TURTLE SPARSH

By MEHUL BHARAT SHAH

RG-MH-06959 · RERA P52000053646 · Last updated on MahaRERA portal: 3 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
4 of 11Construction stages donefurthest along: Staircases, 80%
39 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

TURTLE SPARSH is a Others project by MEHUL BHARAT SHAH in Raigarh, Maharashtra, registered with MahaRERA as P52000053646 on 21 Nov 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 0 of the 39 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTURTLE SPARSH
  • TypeOthers
  • Location
    • NA
    • SECTOR 18
    • Taloje Panchnad
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053646
  • ReraGenie IDRG-MH-06959

Builder

  • NameMEHUL BHARAT SHAH
  • Entity typeIndividual
  • Other registrations1 more →

Key dates

this monthRegisteredNov 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Nov 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed83 files

Current status

0%0 of 39 units booked
26.9%Work done, per cost certificate

Figures as on 3 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TURTLE SPARSHNA7735439

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

TURTLE SPARSH: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure43%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered20
Open Space15

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area634 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on17 Jun 2025

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation Of Maharashtra Ltd
Permissible FSI2019.48
Proposed, not sanctioned2,018 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch ICICI BANK LTD G3/4 PLOT NO 86 DHARAM JEEVAN CHS SECTOR 6 KOPERKHAIRANE, NAVI MUMBAI 400 709
Estimated costRs 3.62 cr
Cost incurredRs 97.26 lakh
Work done26.87%
BuildingWingEstimatedIncurred
TURTLE SPARSHNARs 3.29 crRs 97.26 lakh
-NARs 32.90 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARIF PUNJABI
EngineerVILAS AGHARKAR
Chartered AccountantCA ASHISH BANG
Chartered AccountantA T UPADHYE & CO.
PartnerRole in project
MEHUL BHARAT SHAH-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17122518712Dec 2025 → Dec 2027

Reason as filed by the promoterThe project was originally submitted for approval in a timely manner; however, the revised approval was granted after a lapse of approximately one year from the date of application. Owing to this substantial delay in receipt of the revised approval, which was beyond the control of the promoter, the project could not be completed within the originally stipulated timeline. The delay in completion is directly attributable to the belated issuance of the revised approval, and not due to any wilful default, negligence, or inaction on the part of the promoter.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A_2024-2025_TURTLE SPARSH.pdf3 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5_2024-2025_TURTLE SPARSH.pdf3 Feb 2026
Withdrawal Update Form 1File: FORM 1_ DEC 25_ TURTLE SPARSH.pdf27 Jan 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ TURTLE SPARSH.pdf27 Jan 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ TURTLE SPARSH.pdf27 Jan 2026
Withdrawal Update Form 1File: FORM 1_ SEP 25_ TURTLE SPARSH.pdf16 Dec 2025
Withdrawal Update Form 1File: FORM 1_ SEP 25_ TURTLE SPARSH.pdf16 Dec 2025
Withdrawal Update Form 2File: FORM 2_ SEP 25_ TURTLE SPARSH (1).pdf16 Dec 2025
Withdrawal Update Form 2File: FORM 2_ SEP 25_ TURTLE SPARSH (1).pdf16 Dec 2025
Withdrawal Update Form 3File: FORM 3_ SEP 25_ TURTLE SPARSH.pdf16 Dec 2025
Withdrawal Update Form 3File: FORM 3_ SEP 25_ TURTLE SPARSH.pdf16 Dec 2025
Building plan approvalFile: REVISED PLAN_ TURTLE SPARSH.pdf10 Nov 2025
Building plan approvalFile: REVISED PLAN_ TURTLE SPARSH.pdf3 Oct 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ TURTLE SPARSH.pdf3 Oct 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ TURTLE SPARSH.pdf3 Oct 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ TURTLE SPARSH.pdf3 Oct 2025
Form 1File: FORM 1_ MARCH 25_ TURTLE SPARSH.pdf20 Jun 2025
Form 2File: FORM 2_ MARCH 25_ TURTLE SPARSH.pdf20 Jun 2025
Form 3File: FORM 3_ MARCH 25_ TURTLE SPARSH.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ TURTLE SPARSH.pdf20 Jun 2025
Withdrawal Update Form 1File: FORM 1_ MARCH 25_ TURTLE SPARSH.pdf20 Jun 2025
Withdrawal Update Form 2File: FORM 2_ MARCH 25_ TURTLE SPARSH.pdf20 Jun 2025
Withdrawal Update Form 3File: FORM 3_ MARCH 25_ TURTLE SPARSH.pdf20 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_ MARCH 24_compressed.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ MARCH 24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 24.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ JUNE 24.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 24.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_MARCH 24 compressed.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_JUNE 24compressed.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ SEP 24.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ DEC 24_compressed.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 24.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ DEC 24.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_SEP 24.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ JUNE 24.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 24 (1).pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ JUNE 24 (1).pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 24 (1).pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_SEP 24.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf17 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-TURTLE SPARSH_DEC 23.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-TURTLE SPARSH_DEC 23.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-TURTLE SPARSH_DEC 23.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-TURTLE SPARSH_DEC 23.pdf12 Mar 2024
Copy of the legal title reportFile: TITLE.pdf3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MEHUL FORM .pdf1 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow1 Nov 2023
Layout approvalFile: PLAN.pdf26 Oct 2023
Building plan approvalFile: PLAN.pdf26 Oct 2023
PAN CardFile: 1 PAN CARD.PDF26 Oct 2023
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf26 Oct 2023
Copy of Layout Approval (in case of layout)File: PLAN.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf26 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 COMMENCEMET CERTIFICATE PRINT.pdf26 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 7-1 CC PLINTH PRINT.pdf26 Oct 2023
Declaration about Commencement CertificateFile: 8 Declaration about Commencement Certificate.pdf26 Oct 2023
Declaration in FORM BFile: 9 FORM B.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)_compressed.pdf26 Oct 2023
CERSAI detailsFile: 12 CERSAI details.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organizations.pdf26 Oct 2023
Proforma of Agreement for saleFile: 15 Proforma of Agreement for sale.pdf26 Oct 2023
Proforma of Allotment letterFile: 16 Proforma of Allotment letter.pdf26 Oct 2023
Deviation Report with respect to Allotment letterFile: 19 Deviation Report with respect to Allotment letter.pdf26 Oct 2023
Deviation Report with respect to model copy of AgreementFile: 20 Deviation Report with respect to model copy of Agreement.pdf26 Oct 2023
Other - LegalFile: 17 Legal- Other_compressed-1-12.pdf26 Oct 2023

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 24 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TURTLE SPARSH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR 185,900+ in Raigarh

2 kmTURTLE SPARSHCompleted 67Lapsed / revoked 16Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 162 registered projects within 2 km.

Builder: MEHUL BHARAT SHAH

MEHUL BHARAT SHAH has 2 registrations on MahaRERA, including SIDDHSHILA and TURTLE SPARSH. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if TURTLE SPARSH is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TURTLE SPARSH?

The registered promoter entity is MEHUL BHARAT SHAH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TURTLE SPARSH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TURTLE SPARSH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TURTLE SPARSH?

The professionals named in the filing: Architect: ARIF PUNJABI; Engineer: VILAS AGHARKAR; Chartered Accountant: CA ASHISH BANG; Chartered Accountant: A T UPADHYE & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TURTLE SPARSH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TURTLE SPARSH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TURTLE SPARSH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.