdf | 2 Jun 2025 |
| Form 3File: Tusti_CA Form_3_compressed.pdf | 2 Jun 2025 |
| Withdrawal Update Form 1File: Form 1 - Architect Certificate (F).pdf | 2 Jun 2025 |
| Withdrawal Update Form 2File: Form 2 - Engineers certificate_Tusti (F).pdf | 2 Jun 2025 |
| Withdrawal Update Form 3File: Form 3 - Chartered Accountant Certificate.pdf | 2 Jun 2025 |
| Form 5 (FY 2021-2022)File: Tusti FORM-5_202122.pdf | 2 Jun 2025 |
| Form 5 (FY 2022-2023)File: Form No 5-March2023-Tusti.pdf | 2 Jun 2025 |
| Form 1File: Form 1 - Architect Certificate (F).pdf | 26 May 2025 |
| Building plan approvalFile: Tusti revised sanction 8-1-2025-1.pdf | 23 Apr 2025 |
| Building plan approvalFile: Tusti revised sanction 8-1-2025-2.pdf | 23 Apr 2025 |
| Building plan approvalFile: Tusti revised sanction 8-1-2025-3.pdf | 23 Apr 2025 |
| Building plan approvalFile: Tusti revised sanction 8-1-2025-4.pdf | 23 Apr 2025 |
| Building plan approvalFile: Tusti revised sanction 8-1-2025-5.pdf | 23 Apr 2025 |
| Building plan approvalFile: Tusti revised sanction 8-1-2025-6.pdf | 23 Apr 2025 |
| Building plan approvalFile: Tusti revised sanction 8-1-2025-7.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Project Tusti_Dec2024.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tusti revised sanction 8-1-2025-1.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tusti revised sanction 8-1-2025-2.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tusti revised sanction 8-1-2025-3.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tusti revised sanction 8-1-2025-4.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tusti revised sanction 8-1-2025-5.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tusti revised sanction 8-1-2025-6.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tusti revised sanction 8-1-2025-7.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate (F).pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate (F).pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 31122024-DISCLOSURE OF SOLD BOOKED INVENTORY_Srushti B_C.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1-Punya Srushti Architect Certificate (F).pdf | 17 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate (F).pdf | 17 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CERTIFICATE TUSTI (F).pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2-Engineer's certificate (F).pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers certificate_Tusti (F).pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_SrushtiBandC.pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 17 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architect Certificate_June2024.pdf | 19 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Engineers certificate_Tusti_June2024.pdf | 19 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_Tusti_June2024.pdf | 19 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Project Tusti_June2024_compressed.pdf | 19 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers certificate_Tusti.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 Tusti.pdf | 30 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other organisations.pdf | 15 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers certificate_Tusti.pdf | 12 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf | 12 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5-March2023-Tusti.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tusti_Architect_Form 1.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tusti_Engineers_Form 2.pdf | 25 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tusti_CA Form_3_compressed.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tusti FORM-5_202122.pdf | 14 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA_Form-1_compressed.pdf | 31 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA_Form-2_compressed.pdf | 31 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA_Form-3_compressed.pdf | 31 Dec 2022 |
| Proforma of Agreement for saleFile: Microsoft Word - Draft of ATS 250 B Tusti.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Declaration_Legal_Tusti.pdf | 30 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Declaration_Legal_Tusti.pdf | 30 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration_Separate Bank_Tusti.pdf | 30 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report_AL_Tusti.pdf | 30 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report_Agreement_Tusti.pdf | 30 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2022.pdf | 22 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate march 2022 update.pdf | 18 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Tusti March 2022 1.pdf | 18 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf | 18 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate (2).pdf | 18 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 18 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 109 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep TUSTI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NAGALA PARK880+ in Kolhapur
Filed coordinates, straight-line distance. 123 registered projects within 2 km.
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
Loknagari Karande Mala
VIKESH ABHAYKUMAR OSWAL
KRYSTAL TOWERS
RAYSONS CONSTRUCTIONS
GAYATRI-BHAWANI APARTMENT
Vijaykumar Vasudev Patki
EMINENT VISION TOWER
ACE DEVELOPERS
THE PARKSIDE
DESHPANDE INFRA
See every Kolhapur project, with the district possession charts
Builder: Ramsina Constructions Pvt. Ltd
Ramsina Constructions Pvt. Ltd has 4 registrations on MahaRERA, including TUSTI and PUNYA ARPIT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that TUSTI shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if TUSTI is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TUSTI?
The registered promoter entity is Ramsina Constructions Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TUSTI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TUSTI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TUSTI?
The professionals named in the filing: Architect: PRAVEEN S BAVADEKAR; Engineer: SHEKHAR S REVALKAR; Chartered Accountant: CA NIRAJ V NAWANDHAR; Chartered Accountant: SAW & Associates SIDDHARTH PRAVIN SHAHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TUSTI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback