Home / Browse projects / Raigarh, Maharashtra / TRICITY EROS

Completed No litigation declared Others project

TRICITY EROS

By TRICITY REALTY LLP

RG-MH-02984 · RERA P52000020294 · Last updated on MahaRERA portal: 3 Aug 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Stilt Floor, 90%
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

TRICITY EROS is a Others project by TRICITY REALTY LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000020294 on 2 Apr 2019. The registration is recorded completed; possession was promised by 30 Sep 2024.

At a glance

Project

  • NameTRICITY EROS
  • TypeOthers
  • Location
    • NEAR D MART
    • NAVI MUMBAI
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • RERA no.P52000020294
  • ReraGenie IDRG-MH-02984

Builder

  • NameTRICITY REALTY LLP
  • Entity typePartnership
  • PartnersKULBIR REKHI, MANISH PARDASANI, SAVINDER LAMBA, HARVINDER LAMBA, MOKSH PARDASANI, ANGAD REKHI
  • Other registrations13 more →
  • Completed6 of 14
  • Declared earlier projects14 →

Key dates

this monthRegisteredApr 2019PromisedSep 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Apr 2019
  • Promised completion30 Sep 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed117 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TRICITY EROSNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

TRICITY EROS: 99% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities18

As on 3 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
SWIMMING POOLYes0%
SOCIETY OFFICEYes0%
GYMNASIUMYes0%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered58

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,068 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3102.4
Proposed, not sanctioned3,102 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEDEN PALACE, PLOT NO 16, SECTOR 16A, PALM BEACH ROAD, NAVI MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE FIRM
EngineerSANJAYBHAI NATHBHAI PATEL
Chartered AccountantVIKAS KAMRA & CO
PartnerRole in project
TRICITY REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Aug 2024

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eros Engineers Cetificate.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: ER Disclosure Of Sold And Booked Inventory.pdf3 Aug 2024
Certificates of CA (Form 3)File: ER CA Certificate.pdf3 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf3 Aug 2024
Architect’s Certificate on Completion of Project (Form 4)File: Eros Arch Certificate form 4.pdf3 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 eros.pdf22 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tricity Eros.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A up to March 2024 Eros.pdf10 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf30 Apr 2024
Certificates of CA (Form 3)File: CA Certificate.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ER Architects Certificate.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate EROS.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: ER Disclosure Of Sold.pdf24 Jan 2024
Certificates of CA (Form 3)File: CA Certificate.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Tricity Eros till March 23.pdf1 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eros Q2 Arch cert.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Eros.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Booked inventory Tricity Eros.pdf19 Oct 2023
Certificates of CA (Form 3)File: CA Certificate.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Eros.pdf7 Sep 2023
Copy of the legal title reportFile: Search title search report.pdf28 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf20 Jul 2023
Layout approvalFile: Ground Floor approved plan.pdf10 Jul 2023
Layout approvalFile: Approved plan.pdf10 Jul 2023
Layout approvalFile: Approved plan 1.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Ground Floor approved plan.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Approved plan.pdf10 Jul 2023
Copy of Layout Approval (in case of layout)File: Approved plan 1.pdf10 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC copy.pdf10 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Ground Floor approved plan.pdf10 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Form 2A 31 03 2023.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert Eros.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Eros.pdf27 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure Tricity Eros.pdf27 Apr 2023
Certificates of CA (Form 3)File: Chartered Accountants Tricity Eros.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Eros.pdf27 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - EROS.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - EROS.pdf19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate Eros.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers cert Eros.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold Eros.pdf17 Jan 2023
Certificates of CA (Form 3)File: CA cert Eros.pdf17 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Eros.pdf6 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eros Architect Certificate.pdf5 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eros Engineer Certificate.pdf5 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold Eros.pdf5 Nov 2022
Certificates of CA (Form 3)File: Eros CA Certificate.pdf5 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Apr 20 to March 21 Eros.pdf22 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf20 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cert.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventry.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclouser of sold Inventory.pdf20 Jul 2022
Certificates of CA (Form 3)File: CA Certificate.pdf20 Jul 2022
Certificates of CA (Form 3)File: CA Certificate.pdf20 Jul 2022
Certificates of CA (Form 3)File: CA Certificate.pdf21 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certifcate.pdf28 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf26 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf26 Nov 2021
Certificates of CA (Form 3)File: CA Certificate.pdf26 Nov 2021
Certificates of CA (Form 3)File: CA Certificate.pdf30 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf28 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf4 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf23 Apr 2021
Disclosure of sold/ booked inventoryFile: Disclouser of sold or Booked Inventory.pdf23 Apr 2021
Certificates of CA (Form 3)File: CA certificate Eros.pdf23 Apr 2021
Layout approvalFile: CC plans.pdf24 Mar 2021
Copy of Layout Approval (in case of layout)File: CC plans.pdf24 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit report Form 5 Eros.pdf3 Mar 2021
Certificates of CA (Form 3)File: CA Certificate.pdf4 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf30 Jan 2021
Certificates of CA (Form 3)File: CA Certificate.pdf2 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Oct 2020

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
TRICITY PRISTINEKOPRA KHARGHAR1CompletedDec 2017Jul 2015
TRICITY ENCLAVEULWE1CompletedDec 2017Mar 2016
TRICITY SKYLINESANPADA1CompletedJul 2017Mar 2016
TRICITY SKYULWE1CompletedMay 2014Oct 2013
TRICITY PEARLULWE2CompletedMay 2014Late, Jul 2014

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRICITY EROS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI MUMBAI5,900+ in Raigarh

Builder: TRICITY REALTY LLP

TRICITY REALTY LLP has 14 registrations on MahaRERA, including TRICITY PALACIO and TRICITY PANACHE. Its filings disclose 14 earlier MahaRERA projects: declares 12 of 14 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if TRICITY EROS is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRICITY EROS?

The registered promoter entity is TRICITY REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRICITY EROS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRICITY EROS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRICITY EROS?

The professionals named in the filing: Architect: THE FIRM; Engineer: SANJAYBHAI NATHBHAI PATEL; Chartered Accountant: VIKAS KAMRA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRICITY EROS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRICITY EROS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRICITY EROS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.