Tricity Aura

By Tricity Realty LLP

RG-MH-07655 · RERA P52000055973 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 15.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 87%
8 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Tricity Aura is a Others project by Tricity Realty LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000055973 on 2 May 2024. Possession is promised by 31 Dec 2028. 70 of the 78 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameTricity Aura
  • TypeOthers
  • Location
    • Plot No. 10D
    • Sector- 16E
    • Kalamboli
    • Panvel
    • Raigarh
    • 410218
  • Pincode410218
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000055973
  • ReraGenie IDRG-MH-07655

Builder

  • NameTricity Realty LLP
  • Entity typeOthers
  • PartnerArjun Kulbir Singh Rekhi
  • Designated PartnersArjun Rekhi Rekhi, Angad Rekhi Rekhi, Harvinder singh Lamba Lamba, Kulbir Dayal Singh Rekhi Dayal singh Rekhi, Manish Srichand Pardasani Srichand Pardasani, Moksh Shrichand Pardasani Shrichand Pardasani, Savinder Singh Lamba Lamba
  • Other registrations13 more →
  • Completed6 of 14
  • Declared earlier projects14 →

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

90%70 of 78 units booked
50.5%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tricity AuraNA1616671178

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 87%.

Tricity Aura: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth60%
Stilt Floor50%
Slabs of Super Structure87%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered71
Open Space3

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,550 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on3 Sep 2025

Approvals and building plan

Sanctioning authorityPANVEL MUNCIPAL CORPORATION (PMC)
Permissible FSI9000.0
Proposed, not sanctioned5,232 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 2 and 3 Platinum Shree Chintamani Chs Sector 14 Plot No18 Sanpada Navi Mumbai Thane 400705
Estimated costRs 24.17 cr
Cost incurredRs 12.21 cr
Work done50.5%
BuildingWingEstimatedIncurred
Tricity AuraNARs 22.50 crRs 12.21 cr
-NARs 1.67 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Firm
EngineerM/s. G. A. Bhilare Consultants Pvt. Ltd.
EngineerMayuri Popat Mane
Chartered AccountantVikas Kamra & Co.
Chartered AccountantUmesh Aswani & co
Chartered AccountantMANISHA GELARAM GERELLA
PartnerRole in project
Tricity Realty LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf17 Jun 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf17 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf17 Jun 2026
Withdrawal Update Form 1File: 6 Form 1 Tricity Aura 31122025.pdf19 Feb 2026
Withdrawal Update Form 2File: 7 Form 2 Tricity Aura 31122025.pdf19 Feb 2026
Withdrawal Update Form 3File: 7 Withdrawal Application Form3 aura ok.pdf19 Feb 2026
Withdrawal Update Form 1File: Form 1 Aura 30092025.pdf8 Jan 2026
Withdrawal Update Form 2File: Form 2 Aura 30092025.pdf8 Jan 2026
Withdrawal Update Form 3File: Form 3 Aura 30092025 final.pdf8 Jan 2026
Form 1File: 1 form 1 30062024.pdf3 Sep 2025
Form 2File: 1 form 2 30062024.pdf3 Sep 2025
Form 3File: 1 form 3 30062024.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure sold unsold 30062024.pdf3 Sep 2025
Form 1File: 2 form 1 30092024.pdf3 Sep 2025
Form 2File: 2 form 2 30092024.pdf3 Sep 2025
Form 3File: 2 form 3 30092024.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure sold unsold 30092024.pdf3 Sep 2025
Form 1File: 3 form 1 31122024.pdf3 Sep 2025
Form 2File: 3 form 2 31122024.pdf3 Sep 2025
Form 3File: 3 form 3 31122024.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure sold unsold 31122024.pdf3 Sep 2025
Form 1File: 4 form 1 31032025.pdf3 Sep 2025
Form 2File: 4 form 2 31032025.pdf3 Sep 2025
Form 3File: 4 form 3 31032025.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure sold unsold 31032025.pdf3 Sep 2025
Form 1File: 1 Architects Certificate Aura_0001.pdf3 Sep 2025
Form 2File: 2 Engineers Certificate Aura.pdf3 Sep 2025
Form 3File: 3 form 3 AU 30062025 final.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4 Aura Disclosure Of Sold Booked Inventory_0001.pdf3 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tricity Aura.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Q4 FY 24-25 aura.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Cert Q4 FY 24-25 aura.pdf4 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Q4 FY 24-25 aura.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tricity Aura Architects Certificate.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura CA Cert.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tricity Aura Engineers'S Certificate.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: tricity Aura Disclosure of Sold.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tricity Aura Architects certificate.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Tricity Aura.pdf25 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Tricity Aura Disclosure Of Sold Booked Inventory.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aura Architects Certificate.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aura Engineers Cetificate.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Aura Disclosure Of Sold And Booked Inventory.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura CA Certificate.pdf3 Aug 2024
Proforma of Agreement for saleFile: AFS_Tricity Aura_Tricity Realty LLP_15042024.pdf20 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Aura Bank Account.pdf20 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification mail screenshot.pdf19 Apr 2024
Other - TechnicalFile: CC Verification mail screenshot.pdf19 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finance New.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance-Legal.pdf18 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter Finance New.pdf18 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance-Legal.pdf18 Apr 2024
CERSAI detailsFile: 1 CERSAI details (8).pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Tricity Aura updated 1.pdf18 Apr 2024
Proforma of Allotment letterFile: Allotment Letter_Tricity Aura_Tricity Realty LLP_15042024.pdf18 Apr 2024
Deviation Report with respect to Allotment letterFile: GetUserDocumentFileContent (3) (1).pdf18 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement Of Sale_11zon.pdf18 Apr 2024
Other - TechnicalFile: Annexure A - Order No50 (1).pdf18 Apr 2024
Copy of the legal title reportFile: RERA Format Title Report Kalamboli P 10D Sec 16E.pdf17 Apr 2024
Declaration about Commencement CertificateFile: Format D - Declaration of CC.pdf17 Apr 2024
Declaration in FORM BFile: Form B - Promoter.pdf17 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (2).pdf17 Apr 2024
Layout approvalFile: Approved Layout pg 1_11zon (1).pdf15 Apr 2024
Building plan approvalFile: Approved Layout pg 1_11zon (1).pdf15 Apr 2024
Building plan approvalFile: Approved Layout pg 2_11zon.pdf15 Apr 2024
Building plan approvalFile: Approved Layout pg 3_11zon.pdf15 Apr 2024
Copy of Layout Approval (in case of layout)File: Approved Layout pg 1_11zon (1).pdf15 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout pg 1_11zon (1).pdf15 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout pg 2_11zon.pdf15 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Layout pg 3_11zon.pdf15 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Apr 2024
Other - LegalFile: Lease deed- Kalamboli_11zon.pdf15 Mar 2024
Other - LegalFile: 1 Other - Legal.pdf15 Mar 2024
Other - LegalFile: 2 Other - Legal.pdf15 Mar 2024
PAN CardFile: PAN CARD TRICITY LLP.pdf17 Jan 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Tricity PromenadePlot No.20A Sector-38 Nerul Navi Mumbai-40070669CompletedSep 2023Oct 2019
Tricity PanachePlot No.7 Sector-38 Nerul Navi Mumbai-40070664CompletedSep 2023Sep 2019
Tricity PalacioPlot No. 5 Sector- 38 Nerul Navi Mumbai - 40070652CompletedSep 2023Oct 2019
Tricity LuxuriaPlot No.104 Sector-17 New Panvel West-410206164CompletedSep 2023Mar 2023

How this compares with Raigarh

90%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tricity Aura on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalamboli5,900+ in Raigarh

2 kmTricity AuraCompleted 23Lapsed / revoked 11Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: Tricity Realty LLP

TRICITY REALTY LLP has 14 registrations on MahaRERA, including TRICITY PALACIO and TRICITY PANACHE. Its filings disclose 14 earlier MahaRERA projects: declares 12 of 14 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Tricity Aura is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tricity Aura?

The registered promoter entity is Tricity Realty LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tricity Aura?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tricity Aura?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tricity Aura?

The professionals named in the filing: Architect: The Firm; Engineer: M/s. G. A. Bhilare Consultants Pvt. Ltd.; Engineer: Mayuri Popat Mane; Chartered Accountant: Vikas Kamra & Co.; Chartered Accountant: Umesh Aswani & co; Chartered Accountant: MANISHA GELARAM GERELLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tricity Aura?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tricity Aura. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tricity Aura to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.