Home / Browse projects / Mumbai Suburban, Maharashtra / TRITON
TRITON
By Jade Constructions Private Limited
RG-MH-30602 · RERA P51800031222 · Last updated on MahaRERA portal: 23 Apr 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TRITON is a Residential / Group Housing project by Jade Constructions Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031222 on 11 Oct 2021. The registration is recorded completed; possession was promised by 1 Jul 2025.
At a glance
Project
- NameTRITON
- TypeResidential / Group Housing
- Location
- 17TH ROAD
- SANTACRUZ WEST
- Andheri
- Mumbai Suburban
- 400054
- Pincode400054
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800031222
- ReraGenie IDRG-MH-30602
Builder
- NameJade Constructions Private Limited
- Entity typeCompany
- DirectorADITYA V MIRCHANDANI
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Oct 2021
- Promised completion1 Jul 2025
- Revised completionNone
- Buildings3 building records
- Documents filed53 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 19 | 0 | 0 | 0 | 0 |
| WING C | NA | 19 | 0 | 0 | 0 | 0 |
| WING B | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 23 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
WING A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 65% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 75% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed26
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 24 | 24 |
| WING C | 1 | 1 |
| WING B | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| GANGA JAMUNA CHSL | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARK Reza Kabul Architect Pvt Ltd |
| Engineer | Nexus Project Solutions Pvt. Ltd |
| Chartered Accountant | SURAJ SHETTY & CO |
| Partner | Role in project |
|---|---|
| Jade Constructions Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Apr 2024
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Mar 24.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Mar24.pdf | 23 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20240405_FORM 3 CA Triton_Mar 24.pdf | 20 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2414343_OC_signed.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Dec 23.pdf | 5 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Dec23_compressed.pdf | 5 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Triton_Dec 23.pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5_JCPL_2022-23.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_Sept 23.pdf | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Sept23.pdf | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220706_CA Certificate_Triton_Sept 23_compressed.PDF | 6 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220706_CA Certificate_Triton_June 23_compressed.pdf | 7 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_June 23_compressed.pdf | 6 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_June23.pdf | 6 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Mar 23.pdf | 7 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Mar23.pdf | 7 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20230405_FORM 3 CA Triton_Mar 23.pdf | 7 Apr 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_Security_Interest_Id_Based_Search_15_11_2022_16_25_25_451.pdf | 13 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Triton_Dec 22_compressed.pdf | 7 Jan 2023 |
| Declaration about Commencement CertificateFile: Form D_Declaration about CC_Dec22.pdf | 6 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Dec 22_compressed.pdf | 6 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Dec22.pdf | 6 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form No 5_JCPL_2021-22.pdf | 13 Oct 2022 |
| Details of encumbrancesFile: self declaration for Encumbrances_Oct 2022.pdf | 8 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_Sept 22_compressed.pdf | 7 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Sept22.pdf | 7 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20221006_CA Certificate_Triton_Sept 22_compressed.pdf | 7 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_June 22_compressed.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_June22.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220706_CA Certificate_Triton_June 22.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220406_FORM 3 CA Triton_Mar 22_compressed.pdf | 7 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Mar 22_compressed.pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Mar22.pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Dec21.pdf | 6 Jan 2022 |
| CERSAI detailsFile: CERSAI Declaration_Triton_Dec21_compressed.pdf | 6 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Dec 21_compressed.pdf | 5 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Triton_Dec 21_compressed.pdf | 5 Jan 2022 |
| Layout approvalFile: 2275067Amendletter_signed.pdf | 4 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: 2275067Amendletter_signed.pdf | 4 Jan 2022 |
| Declaration about Commencement CertificateFile: Form D_Declaration about CC_Dec21.pdf | 4 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2307015_FurtherCC_signed.pdf | 3 Jan 2022 |
| PAN CardFile: Pan Card Jade.PDF | 30 Sep 2021 |
| Proforma of Allotment letterFile: RERA Sale Agreement_JCPL_FINAL RERA.pdf | 23 Sep 2021 |
| Declaration about Commencement CertificateFile: Form D_Declaration about Commencement Certificate.pdf | 22 Sep 2021 |
| Copy of the legal title reportFile: Title - RERA Format_compressed.pdf | 20 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20210916_CA certificate_New Project_compressed.pdf | 17 Sep 2021 |
| Building plan approvalFile: Building Plan_compressed.pdf | 15 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan_compressed.pdf | 15 Sep 2021 |
| Declaration in FORM BFile: FORM -B_compressed.pdf | 15 Sep 2021 |
| Details of encumbrancesFile: Self Declaration for Encumbrances.pdf | 13 Sep 2021 |
| Layout approvalFile: 2275532_IOD_signed.pdf | 11 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: 2275532_IOD_signed.pdf | 11 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 2287492_FirstCC_signed.pdf | 11 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 53 filed documents as one ZIP, foldered, with a manifest
Keep TRITON on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SANTACRUZ WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 289 registered projects within 2 km.
AVIARA
BALUWALA BUILDERS
Ruparel Panache
Ruparel Infra & Realty Pvt Ltd
Vascon Orchids
Vascon Engineers Ltd
COMMERZ 54
SHREE VINAYAK REALITY PRIVATE LIMITED
Vascon Onyx Residences
Vascon Engineers Ltd
REDEVELOPMENT OF SHINING STAR CHSL
PRANAV CONSTRUCTIONS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: Jade Constructions Private Limited
Jade Constructions Private Limited has 1 registration on MahaRERA, including TRITON. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if TRITON is delayed beyond 1 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TRITON?
The registered promoter entity is Jade Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TRITON?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TRITON?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TRITON?
The professionals named in the filing: Architect: ARK Reza Kabul Architect Pvt Ltd; Engineer: Nexus Project Solutions Pvt. Ltd; Chartered Accountant: SURAJ SHETTY & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRITON?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback