Home / Browse projects / Mumbai Suburban, Maharashtra / TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED
TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED
By Trilogy Infra Private Limited
RG-MH-30974 · RERA P51800079308 · Last updated on MahaRERA portal: 7 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 9 cases
- 3 complaints at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED is a Others project by Trilogy Infra Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079308 on 28 Feb 2025. Possession is promised by 31 Dec 2027. 3 complaints are on record with the regulator.
At a glance
Project
- NameTRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED
- TypeOthers
- Location
- SHIMPOLI ROAD
- BORIVALI (WEST)
- Borivali
- Mumbai Suburban
- 400092
- Pincode400092
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800079308
- ReraGenie IDRG-MH-30974
Builder
- NameTrilogy Infra Private Limited
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Feb 2025
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.
TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY: 40% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed32
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| OM VITHAL CO-OP HOUSING SOCIETY LIMITED | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Deodhar Associates (Ms. Saloni Deodhar) |
| Engineer | Ace Project Consultancy Anand Sharma |
| Engineer | Chandan Bhangale |
| Chartered Accountant | M/S. C P CHECHANI & ASSOCIATES Ashutosh Somani |
| Chartered Accountant | S P K G & CO LLP |
| Chartered Accountant | S P K G AND CO LLP |
| Chartered Accountant | SSRV & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Trilogy Infra Private Limited | - |
Litigation declared9
| Case | Court | Status |
|---|---|---|
| 238/2022 | Bombay High Court | Disposed off or Decreed by filing Consent Terms |
| 2281/2023 | Bombay High Court | Interim Application was dismissed by the order Twenty Third January Twenty Twenty Three |
| 61/2023 | Bombay High Court | Appeal and IA were both dismissed by the order Sixth February Twenty Twenty Three |
| 6994/2023 | Supreme Court of India | SLP dismissed by an order dated First May Twenty Twenty Three |
| 934/2023 | Dindoshi Court | Pending in Cr no Four Written statement and application order seven rule eleven for rejection filed |
| 935/2023 | Dindoshi Court | Pending in Cr no Four Written statement and application order seven rule eleven for rejection filed |
| 936/2023 | Dindoshi Court | Pending in Cr no Four Written statement and application order seven rule eleven for rejection filed |
| 937/2023 | Dindoshi Court | Pending in Cr no Four Written statement and application order seven rule eleven for rejection filed |
| CC006000000334066/2023 | RERA COMPLAINT | Pending Conciliation attempt failed and now matter is referred to RERA for hearing on merits |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502104 | Tejas Jashwantlal Shah | Trilogy Infra Private Limited | 26/06/2025 |
| CC12502135 | Anita Vikas Rathod | Trilogy Infra Private Limited | 28/06/2025 |
| CC12502207 | New Kamlesh Jewellers | Trilogy Infra Private Limited | 03/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1-Architect Certificate-Om Vitthal - 16 April 26.pdf | 7 May 2026 |
| Form 2File: Form 2_As on 31st Mar 26_With SD.pdf | 7 May 2026 |
| Form 3File: Sd_Sd_OV - Form 3 Q4 F Y 25-26.pdf | 7 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sd_Disclosure of Inventory-DESKTOP-7OSO7GE.pdf | 7 May 2026 |
| Form 1File: Form 1-Architect Certificate-Om Vitthal_31 December 25 (with SD).pdf | 20 Feb 2026 |
| Form 2File: Form 2_As on 31st Dec 25_With SD.pdf | 20 Feb 2026 |
| Form 3File: OV - Form 3 Q3 F Y 25-26 (With YG SD) _SD_compressed.pdf | 20 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory_(With YG SD).pdf | 20 Feb 2026 |
| Form 1File: Form 1-Architect Certificate - Om Vitthal - 30 September 25 (with sd).pdf | 27 Oct 2025 |
| Form 2File: Form 2 - As on 30th Sept 25 (signed by Yash Ji).pdf | 27 Oct 2025 |
| Form 3File: OV Form 3.pdf | 27 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: OV Inventory Adobe Scan 20 Oct 2025 (2).pdf | 27 Oct 2025 |
| Form 2A (FY 2024-2025)File: FROM-2A . O V_sd.pdf | 9 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 F Y 24-25 TV_sd.pdf | 25 Sep 2025 |
| Form 1File: Form 1-Architect Certificate-Om Vitthal - 30th June 2025 (signed by Yash Ji) (1).pdf | 28 Jul 2025 |
| Form 2File: Form 2 - As on 30th June 25 (signed by Yash Ji).pdf | 28 Jul 2025 |
| Form 3File: TV - Form 3 Q1 F Y 25-26_sd_sd_compressed.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory_sd.pdf | 28 Jul 2025 |
| Form 1File: Form 1-Architect Certificate-Om Vitthal - 31st March 2025.pdf | 31 May 2025 |
| Form 2File: Form 2 - Engineer Certificate With YG Signature (R).pdf | 31 May 2025 |
| Form 3File: TV - Form 3 Q4 F Y 24-25_SD (With Yash Sir sign)_compressed.pdf | 31 May 2025 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 18 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 18 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2460680_FurtherCC_signed.pdf | 6 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Approved Revalidation up to 04 11 2025.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 31 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: TIPL Format B.pdf | 31 Dec 2024 |
| Other - FinanceFile: Om Vithal - Value of Land NIL letter.pdf | 19 Dec 2024 |
| Proforma of Allotment letterFile: Proforma of Allotment letter.pdf | 9 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report to Allotment letter.pdf | 9 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement 1.pdf | 9 Dec 2024 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf | 9 Dec 2024 |
| Layout approvalFile: Layout Approval 1.pdf | 4 Dec 2024 |
| Layout approvalFile: Layout Approval 2.pdf | 4 Dec 2024 |
| Layout approvalFile: Layout Approval 3.pdf | 4 Dec 2024 |
| Layout approvalFile: Layout Approval 4.pdf | 4 Dec 2024 |
| Layout approvalFile: Layout Approval 5.pdf | 4 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval 1.pdf | 4 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval 2.pdf | 4 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval 3.pdf | 4 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval 4.pdf | 4 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval 5.pdf | 4 Dec 2024 |
| CERSAI detailsFile: Om Vithal - No security Interest created letter.pdf | 4 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format -A.pdf | 4 Dec 2024 |
| Other - TechnicalFile: Declaration Cum Undertaking (Annexure A) - Other technical.pdf | 4 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 4 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured-unsecured finance availed for the project.pdf | 21 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf | 20 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf | 20 Nov 2024 |
| Building plan approvalFile: IOD and Plan stands cancelled.pdf | 19 Nov 2024 |
| PAN CardFile: Developer TIPL PAN.pdf | 19 Nov 2024 |
| Copy of the legal title reportFile: Copy of Legal Title Report.pdf | 19 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 19 Nov 2024 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate.pdf | 19 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate.pdf | 19 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Valid Commencement Certificates Further CC.pdf | 19 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Valid Commencement Certificates Revalidation.pdf | 19 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Valid Commencement Certificates 4TH FLOOR.pdf | 19 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD and Plan stands cancelled.pdf | 19 Nov 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 19 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 19 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI (WEST)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 457 registered projects within 2 km.
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: Trilogy Infra Private Limited
Trilogy Infra Private Limited has 1 registration on MahaRERA, including TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?
The registered promoter entity is Trilogy Infra Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?
The professionals named in the filing: Architect: Deodhar Associates (Ms. Saloni Deodhar); Engineer: Ace Project Consultancy Anand Sharma; Engineer: Chandan Bhangale; Chartered Accountant: M/S. C P CHECHANI & ASSOCIATES Ashutosh Somani; Chartered Accountant: S P K G & CO LLP; Chartered Accountant: S P K G AND CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback