Home / Browse projects / Mumbai Suburban, Maharashtra / TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED

Registered Litigation declared Others project

TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED

By Trilogy Infra Private Limited

RG-MH-30974 · RERA P51800079308 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 9 cases
  • 3 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
3Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED is a Others project by Trilogy Infra Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079308 on 28 Feb 2025. Possession is promised by 31 Dec 2027. 3 complaints are on record with the regulator.

At a glance

Project

  • NameTRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED
  • TypeOthers
  • Location
    • SHIMPOLI ROAD
    • BORIVALI (WEST)
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079308
  • ReraGenie IDRG-MH-30974

Builder

  • NameTrilogy Infra Private Limited
  • Entity typeCompany

Key dates

this monthRegisteredFeb 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Feb 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETYNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area740 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
OM VITHAL CO-OP HOUSING SOCIETY LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2397.0
Proposed, not sanctioned1,084 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANEK SMRUTI,TPS II,NEHRU ROAD,VILE PARLE - EASTMUMBAIMAHARASHTRA400 057

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeodhar Associates (Ms. Saloni Deodhar)
EngineerAce Project Consultancy Anand Sharma
EngineerChandan Bhangale
Chartered AccountantM/S. C P CHECHANI & ASSOCIATES Ashutosh Somani
Chartered AccountantS P K G & CO LLP
Chartered AccountantS P K G AND CO LLP
Chartered AccountantSSRV & ASSOCIATES
PartnerRole in project
Trilogy Infra Private Limited-

Litigation declared9

CaseCourtStatus
238/2022Bombay High CourtDisposed off or Decreed by filing Consent Terms
2281/2023Bombay High CourtInterim Application was dismissed by the order Twenty Third January Twenty Twenty Three
61/2023Bombay High CourtAppeal and IA were both dismissed by the order Sixth February Twenty Twenty Three
6994/2023Supreme Court of IndiaSLP dismissed by an order dated First May Twenty Twenty Three
934/2023Dindoshi CourtPending in Cr no Four Written statement and application order seven rule eleven for rejection filed
935/2023Dindoshi CourtPending in Cr no Four Written statement and application order seven rule eleven for rejection filed
936/2023Dindoshi CourtPending in Cr no Four Written statement and application order seven rule eleven for rejection filed
937/2023Dindoshi CourtPending in Cr no Four Written statement and application order seven rule eleven for rejection filed
CC006000000334066/2023RERA COMPLAINTPending Conciliation attempt failed and now matter is referred to RERA for hearing on merits

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12502104Tejas Jashwantlal ShahTrilogy Infra Private Limited26/06/2025
CC12502135Anita Vikas RathodTrilogy Infra Private Limited28/06/2025
CC12502207New Kamlesh JewellersTrilogy Infra Private Limited03/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1-Architect Certificate-Om Vitthal - 16 April 26.pdf7 May 2026
Form 2File: Form 2_As on 31st Mar 26_With SD.pdf7 May 2026
Form 3File: Sd_Sd_OV - Form 3 Q4 F Y 25-26.pdf7 May 2026
Disclosure of Sold and Booked InventoryFile: Sd_Disclosure of Inventory-DESKTOP-7OSO7GE.pdf7 May 2026
Form 1File: Form 1-Architect Certificate-Om Vitthal_31 December 25 (with SD).pdf20 Feb 2026
Form 2File: Form 2_As on 31st Dec 25_With SD.pdf20 Feb 2026
Form 3File: OV - Form 3 Q3 F Y 25-26 (With YG SD) _SD_compressed.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory_(With YG SD).pdf20 Feb 2026
Form 1File: Form 1-Architect Certificate - Om Vitthal - 30 September 25 (with sd).pdf27 Oct 2025
Form 2File: Form 2 - As on 30th Sept 25 (signed by Yash Ji).pdf27 Oct 2025
Form 3File: OV Form 3.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: OV Inventory Adobe Scan 20 Oct 2025 (2).pdf27 Oct 2025
Form 2A (FY 2024-2025)File: FROM-2A . O V_sd.pdf9 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 F Y 24-25 TV_sd.pdf25 Sep 2025
Form 1File: Form 1-Architect Certificate-Om Vitthal - 30th June 2025 (signed by Yash Ji) (1).pdf28 Jul 2025
Form 2File: Form 2 - As on 30th June 25 (signed by Yash Ji).pdf28 Jul 2025
Form 3File: TV - Form 3 Q1 F Y 25-26_sd_sd_compressed.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory_sd.pdf28 Jul 2025
Form 1File: Form 1-Architect Certificate-Om Vitthal - 31st March 2025.pdf31 May 2025
Form 2File: Form 2 - Engineer Certificate With YG Signature (R).pdf31 May 2025
Form 3File: TV - Form 3 Q4 F Y 24-25_SD (With Yash Sir sign)_compressed.pdf31 May 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf18 Feb 2025
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf18 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: 2460680_FurtherCC_signed.pdf6 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Approved Revalidation up to 04 11 2025.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf31 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: TIPL Format B.pdf31 Dec 2024
Other - FinanceFile: Om Vithal - Value of Land NIL letter.pdf19 Dec 2024
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf9 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Report to Allotment letter.pdf9 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement 1.pdf9 Dec 2024
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf9 Dec 2024
Layout approvalFile: Layout Approval 1.pdf4 Dec 2024
Layout approvalFile: Layout Approval 2.pdf4 Dec 2024
Layout approvalFile: Layout Approval 3.pdf4 Dec 2024
Layout approvalFile: Layout Approval 4.pdf4 Dec 2024
Layout approvalFile: Layout Approval 5.pdf4 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Approval 1.pdf4 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Approval 2.pdf4 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Approval 3.pdf4 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Approval 4.pdf4 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Approval 5.pdf4 Dec 2024
CERSAI detailsFile: Om Vithal - No security Interest created letter.pdf4 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format -A.pdf4 Dec 2024
Other - TechnicalFile: Declaration Cum Undertaking (Annexure A) - Other technical.pdf4 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf4 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured-unsecured finance availed for the project.pdf21 Nov 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf20 Nov 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf20 Nov 2024
Building plan approvalFile: IOD and Plan stands cancelled.pdf19 Nov 2024
PAN CardFile: Developer TIPL PAN.pdf19 Nov 2024
Copy of the legal title reportFile: Copy of Legal Title Report.pdf19 Nov 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf19 Nov 2024
Declaration in FORM BFile: Declaration in FORM B.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate.pdf19 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Valid Commencement Certificates Further CC.pdf19 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Valid Commencement Certificates Revalidation.pdf19 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Valid Commencement Certificates 4TH FLOOR.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD and Plan stands cancelled.pdf19 Nov 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf19 Nov 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf19 Nov 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI (WEST)6,700+ in Mumbai Suburban

2 kmTRILOGY VITHAL CO-OPERATCompleted 159Lapsed / revoked 94Other 204Dot size: filed unitsN

Filed coordinates, straight-line distance. 457 registered projects within 2 km.

Builder: Trilogy Infra Private Limited

Trilogy Infra Private Limited has 1 registration on MahaRERA, including TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?

The registered promoter entity is Trilogy Infra Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?

The professionals named in the filing: Architect: Deodhar Associates (Ms. Saloni Deodhar); Engineer: Ace Project Consultancy Anand Sharma; Engineer: Chandan Bhangale; Chartered Accountant: M/S. C P CHECHANI & ASSOCIATES Ashutosh Somani; Chartered Accountant: S P K G & CO LLP; Chartered Accountant: S P K G AND CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.