Completed No litigation declared Residential / Group Housing project

TRITON

By Jade Constructions Private Limited

RG-MH-30602 · RERA P51800031222 · Last updated on MahaRERA portal: 23 Apr 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2025Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

TRITON is a Residential / Group Housing project by Jade Constructions Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031222 on 11 Oct 2021. The registration is recorded completed; possession was promised by 1 Jul 2025.

At a glance

Project

  • NameTRITON
  • TypeResidential / Group Housing
  • Location
    • 17TH ROAD
    • SANTACRUZ WEST
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031222
  • ReraGenie IDRG-MH-30602

Builder

  • NameJade Constructions Private Limited
  • Entity typeCompany
  • DirectorADITYA V MIRCHANDANI

Key dates

this monthRegisteredOct 2021PromisedJul 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Oct 2021
  • Promised completion1 Jul 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA190000
WING CNA190000
WING BNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

WING A90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26
BuildingClosed/CoveredTotal
WING A2424
WING C11
WING B11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,358 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GANGA JAMUNA CHSLAndheriMumbai Suburban

Approvals and building plan

Permissible FSI11466.79
Proposed, not sanctioned11,464 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNo G/1, Woodrose, Swami Samarth Nagar, Mumbai, Maharashtra 400053

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARK Reza Kabul Architect Pvt Ltd
EngineerNexus Project Solutions Pvt. Ltd
Chartered AccountantSURAJ SHETTY & CO
PartnerRole in project
Jade Constructions Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Apr 2024

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Mar 24.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Mar24.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20240405_FORM 3 CA Triton_Mar 24.pdf20 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2414343_OC_signed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Dec 23.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Dec23_compressed.pdf5 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Triton_Dec 23.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5_JCPL_2022-23.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_Sept 23.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Sept23.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220706_CA Certificate_Triton_Sept 23_compressed.PDF6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220706_CA Certificate_Triton_June 23_compressed.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_June 23_compressed.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_June23.pdf6 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Mar 23.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Mar23.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20230405_FORM 3 CA Triton_Mar 23.pdf7 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_Security_Interest_Id_Based_Search_15_11_2022_16_25_25_451.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Triton_Dec 22_compressed.pdf7 Jan 2023
Declaration about Commencement CertificateFile: Form D_Declaration about CC_Dec22.pdf6 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Dec 22_compressed.pdf6 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Dec22.pdf6 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form No 5_JCPL_2021-22.pdf13 Oct 2022
Details of encumbrancesFile: self declaration for Encumbrances_Oct 2022.pdf8 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_Sept 22_compressed.pdf7 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Sept22.pdf7 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20221006_CA Certificate_Triton_Sept 22_compressed.pdf7 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certitifcate_Triton_June 22_compressed.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_June22.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220706_CA Certificate_Triton_June 22.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20220406_FORM 3 CA Triton_Mar 22_compressed.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Mar 22_compressed.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Mar22.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Triton_Eng Certificate_Dec21.pdf6 Jan 2022
CERSAI detailsFile: CERSAI Declaration_Triton_Dec21_compressed.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Arch Certificate_Triton_Dec 21_compressed.pdf5 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_Triton_Dec 21_compressed.pdf5 Jan 2022
Layout approvalFile: 2275067Amendletter_signed.pdf4 Jan 2022
Copy of Layout Approval (in case of layout)File: 2275067Amendletter_signed.pdf4 Jan 2022
Declaration about Commencement CertificateFile: Form D_Declaration about CC_Dec21.pdf4 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: 2307015_FurtherCC_signed.pdf3 Jan 2022
PAN CardFile: Pan Card Jade.PDF30 Sep 2021
Proforma of Allotment letterFile: RERA Sale Agreement_JCPL_FINAL RERA.pdf23 Sep 2021
Declaration about Commencement CertificateFile: Form D_Declaration about Commencement Certificate.pdf22 Sep 2021
Copy of the legal title reportFile: Title - RERA Format_compressed.pdf20 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20210916_CA certificate_New Project_compressed.pdf17 Sep 2021
Building plan approvalFile: Building Plan_compressed.pdf15 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_compressed.pdf15 Sep 2021
Declaration in FORM BFile: FORM -B_compressed.pdf15 Sep 2021
Details of encumbrancesFile: Self Declaration for Encumbrances.pdf13 Sep 2021
Layout approvalFile: 2275532_IOD_signed.pdf11 Sep 2021
Copy of Layout Approval (in case of layout)File: 2275532_IOD_signed.pdf11 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: 2287492_FirstCC_signed.pdf11 Sep 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRITON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ WEST6,700+ in Mumbai Suburban

2 kmTRITONCompleted 108Lapsed / revoked 55Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 289 registered projects within 2 km.

Builder: Jade Constructions Private Limited

Jade Constructions Private Limited has 1 registration on MahaRERA, including TRITON. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if TRITON is delayed beyond 1 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRITON?

The registered promoter entity is Jade Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRITON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRITON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRITON?

The professionals named in the filing: Architect: ARK Reza Kabul Architect Pvt Ltd; Engineer: Nexus Project Solutions Pvt. Ltd; Chartered Accountant: SURAJ SHETTY & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRITON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRITON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRITON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.