Transcon Ramdev Plaza
By Transcon Iconica Private Limited
RG-MH-97472 · RERA P51800010457 · Last updated on MahaRERA portal: 22 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 14 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
- Rs 90.00 crore secured on the land, in favour of VISTRA ITCL INDIA LIMITED
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Transcon Ramdev Plaza is a Others project by Transcon Iconica Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010457 on 27 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 14 complaints are on record with the regulator.
At a glance
Project
- NameTranscon Ramdev Plaza
- TypeOthers
- Location
- 1st Road TPS III
- VileParle (W)
- Andheri
- Mumbai Suburban
- 400054
- Pincode400054
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800010457
- ReraGenie IDRG-MH-97472
Builder
- NameTranscon Iconica Private Limited
- Entity typeCompany
- DirectorsIrfan Mohammed Latif Shaikh, Rishi Todi
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed243 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Transcon Ramdev Plaza | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
Transcon Ramdev Plaza: 65% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 35% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 65% |
| Electrical meter room, sub-station, receiving station | Yes | 40% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Reza Kabul Architects Private Limited |
| Architect | Aakar Architects & Consultants |
| Engineer | Chandresh Jadavji Dedhia |
| Engineer | JW Consultants LLP |
| Chartered Accountant | Malvika & Associates |
| Partner | Role in project |
|---|---|
| Transcon Iconica Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir, The Real Estate Project Transcon Ramdev Plaza is proposed to be developed as Sale Component generated in slum rehabilitation scheme. The project has been delayed due to various factors including delay in approvals for relocation and realignment of road adjoining the project, other approvals dependent on this realigned road and resultant delay in construction of project. The time delay has also increased due to post covid slow down as a result of lesser number of labour in the market. We therefore request you to grant extension of registration by an year. Thanking you.
Reason as filed by the promoter1. COVID-19: The COVID-19 pandemic resulted in significant disruptions, including labour shortages, supply chain delays, and restricted on-site construction activities due to government-mandated lockdowns. 2. Stop-work issued by Slum Rehabilitation Authority: The project got stuck due stop-work issued by Slum Rehabilitation Authority and it took us some time to resolve the issues raised by slum dwellers residing on the project land. 3. Change in Management: The shareholders of the company were anxious due to stoppage of work as well as delayed construction of project. Accordingly, the sharehol
Litigation declared30
| Case | Court | Status |
|---|---|---|
| 2003/2015 | City Civil Court Dindoshi | Disposed |
| 150/2016 | HPC Bandra | Pending |
| 528/2016 | City Civil Court Dindoshi | Pending |
| 1212/2016 | City Civil Court Dindoshi | Pending |
| 164/2016 | HPC Bandra | Disposed Off |
| 32535/2017 | Bombay High court | Rejected |
| 13/2018 | Bandra MM Court | Pending |
| 2849/2017 | Bombay High Court | Disposed |
| 11584/2017 | Bombay High Court | Disposed |
| 755/2017 | Additional Collector Bandra | Disposed |
| 59/2017 | Redressal Committee | Disposed |
| 123/2019 | Bombay High Court | Pending |
| 196/2018 | Bandra MM Court | Disposed |
| 363/2019 | Bombay High Court | For Rejection |
| 1343/2019 | Session Court Bombay | Disposed Off |
| 2503/2019 | Bombay High Court | Pending |
| AT006000000053446/2021 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053393/2021 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053572/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053577/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053585/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053579/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053583/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053584/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053586/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053587/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053574/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| AT006000000053571/2022 | MAHARASHTRA REAL ESTATE APPELLATE TRIBUNAL | Pending |
| CC006000000197721/2021 | MahaRERA | Pending |
| CC006000000197730/2021 | MahaRERA | Pending |
Complaints filed with MahaRERA14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000196551 | PARESH VIRJI GALA | TRANSCONICONICA PRIVATE LIMITED | 31/03/2021 |
| CC006000000197464 | Haresh B. Shah | Transcon Iconica Private Limited | 02/07/2021 |
| CC006000000197721 | Dhansukh Bharmal Gala | Transcon Iconica Private Limited | 24/07/2021 |
| CC006000000197730 | Dixit Kantilal Gala | Transcon Iconica Private Limited | 24/07/2021 |
| CC006000000197734 | Hansa Kantilal Gala | Transcon Iconica Private Limited | 24/07/2021 |
| CC006000000197736 | Jigar Satish Gohel | Transcon Iconica Private Limited | 24/07/2021 |
| CC006000000197738 | Jigna Ramnik Boricha | Transcon Iconica Private Limited | 24/07/2021 |
| CC006000000197739 | Jyoti K Shah | Transcon Iconica Private Limited | 25/07/2021 |
| CC006000000197740 | Kanti B Gala | Transcon Iconica Private Limited | 25/07/2021 |
| CC006000000197741 | Pooja K Shah | Transcon Iconica Private Limited | 25/07/2021 |
| CC006000000197743 | Rinkal Gala | Transcon Iconica Private Limited | 25/07/2021 |
| CC006000000197746 | Satish B. Gohel | Transcon Iconica Private Limited | 25/07/2021 |
| CC006000000197754 | Haresh B. Shah | Transcon Iconica Private Limited | 26/07/2021 |
| CC006000000198112 | Haresh B. Shah | JSB Housing LLP | 26/08/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed243
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 243 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: TRP Form 1 Jun 25.pdf | 22 May 2026 |
| Form 2File: TRP Engineer Certificate June 2025.pdf | 22 May 2026 |
| Form 3File: Ramdev Plaza Jun 25 Signed_11zon.pdf | 22 May 2026 |
| Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 30 06 2025.pdf | 22 May 2026 |
| Form 1File: Architect Certificate 30 09 2025 trp.pdf | 22 May 2026 |
| Form 2File: TRP Form 2 Sep 25 Signed.pdf | 22 May 2026 |
