Registered Litigation declared Residential / Group Housing project

ETERNIA

By GREENSCAPE DEVELOPERS PRIVATE LIMITED

RG-MH-25000 · RERA P52000011766 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 39 months
  • 3 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 39 months from the original
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
143 of 284Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 172 documents Report an error

ETERNIA is a Residential / Group Housing project by GREENSCAPE DEVELOPERS PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000011766 on 31 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 39 months from the original filing. 141 of the 284 units on this registration are recorded sold or booked, and 50 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameETERNIA
  • TypeResidential / Group Housing
  • Location
    • 20 MTR WIDE ROAD
    • POLICE HEAD QUTER
    • Rodpali
    • Panvel
    • Raigarh
    • 410218
  • Pincode410218
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000011766
  • ReraGenie IDRG-MH-25000

Builder

  • NameGREENSCAPE DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH2005PTC156919
  • GSTIN27AACCG4829L1ZA
  • DirectorsSuresh Ambavi Wavia, Jayesh Ambavi Vavia
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Dec 2023)
  • Buildings5 building records
  • Documents filed172 files

Current status

50%141 of 284 units booked
100.0%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ETERNIA WING ANA161553861
ETERNIA WING BNA161451556
ETERNIA WING CNA161450353
ETERNIA WING DNA161451758
ETERNIA WING ENA161553356

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

ETERNIA WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ETERNIA WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ETERNIA WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ETERNIA WING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ETERNIA WING E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
ETERNIA WING A11
ETERNIA WING B11
ETERNIA WING C11
ETERNIA WING D11
ETERNIA WING E11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,250 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024
LandownerVillageDistrict
ATMARAM NAMDEV PATILKalamboliRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI10874.32
Proposed, not sanctioned7,791 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPERSEPOLIS PREMISES CHS, PLOT-74, SECTOR-17, VASHI, NAVI MUMBAI-400705
Estimated costRs 39.84 cr
Cost incurredRs 39.84 cr
Work done100.0%
BuildingWingEstimatedIncurred
ETERNIA WING ANARs 7.97 crRs 7.97 cr
ETERNIA WING BNARs 7.97 crRs 7.97 cr
ETERNIA WING CNARs 7.97 crRs 7.97 cr
ETERNIA WING DNARs 7.97 crRs 7.97 cr
ETERNIA WING ENARs 7.97 crRs 7.97 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOYUZ TALIB ARCHITECTS PVT LTD
EngineerSTRUCTURAL CONCEPT DESIGNS PVT LTD
EngineerTejas Lagad
EngineerKunal Jadhav
Chartered AccountantKRUPA BALIA
Chartered AccountantS P V M & Co
PartnerRole in project
GREENSCAPE DEVELOPERS PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024582Dec 2023 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 54.29% allottees for purpose of extension of RERA registration period of the said project.

EXT52000027088Dec 2023 → Mar 2026

Reason as filed by the promoterI, hereby apply for extension as per Order No. 40 Dated 27/12/2022 of the registered project bearing vide no P52000011766.As per HEARING DATED 5th May 2025, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31/03/2026. The order is uploaded in Other Tab for your reference

EA17022619884Dec 2023 → Mar 2027

Reason as filed by the promoterThe Project has been executed strictly in accordance with the sanctioned plans dated 17/01/2019 up to the stage for which the Part Occupation Certificate (“Part OC”) for Ground + 12 Upper Floors out of 14 Upper Floors (for all the Buildings/Wings of the Project i.e., Wings A, B, C, D, and E) is applied for and duly submitted on 4th November 2024. We hereby state that the non-issuance of the Part OC/OC is not attributable to any act, omission, or default on our part, this is strictly beyond our control. The delay in issuance of the Part OC/OC is solely due to the pendency of our application bef

Litigation declared2

CaseCourtStatus
180/16/2016PANVELPENDING
180/16/2016District and Sessions Court, PanvelOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504635Atish Suresh WaghGREENSCAPE DEVELOPERS PRIVATE LIMITED26/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed172

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 172 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A - Eternia For 2024-25.pdf6 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Eternia For 2025-26.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1 Eternia as on march 2026.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 Eternia as on march 2026.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 Eternia as on march 2026_compressed (2).pdf21 May 2026
Withdrawal Update Form 1File: Form 1 Eternia as on march 2026_compressed.pdf14 May 2026
Withdrawal Update Form 2File: Form 2 Eternia as on march 2026.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 Eternia as on march 2026_compressed.pdf14 May 2026
Withdrawal Update Form 1File: Form 1 - Eternia as on Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Form 1 - Eternia as on Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 - Eternia as on Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 - Eternia as on Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3 - Eternia as on Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3 - Eternia as on Dec 2025.pdf17 Feb 2026
Withdrawal Update Form 1File: Form 1 - Eternia as on Sep 2025.pdf9 Jan 2026
Withdrawal Update Form 2File: Form 2 - Eternia as on Sep 2025.pdf9 Jan 2026
Withdrawal Update Form 3File: Form 3 - Eternia as on Sep 2025.pdf9 Jan 2026
Form 1File: Form 1 - Eternia as on June 2025.pdf9 Dec 2025
Form 2File: Form 2 - Eternia as on June 2025.pdf9 Dec 2025
Form 3File: Form 3 - Eternia as on June 2025.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Eternia as on June 2025.pdf9 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (Eternia) (Form 1) 31-03-2025_compressed.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf21 May 2025
Declaration in FORM BFile: Form B (Affidavit cum Declaration).pdf19 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Eternia as on December 2024.pdf29 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Eternia as on December 2024.pdf29 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Eternia as on December 2024.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Eternia as on Sept 2024.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-2024 Eternia.pdf9 Jan 2025
Declaration about Commencement CertificateFile: Annexure D.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf10 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank Letter.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_11zon.pdf10 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_11zon.pdf10 Oct 2024
Certificates of CA (Form 5)File: Form 5.pdf10 Oct 2024
Certificates of CA (Form 3)File: Form 3_11zon.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_11zon.pdf10 Oct 2024
Certificates of CA (Form 3)File: Form 3_11zon.pdf10 Oct 2024
Certificates of CA (Form 5)File: Form 5.pdf10 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_11zon.pdf10 Oct 2024
Declaration about Commencement CertificateFile: Annexure D.pdf10 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank Letter.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf10 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 30-06-2024.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- 30062024.PDF9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- 30062024.PDF9 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 30-06-2024.pdf9 Oct 2024
Certificates of CA (Form 3)File: final form 3 june 24 -Eternia_11zon (2).pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 eternia 22-23.pdf8 Oct 2024
Certificates of CA (Form 3)File: final form 3 june 24 -Eternia_11zon (2).pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 eternia 22-23.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold.pdf7 Oct 2024
Declaration in FORM BFile: Noatrised Form B (1).pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 30-06-19.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 30-06-19.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 30-06-20.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 30-06-21.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 30-06-23.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 30-06-24.pdf7 Oct 2024
CERSAI detailsFile: CERSAI CERTIFICATE (2).pdf7 Oct 2024
Declaration in FORM BFile: Noatrised Form B (1).pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 30-06-19.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 30-06-19.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 30-06-20.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold.pdf7 Oct 2024
CERSAI detailsFile: CERSAI CERTIFICATE (2).pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 30-06-21.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 30-06-23.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 30-06-24.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 - .pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 .pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 -.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 -.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 -.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 -.pdf12 Aug 2024
Certificates of CA (Form 3)File: final form 3_11zon.pdf12 Aug 2024
Certificates of CA (Form 3)File: FINLA FORM 3_11zon.pdf12 Aug 2024
Certificates of CA (Form 3)File: final form 3_11zon.pdf12 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CYBER ONEPLOT NO 4 AND 6 SECTOR 30A VASHI NAVI MUMBAI1CompletedJun 2013Jun 2013

How this compares with Raigarh

50%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 39 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ETERNIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near POLICE HEAD QUTER5,900+ in Raigarh

2 kmETERNIACompleted 60Lapsed / revoked 14Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 119 registered projects within 2 km.

Builder: GREENSCAPE DEVELOPERS PRIVATE LIMITED

GREENSCAPE DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including ETERNIA. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ETERNIA is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ETERNIA?

The registered promoter entity is GREENSCAPE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2005PTC156919 and GSTIN 27AACCG4829L1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ETERNIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ETERNIA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ETERNIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ETERNIA?

The professionals named in the filing: Architect: SOYUZ TALIB ARCHITECTS PVT LTD; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD; Engineer: Tejas Lagad; Engineer: Kunal Jadhav; Chartered Accountant: KRUPA BALIA; Chartered Accountant: S P V M & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ETERNIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ETERNIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ETERNIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.