TRILOK PARK

By RAJESH TRILOKCHAND CHOPRA

RG-MH-52701 · RERA P51800033509 · Last updated on MahaRERA portal: 17 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
25 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 85%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

TRILOK PARK is a Residential / Group Housing project by RAJESH TRILOKCHAND CHOPRA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033509 on 22 Feb 2022. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameTRILOK PARK
  • TypeResidential / Group Housing
  • Location
    • JAMNADAS ADUKIA ROAD
    • KANDIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800033509
  • ReraGenie IDRG-MH-52701

Builder

  • NameRAJESH TRILOKCHAND CHOPRA
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredFeb 2022First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Feb 2022
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2024)
  • Buildings3 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA140000
WING BNA140000
WING CNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 85%.

WING A77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered66
BuildingClosed/CoveredTotal
WING A2020
WING B2020
WING C2626

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,153 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8393.0
Proposed, not sanctioned6,393 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVEERA DESAI ANDHERI WEST

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
RAJESH TRILOKCHAND CHOPRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800024912Dec 2024 → Dec 2025

Reason as filed by the promoterDear Sir/Ma’am, I, Mr. Rajesh Trilokchand Chopra, hereby declare the following with respect to the project “Trilok Park” bearing registration number P51800033509 registered under MahaRERA We have applied for an extension of the project completion date and have obtained consents from 54.67% of the allottees, in accordance with the requirements under MahaRERA provisions. Project Overview: The project comprises three wings - Wing A, Wing B, and Wing C. The current status of construction is as follows: • Wing A: Ground floor (Shops) - Construction completed, minor miscellaneous works pending. • Wi

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: Litigation Nil.pdf17 Apr 2025
Declaration in FORM BFile: Form B.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtech-Sep-2024.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtech-Sep-2024.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch-March 2025.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 Q2.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-3-Dec-24.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-3-March-25.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 for March 2025.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 for December 2024.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf17 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf17 Apr 2025
Details of encumbrances concerned to LegalFile: Litigation Nil.pdf17 Apr 2025
Other - TechnicalFile: CPM.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 F Y 22-23.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf17 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: new cc --3-3-2025.pdf3 Mar 2025
Building plan approvalFile: Amended-IOD (1).pdf26 Feb 2025
Building plan approvalFile: 1.pdf26 Feb 2025
Building plan approvalFile: 2.pdf26 Feb 2025
Building plan approvalFile: 3.pdf26 Feb 2025
Building plan approvalFile: 4.pdf26 Feb 2025
Building plan approvalFile: 5.pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended-IOD (1).pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf26 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Inv-31-03-2024_merged (2).pdf26 Dec 2024
CERSAI detailsFile: CERSAI_Search_Report_200333062246_For_Asset_Based_Search_26_12_2024_17_02_24_588.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Form-3_compressed.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate-Form-2-1-4.pdf24 Dec 2024
Other - TechnicalFile: 2393480_OC_signed.pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Certificate-Form-2-5-6.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA-Form 5_compressed.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold TP.pdf6 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC -15-06-2023.pdf16 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Annexure 2a.pdf9 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Inventoryrd.pdf9 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificatef.pdf9 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold RD.pdf28 Jan 2023
Disclosure of sold/ booked inventoryFile: Unsoldrr.pdf28 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 230128115627.pdf28 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf6 Sep 2022
Building plan approvalFile: iod f.pdf16 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: iod f.pdf16 Feb 2022
Declaration about Commencement CertificateFile: Form-D.pdf16 Feb 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER (1).pdf16 Feb 2022
Copy of the legal title reportFile: final title.pdf9 Feb 2022
Details of encumbrancesFile: Encumbrance.pdf9 Feb 2022
Layout approvalFile: IOD issue Plan -10-12-2021F.pdf7 Feb 2022
Copy of Layout Approval (in case of layout)File: IOD issue Plan -10-12-2021F.pdf7 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: CC F.pdf7 Feb 2022
Declaration in FORM BFile: Form-B_final.pdf7 Feb 2022
CERSAI detailsFile: Encumbrance.pdf7 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf7 Feb 2022
Proforma of Allotment letterFile: afsf.pdf7 Feb 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationStatusPromisedDelivered
TrilokmaladCompletedFeb 2015Late, Feb 2016

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRILOK PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI WEST6,700+ in Mumbai Suburban

2 kmTRILOK PARKCompleted 155Lapsed / revoked 101Other 158Dot size: filed unitsN

Filed coordinates, straight-line distance. 414 registered projects within 2 km.

Builder: RAJESH TRILOKCHAND CHOPRA

RAJESH TRILOKCHAND CHOPRA has 1 registration on MahaRERA, including TRILOK PARK. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that TRILOK PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if TRILOK PARK is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRILOK PARK?

The registered promoter entity is RAJESH TRILOKCHAND CHOPRA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRILOK PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRILOK PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in TRILOK PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRILOK PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRILOK PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.