| Form 3File: Form 3 TIPL Ramdev Plaza Sep 25_11zon.pdf | 22 May 2026 |
| Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 30 09 2025.pdf | 22 May 2026 |
| Form 1File: Form 1 TRP DEC 25.pdf | 22 May 2026 |
| Form 2File: Engg Certificate Ramdev Plaza Dec 25.pdf | 22 May 2026 |
| Form 3File: Form 3 TRP DEC 25_11zon.pdf | 22 May 2026 |
| Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 31 12 2025.pdf | 22 May 2026 |
| Form 1File: Form 1 TRP Mar 26.pdf | 22 May 2026 |
| Form 2File: Form 2 TRP Mar 26.pdf | 22 May 2026 |
| Form 3File: Form 3 TRP Mar 26_11zon.pdf | 22 May 2026 |
| Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 12 05 2026.pdf | 22 May 2026 |
| Proforma of Agreement for saleFile: Agreement - RERA - Revised - 17 June 2025.pdf | 24 Jun 2025 |
| Certificates of CA (Form 3)File: Revise Form 3 (1) (1).pdf | 11 Jun 2025 |
| Layout approvalFile: Amended IOA Plan (1)_1-1.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_2-2.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_3-3.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_4-4.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_5-6.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_7-7.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_8-8.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_9-9.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_10-10.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_11-11.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_12-12.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_13-13.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_14-14.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_15-16.pdf | 23 Apr 2025 |
| Layout approvalFile: Amended IOA Plan (1)_17-end.pdf | 23 Apr 2025 |
| Building plan approvalFile: Amended IOA Letter.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_1-1.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_2-2.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_3-3.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_4-4.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_5-6.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_7-7.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_8-8.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_9-9.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_10-10.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_11-11.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_12-12.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_13-13.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_14-14.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_15-16.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_17-end.pdf | 23 Apr 2025 |
| Building Plan Approval (IOD)File: Amended IOA Letter.pdf | 23 Apr 2025 |
| Building plan approvalFile: 3rd floor plan Wing-G 3 office Units.pdf | 1 Mar 2025 |
| Building Plan Approval (IOD)File: 3rd floor plan Wing-G 3 office Units.pdf | 1 Mar 2025 |
| Certificates of CA (Form 3)File: Form3 Revised Sep'24 (1) (1).pdf | 22 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3-Revised Jun'24.pdf | 21 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3-Revised Sep'24.pdf | 21 Dec 2024 |
| Declaration in FORM BFile: Ramdev Plaza-Affidavit cum Declaration.pdf | 17 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Mar 2024.pdf | 16 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- June 2024.pdf | 16 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Sept 2024.pdf | 16 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3-Jun'24.pdf | 16 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3-Sep'24.pdf | 16 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Sep'24.pdf | 16 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Jun'24.pdf | 16 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Mar'24.pdf | 16 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Mar'24.pdf | 16 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Re-endorsed.pdf | 18 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Re-endorsed.pdf | 18 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-1.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-2.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-3.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-4-5.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-6.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-7.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-8.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-9.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-10.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-11.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-12-13.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-14.pdf | 8 Nov 2024 |
| Building plan approvalFile: Amended IOA Plan-15-16.pdf | 8 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 243 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Transcon Ramdev Plaza on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VileParle (W)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 400 registered projects within 2 km.
AVIARA
BALUWALA BUILDERS
Ruparel Panache
Ruparel Infra & Realty Pvt Ltd
Vascon Orchids
Vascon Engineers Ltd
COMMERZ 54
SHREE VINAYAK REALITY PRIVATE LIMITED
Vascon Onyx Residences
Vascon Engineers Ltd
REDEVELOPMENT OF SHINING STAR CHSL
PRANAV CONSTRUCTIONS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: Transcon Iconica Private Limited
Transcon Iconica Private Limited has 1 registration on MahaRERA, including Transcon Ramdev Plaza. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Transcon Ramdev Plaza is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Transcon Ramdev Plaza?
The registered promoter entity is Transcon Iconica Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Transcon Ramdev Plaza?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Transcon Ramdev Plaza?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Transcon Ramdev Plaza?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Transcon Ramdev Plaza?
The professionals named in the filing: Architect: Reza Kabul Architects Private Limited; Architect: Aakar Architects & Consultants; Engineer: Chandresh Jadavji Dedhia; Engineer: JW Consultants LLP; Chartered Accountant: Malvika & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Transcon Ramdev Plaza?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback