Transcon Ramdev Plaza

By Transcon Iconica Private Limited

RG-MH-97472 · RERA P51800010457 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • 14 complaints at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken
  • Rs 90.00 crore secured on the land, in favour of VISTRA ITCL INDIA LIMITED

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
4 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
14Complaints at MahaRERAon this registration
Jump to the 243 documents Report an error

Transcon Ramdev Plaza is a Others project by Transcon Iconica Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010457 on 27 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 14 complaints are on record with the regulator.

At a glance

Project

  • NameTranscon Ramdev Plaza
  • TypeOthers
  • Location
    • 1st Road TPS III
    • VileParle (W)
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010457
  • ReraGenie IDRG-MH-97472

Builder

  • NameTranscon Iconica Private Limited
  • Entity typeCompany
  • DirectorsIrfan Mohammed Latif Shaikh, Rishi Todi

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed243 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Transcon Ramdev PlazaNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

Transcon Ramdev Plaza: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area9,351 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofVISTRA ITCL INDIA LIMITED
Secured amountRs 90.00 crore
CERSAI search filedYes
Declared on12 May 2026

Approvals and building plan

Permissible FSI35000.0
Proposed, not sanctioned28,329 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd Shop No 14 to 16 Vikas Paradise Bhakti Marg Opp Balrajeshwar Mandir Mulund W Mumbai-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectReza Kabul Architects Private Limited
ArchitectAakar Architects & Consultants
EngineerChandresh Jadavji Dedhia
EngineerJW Consultants LLP
Chartered AccountantMalvika & Associates
PartnerRole in project
Transcon Iconica Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017591Dec 2023 → Dec 2024

Reason as filed by the promoterRespected Sir, The Real Estate Project Transcon Ramdev Plaza is proposed to be developed as Sale Component generated in slum rehabilitation scheme. The project has been delayed due to various factors including delay in approvals for relocation and realignment of road adjoining the project, other approvals dependent on this realigned road and resultant delay in construction of project. The time delay has also increased due to post covid slow down as a result of lesser number of labour in the market. We therefore request you to grant extension of registration by an year. Thanking you.

EXT51800025891Dec 2023 → Dec 2026

Reason as filed by the promoter1. COVID-19: The COVID-19 pandemic resulted in significant disruptions, including labour shortages, supply chain delays, and restricted on-site construction activities due to government-mandated lockdowns. 2. Stop-work issued by Slum Rehabilitation Authority: The project got stuck due stop-work issued by Slum Rehabilitation Authority and it took us some time to resolve the issues raised by slum dwellers residing on the project land. 3. Change in Management: The shareholders of the company were anxious due to stoppage of work as well as delayed construction of project. Accordingly, the sharehol

Litigation declared30

CaseCourtStatus
2003/2015City Civil Court DindoshiDisposed
150/2016HPC BandraPending
528/2016City Civil Court DindoshiPending
1212/2016City Civil Court DindoshiPending
164/2016HPC BandraDisposed Off
32535/2017Bombay High courtRejected
13/2018Bandra MM CourtPending
2849/2017Bombay High CourtDisposed
11584/2017Bombay High CourtDisposed
755/2017Additional Collector BandraDisposed
59/2017Redressal CommitteeDisposed
123/2019Bombay High CourtPending
196/2018Bandra MM CourtDisposed
363/2019Bombay High CourtFor Rejection
1343/2019Session Court BombayDisposed Off
2503/2019Bombay High CourtPending
AT006000000053446/2021MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053393/2021MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053572/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053577/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053585/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053579/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053583/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053584/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053586/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053587/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053574/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
AT006000000053571/2022MAHARASHTRA REAL ESTATE APPELLATE TRIBUNALPending
CC006000000197721/2021MahaRERAPending
CC006000000197730/2021MahaRERAPending

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC006000000196551PARESH VIRJI GALATRANSCONICONICA PRIVATE LIMITED31/03/2021
CC006000000197464Haresh B. ShahTranscon Iconica Private Limited02/07/2021
CC006000000197721Dhansukh Bharmal GalaTranscon Iconica Private Limited24/07/2021
CC006000000197730Dixit Kantilal GalaTranscon Iconica Private Limited24/07/2021
CC006000000197734Hansa Kantilal GalaTranscon Iconica Private Limited24/07/2021
CC006000000197736Jigar Satish GohelTranscon Iconica Private Limited24/07/2021
CC006000000197738Jigna Ramnik BorichaTranscon Iconica Private Limited24/07/2021
CC006000000197739Jyoti K ShahTranscon Iconica Private Limited25/07/2021
CC006000000197740Kanti B GalaTranscon Iconica Private Limited25/07/2021
CC006000000197741Pooja K ShahTranscon Iconica Private Limited25/07/2021
CC006000000197743Rinkal GalaTranscon Iconica Private Limited25/07/2021
CC006000000197746Satish B. GohelTranscon Iconica Private Limited25/07/2021
CC006000000197754Haresh B. ShahTranscon Iconica Private Limited26/07/2021
CC006000000198112Haresh B. ShahJSB Housing LLP26/08/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed243

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 243 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: TRP Form 1 Jun 25.pdf22 May 2026
Form 2File: TRP Engineer Certificate June 2025.pdf22 May 2026
Form 3File: Ramdev Plaza Jun 25 Signed_11zon.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 30 06 2025.pdf22 May 2026
Form 1File: Architect Certificate 30 09 2025 trp.pdf22 May 2026
Form 2File: TRP Form 2 Sep 25 Signed.pdf22 May 2026
Form 3File: Form 3 TIPL Ramdev Plaza Sep 25_11zon.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 30 09 2025.pdf22 May 2026
Form 1File: Form 1 TRP DEC 25.pdf22 May 2026
Form 2File: Engg Certificate Ramdev Plaza Dec 25.pdf22 May 2026
Form 3File: Form 3 TRP DEC 25_11zon.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 31 12 2025.pdf22 May 2026
Form 1File: Form 1 TRP Mar 26.pdf22 May 2026
Form 2File: Form 2 TRP Mar 26.pdf22 May 2026
Form 3File: Form 3 TRP Mar 26_11zon.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: TRP Inventory Disclosure 12 05 2026.pdf22 May 2026
Proforma of Agreement for saleFile: Agreement - RERA - Revised - 17 June 2025.pdf24 Jun 2025
Certificates of CA (Form 3)File: Revise Form 3 (1) (1).pdf11 Jun 2025
Layout approvalFile: Amended IOA Plan (1)_1-1.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_2-2.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_3-3.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_4-4.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_5-6.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_7-7.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_8-8.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_9-9.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_10-10.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_11-11.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_12-12.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_13-13.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_14-14.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_15-16.pdf23 Apr 2025
Layout approvalFile: Amended IOA Plan (1)_17-end.pdf23 Apr 2025
Building plan approvalFile: Amended IOA Letter.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_1-1.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_2-2.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_3-3.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_4-4.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_5-6.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_7-7.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_8-8.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_9-9.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_10-10.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_11-11.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_12-12.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_13-13.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_14-14.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_15-16.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended IOA Plan (1)_17-end.pdf23 Apr 2025
Building Plan Approval (IOD)File: Amended IOA Letter.pdf23 Apr 2025
Building plan approvalFile: 3rd floor plan Wing-G 3 office Units.pdf1 Mar 2025
Building Plan Approval (IOD)File: 3rd floor plan Wing-G 3 office Units.pdf1 Mar 2025
Certificates of CA (Form 3)File: Form3 Revised Sep'24 (1) (1).pdf22 Jan 2025
Certificates of CA (Form 3)File: Form 3-Revised Jun'24.pdf21 Dec 2024
Certificates of CA (Form 3)File: Form 3-Revised Sep'24.pdf21 Dec 2024
Declaration in FORM BFile: Ramdev Plaza-Affidavit cum Declaration.pdf17 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Mar 2024.pdf16 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- June 2024.pdf16 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Sept 2024.pdf16 Dec 2024
Certificates of CA (Form 3)File: Form 3-Jun'24.pdf16 Dec 2024
Certificates of CA (Form 3)File: FORM 3-Sep'24.pdf16 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Sep'24.pdf16 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Jun'24.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Mar'24.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Mar'24.pdf16 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Re-endorsed.pdf18 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Re-endorsed.pdf18 Nov 2024
Building plan approvalFile: Amended IOA Plan-1.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-2.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-3.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-4-5.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-6.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-7.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-8.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-9.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-10.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-11.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-12-13.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-14.pdf8 Nov 2024
Building plan approvalFile: Amended IOA Plan-15-16.pdf8 Nov 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Transcon Ramdev Plaza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VileParle (W)6,700+ in Mumbai Suburban

2 kmTranscon Ramdev PlazaCompleted 173Lapsed / revoked 83Other 144Dot size: filed unitsN

Filed coordinates, straight-line distance. 400 registered projects within 2 km.

Builder: Transcon Iconica Private Limited

Transcon Iconica Private Limited has 1 registration on MahaRERA, including Transcon Ramdev Plaza. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Transcon Ramdev Plaza is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Transcon Ramdev Plaza?

The registered promoter entity is Transcon Iconica Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Transcon Ramdev Plaza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Transcon Ramdev Plaza?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Transcon Ramdev Plaza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Transcon Ramdev Plaza?

The professionals named in the filing: Architect: Reza Kabul Architects Private Limited; Architect: Aakar Architects & Consultants; Engineer: Chandresh Jadavji Dedhia; Engineer: JW Consultants LLP; Chartered Accountant: Malvika & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Transcon Ramdev Plaza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Transcon Ramdev Plaza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Transcon Ramdev Plaza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.