Home / Browse projects / Raigarh, Maharashtra / Tricity Bayview
Tricity Bayview
RG-MH-39500 · RERA P52000054513 · Last updated on MahaRERA portal: 17 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
- Rs 15.00 crore secured on the land, in favour of ADITYA BIRLA CAPITAL LIMITED
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tricity Bayview is a Others project by TRICITY REALTY LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000054513 on 25 Jan 2024. Possession is promised by 31 Dec 2029. The completion date has moved by 24 months from the original filing. 104 of the 108 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameTricity Bayview
- TypeOthers
- Location
- Kalamoli
- Roadpali
- Navi Mumbai
- Kalamboli
- Panvel
- Raigarh
- 410218
- Pincode410218
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000054513
- ReraGenie IDRG-MH-39500
Builder
- NameTRICITY REALTY LLP
- Entity typeOthers
- Designated PartnersKULBIR SINGH REKHI Dayal singh Rekhi, Manish Shrichand Paradasani Shrichand Pardasani, SAVINDER SINGH LAMBA Lamba, HARVINDER SINGH LAMBA Lamba, MOKSH SHRICHAND PARADASANI Shrichand Pardasani, ANGAD REKHI Rekhi, ARJUN REKHI Rekhi
- Other registrations13 more →
- Completed6 of 14
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jan 2024
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2027)
- Buildings1 building record
- Documents filed113 files
Current status
Figures as on 17 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tricity Bayview | NA | 12 | 12 | 93 | 15 | 108 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 91%.
Tricity Bayview: 68% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 56% |
| Sanitary Fittings within the flats / premises | 91% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 53% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 24% |
Progress on shared amenities15
As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed87
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tricity Bayview | NA | Rs 40.00 cr | Rs 17.26 cr |
| - | NA | Rs 4.08 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Atul Patel Architects |
| Engineer | CSC Consultants |
| Engineer | Mayuri Popat Mane |
| Chartered Accountant | Vikas Kamra & Co |
| Chartered Accountant | Umesh Aswani & co |
| Chartered Accountant | MANISHA GELARAM GERELLA |
| Partner | Role in project |
|---|---|
| TRICITY REALTY LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed113
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 17 Jun 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 17 Jun 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: 4 Form 1 Tricity Bayview 31122025 ok.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: 5 Form 2 Tricity Bayview 31122025 ok.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: 5 Withdrawal Application Form3 Bayview ok.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Bayview 30092025.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Bayview 30092025.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Bayview 30092025 final.pdf | 8 Jan 2026 |
| Form 1File: 1 Form 1 31032024.pdf | 5 Sep 2025 |
| Form 2File: 1 Form 2 31032024.pdf | 5 Sep 2025 |
| Form 3File: 1 Form 3 31032024.pdf | 5 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 Disclosure Sold Unsold 31032024.pdf | 5 Sep 2025 |
| Form 1File: 2 Form 1 30062024.pdf | 5 Sep 2025 |
| Form 2File: 2 Form 2 30062024.pdf | 5 Sep 2025 |
| Form 3File: 2 Form 3 30062024.pdf | 5 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure Sold Unsold 30062024.pdf | 5 Sep 2025 |
| Form 1File: 3 Form 1 30092024.pdf | 5 Sep 2025 |
| Form 2File: 3 Form 2 30092024.pdf | 5 Sep 2025 |
| Form 3File: 3 Form 3 30092024.pdf | 5 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure Sold Unsold 30092024.pdf | 5 Sep 2025 |
| Form 1File: 4 Form 1 31122024.pdf | 5 Sep 2025 |
| Form 2File: 4 Form 2 31122024.pdf | 5 Sep 2025 |
| Form 3File: 4 Form 3 31122024.pdf | 5 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Disclosure Sold Unsold 31122024.pdf | 5 Sep 2025 |
| Form 1File: 5 Form 1 31032025.pdf | 5 Sep 2025 |
| Form 2File: 5 Form 2 31032025.pdf | 5 Sep 2025 |
| Form 3File: 5 Form 3 31032025.pdf | 5 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure Sold Unsold 31032025.pdf | 5 Sep 2025 |
| Form 1File: Form 1 BV 30062025.pdf | 5 Sep 2025 |
| Form 2File: Form 2 BV 30062025.pdf | 5 Sep 2025 |
| Form 3File: form 3 BV 30062025 final.pdf | 5 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold BV 30062025.pdf | 5 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert.pdf | 4 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Q4 FY 24-25 bayview.pdf | 4 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Cert Q4 FY 24-25 bayview.pdf | 4 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Q4 FY 24-25 bayviev.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 1 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tricity Bayview Architects Certificate.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bayview CA Cert.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tricity Bayview Engineers'S Certificate_0001.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: tricity Bayview Disclosure of Sold.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Bayview.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Tricity Bayview.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Tricity Bayview Disclosure Of Sold Booked Inventory.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bayview Architects Certificate.pdf | 3 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bayview Engineers Cetificate.pdf | 3 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: BV Disclosure Of Sold And Booked Inventory.pdf | 3 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BV CA Certificate.pdf | 3 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 bayview.pdf | 22 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tricity Bayview.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A up to March 2024 Bayview.pdf | 10 Jun 2024 |
| Building plan approvalFile: Plan 1 Ground floor.pdf | 16 May 2024 |
| Building plan approvalFile: Plan 2nd.pdf | 16 May 2024 |
| Building plan approvalFile: Plan 3rd.pdf | 16 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1 Ground floor.pdf | 16 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2nd.pdf | 16 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3rd.pdf | 16 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC copy G 13.pdf | 16 May 2024 |
| Declaration about Commencement CertificateFile: 16 05 2024 CC Declaration G 13.pdf | 16 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 30 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 30 Apr 2024 |
| Building plan approvalFile: HPSC0763_11zon.pdf | 6 Apr 2024 |
| Building plan approvalFile: HPSC0764_11zon.pdf | 6 Apr 2024 |
| Building plan approvalFile: HPSC0765_11zon.pdf | 6 Apr 2024 |
| Building plan approvalFile: HPSC0766_11zon.pdf | 6 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0763_11zon.pdf | 6 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0764_11zon.pdf | 6 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0765_11zon.pdf | 6 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0766_11zon.pdf | 6 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 200224 CC copy.pdf | 6 Apr 2024 |
| Other - TechnicalFile: CC Verification G Plus 6.pdf | 6 Apr 2024 |
| Other - TechnicalFile: 1 Other - Technical (6).pdf | 18 Jan 2024 |
| Other - TechnicalFile: CC Verification- Tricity Bayview.pdf | 16 Jan 2024 |
| CERSAI detailsFile: 1 CERSAI details (19).pdf | 12 Jan 2024 |
| Other - LegalFile: Partnership Deed_11zon.pdf | 11 Jan 2024 |
| Other - LegalFile: Supplemetal Agreement.pdf | 11 Jan 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| TRICITY LUXURIA | PLOT NO 104 SECTOR 17 NEW PANVEL WEST | 158 | Completed | Sep 2023 | Jul 2021 |
| TRICITY PROMENADE | PLOT NO 20A SECTOR 38 NERUL NAVI MUMBAI | 69 | Completed | Sep 2022 | Oct 2019 |
| TRICITY PANACHE | PLOT NO 7 SECTOR 38 NERUL NAVI MUBAI | 64 | Completed | Sep 2022 | Sep 2019 |
| TRICITY PALACIO | PLOT NO 5 SECTOR 38 NERUL NAVI MUMBAI | 52 | Completed | Sep 2022 | Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 13 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 113 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Tricity Bayview on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Navi Mumbai5,900+ in Raigarh
Filed coordinates, straight-line distance. 75 registered projects within 2 km.
Plot No -77 Sector -17 Kalamboli Bus Depot
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
BHAVESHWAR AQUA - 1
BHAVESHWAR INFRATECH
ETERNIA
GREENSCAPE DEVELOPERS PRIVATE LIMITED
MONARCH BROOKEFIELDS
MONARCH BROOKEFIELDS LLP
BHAVESHWAR AQUA - 2
BHAVESHWAR INFRATECH
OM REGENCY
OSCAR INFRASTRUCTURE PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: TRICITY REALTY LLP
TRICITY REALTY LLP has 14 registrations on MahaRERA, including TRICITY PALACIO and TRICITY PANACHE. Its filings disclose 14 earlier MahaRERA projects: declares 12 of 14 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Tricity Bayview is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tricity Bayview?
The registered promoter entity is TRICITY REALTY LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tricity Bayview?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Tricity Bayview?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tricity Bayview?
The professionals named in the filing: Architect: Atul Patel Architects; Engineer: CSC Consultants; Engineer: Mayuri Popat Mane; Chartered Accountant: Vikas Kamra & Co; Chartered Accountant: Umesh Aswani & co; Chartered Accountant: MANISHA GELARAM GERELLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tricity Bayview?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback