TRIVENI HEIGHTS
By TRIVENI BUILDERS AND DEVELOPERS
RG-MH-93760 · RERA P52000019312 · Last updated on MahaRERA portal: 20 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 6 complaints at MahaRERA
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TRIVENI HEIGHTS is a Residential / Group Housing project by TRIVENI BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000019312 on 23 Jan 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 18 months from the original filing. 47 of the 101 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.
At a glance
Project
- NameTRIVENI HEIGHTS
- TypeResidential / Group Housing
- Location
- PLOT NO. 180
- SECTOR - 9
- Ulawe
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000019312
- ReraGenie IDRG-MH-93760
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Jan 2019
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed63 files
Current status
Figures as on 20 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TRIVENI HEIGHTS | NA | 15 | 12 | 70 | 31 | 101 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.
TRIVENI HEIGHTS: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed39
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| TRIVENI BUILDERS AND DEVELOPERS | Kamothe | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TRIVENI HEIGHTS | NA | Rs 15.00 cr | Rs 14.25 cr |
| - | NA | Rs 5.00 cr | Rs 5.00 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DESTINATION ARCHITECTURE INTERIOR DESIGNS |
| Architect | RAHULKUMAR V CHHABHAIYA |
| Engineer | B S SUKTHANKAR AND ASSOCIATES |
| Engineer | VIJAY KUMAR SINGH |
| Chartered Accountant | AVINASH SINYAL AND CO |
| Chartered Accountant | KEYUR BHAYANI AND ASSOCIATES KEYUR BHAYANI AND ASSOCIATES |
| Chartered Accountant | SHRADDHA KALPESH GURAV AND ASSOCIATES SHRADDHA KALPESH GURAV AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| TRIVENI BUILDERS AND DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO SOME FINANCIAL CRISES AND PERSONAL ISSUE CAN NOT COMPLETED THE PROJECT WITHIN DUE DATE SO REQUEST YOU APPROVED THE EXTENSION REQUEST.
Reason as filed by the promoterWORK IS ON FINAL STAGE SOM FINFISHIG WORK AND APPLYING OC MAY TAKE TWO MONTHS APPROX TO CPMPLETE BUT PROJECT COMPLETION DATE OS THJUNE 25 IS COMING TO EXPRIE HENCE APPLIED FOR EXTENTION
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500200 | Vimal Dilip Shah | TRIVENI BUILDERS AND DEVELOPERS | 21/01/2025 |
| CC12500226 | BHAVIN RAMNIKLAL KENIA | TRIVENI BUILDERS AND DEVELOPERS | 23/01/2025 |
| CC12500239 | HETAL BHAVIN KENIA | TRIVENI BUILDERS AND DEVELOPERS | 23/01/2025 |
| CC12500241 | SHAILEN SHAMJI GALA | TRIVENI BUILDERS AND DEVELOPERS | 23/01/2025 |
| CC12500242 | SHAILEN SHAMJI GALA HUF | TRIVENI BUILDERS AND DEVELOPERS | 23/01/2025 |
| CC12500244 | GIRDHARI BAJRANGLAL AGRAWAL | TRIVENI BUILDERS AND DEVELOPERS | 23/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jan 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE DEC 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE DEC 25.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf | 20 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 JUN 25.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 SEPT 25.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: JUN 2025.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: SEPT 2025.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: SEPT 2025 NEW.pdf | 14 Feb 2026 |
| Form 5 (FY 2024-2025)File: triveni.pdf | 29 Sep 2025 |
| Form 5 (FY 2023-2024)File: FORM 5.pdf | 16 Jun 2025 |
| Form 1File: FORM 1.pdf | 14 Jun 2025 |
| Form 2File: FORM 2.pdf | 14 Jun 2025 |
| Form 3File: CA CERTIFICATE.pdf | 14 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOCLOSURE OF SOLD INVENTORY.pdf | 14 Jun 2025 |
| Form 1File: FORM 1.pdf | 14 Jun 2025 |
| Form 2File: FORM 2.pdf | 14 Jun 2025 |
| Form 3File: FORM 3.pdf | 14 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOCLOSURE OF SOLD INVENTORY.pdf | 14 Jun 2025 |
| Form 1File: FORM 1.pdf | 14 Jun 2025 |
| Form 2File: FORM 2.pdf | 14 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 14 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOCLOSURE OF SOLD INVENTORY.pdf | 14 Jun 2025 |
| Form 1File: SEPT FORM 1.pdf | 14 Jun 2025 |
| Form 2File: SEPT FORM 2.pdf | 14 Jun 2025 |
| Form 3File: FORM 3 CERTIFICATE OCT 2024.pdf | 14 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOCLOSURE OF SOLD INVENTORY.pdf | 14 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 15 Apr 2025 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 15 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 15 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 21 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 21 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 1.pdf | 21 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 21 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf | 19 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JUNE FORM 1.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SEPT FORM 1.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 3 CERTIFICATE JULY 2024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 3 CERTIFICATE OCT 2024.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JUNE FORM 2.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEPT FORM 2.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 1 Jul 2024 |
| Declaration in FORM BFile: AFFIDAVIT FORM B FOR EXTENTION.pdf | 28 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 24 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 24 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: DOCLOSURE OF SOLD INVENTORY.pdf | 21 Jun 2024 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 21 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf | 25 Jan 2020 |
| Building plan approvalFile: Layout Approval Part1.pdf | 16 Jan 2019 |
| Layout approvalFile: Layout Approval Part2.pdf | 16 Jan 2019 |
| PAN CardFile: Pan card.pdf | 16 Jan 2019 |
| Copy of the legal title reportFile: Search cum Title Report.pdf | 16 Jan 2019 |
| Details of encumbrancesFile: Form B.pdf | 16 Jan 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Approval Part2.pdf | 16 Jan 2019 |
| Building Plan Approval (IOD)File: Layout Approval Part1.pdf | 16 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 16 Jan 2019 |
| Declaration in FORM BFile: Form B.pdf | 16 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf | 16 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 16 Jan 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 16 Jan 2019 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 16 Jan 2019 |
| Proforma of Allotment letterFile: Draft Agreement.pdf | 16 Jan 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| THE DREAM | PLOT NO. 6 SECTOR 6A KAMOTHE NAVI MUMBAI - 410209 | 48 | Completed | Mar 2018 | Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TRIVENI HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR - 95,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: TRIVENI BUILDERS AND DEVELOPERS
TRIVENI BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including TRIVENI HEIGHTS and KANAK PARADISE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that TRIVENI HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if TRIVENI HEIGHTS is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TRIVENI HEIGHTS?
The registered promoter entity is TRIVENI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TRIVENI HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against TRIVENI HEIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for TRIVENI HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TRIVENI HEIGHTS?
The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS; Architect: RAHULKUMAR V CHHABHAIYA; Engineer: B S SUKTHANKAR AND ASSOCIATES; Engineer: VIJAY KUMAR SINGH; Chartered Accountant: AVINASH SINYAL AND CO; Chartered Accountant: KEYUR BHAYANI AND ASSOCIATES KEYUR BHAYANI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRIVENI HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback