ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / TIRUPATI NAMAAH

Registered No litigation declared Others project

TIRUPATI NAMAAH

By Om Shree Tirupati Balaji Builders

RG-MH-19134 · RERA P51700078184 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of A U Small Finance Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
118 of 156Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

TIRUPATI NAMAAH is a Others project by Om Shree Tirupati Balaji Builders in Thane, Maharashtra, registered with MahaRERA as P51700078184 on 29 Nov 2024. Possession is promised by 31 Dec 2030. 38 of the 156 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameTIRUPATI NAMAAH
  • TypeOthers
  • Location
    • GODDEV
    • BHAYANDAR
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • RERA no.P51700078184
  • ReraGenie IDRG-MH-19134

Builder

  • NameOm Shree Tirupati Balaji Builders
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredNov 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed85 files

Current status

24%38 of 156 units booked
9.1%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA1313133750
BUILDING 2NA25251060106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING 127%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed344

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots344
Closed/Covered124
Open Space220
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 156106162
BUILDING 268114182

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,220 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofA U Small Finance Bank Limited
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on16 Oct 2025

Approvals and building plan

Sanctioning authorityMira-Bhayandar Municipal Corporation
Permissible FSI33433.66
Proposed, not sanctioned13,381 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16, Ground Floor, Kanakia Zillion, LBS-CST Road, Junction,BKC Annexe, Kurla(W),Mumbai,Maharashtra-400070
Estimated costRs 81.30 cr
Cost incurredRs 7.38 cr
Work done9.07%
BuildingWingEstimatedIncurred
-NARs 30.55 cr-
BUILDING 2NARs 30.45 crRs 4.43 cr
BUILDING 1NARs 20.30 crRs 2.95 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJS CONSULTANTS
EngineerAbhijit Phatarpekar
Chartered AccountantRD LUKAD AND CO
Chartered AccountantRAMESH DHONDIRAM LUKAD
PartnerRole in project
Om Shree Tirupati Balaji Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form No 1 Architect.pdf18 Apr 2026
Withdrawal Update Form 2File: Form No 2 Engg.pdf18 Apr 2026
Withdrawal Update Form 3File: fORM 3 OM SHREE 31-3-2026.pdf18 Apr 2026
Form 5 (FY 2025-2026)File: fORM 5 2025-2026.pdf16 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf19 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf19 Jan 2026
Withdrawal Update Form 3File: OM SHREE TRUPATI BALAJI BUILDERS.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: OM SHREEB TIRUPATI FORM5.pdf16 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf3 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf3 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf13 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf13 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf13 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf13 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf13 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf13 Oct 2025
Form 1File: Form No 1 - OSTBB.pdf25 Jul 2025
Form 2File: Form No 2 - OSTBB.pdf25 Jul 2025
Form 3File: FORMM 3_compressed.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold List - OSTBB.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized_compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Tirupati Namaah.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TIRUPATI NAMAH FORM1.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ABC.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: PAGE 4.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: PAGE 3.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: PAGE 2.pdf27 Jan 2025
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate(2).pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - 21-11-2024_compressed.pdf21 Nov 2024
Building plan approvalFile: BUILDING.pdf18 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING.pdf18 Nov 2024
Proforma of Agreement for saleFile: Tirupati Namaah.pdf18 Nov 2024
Layout approvalFile: Layout.pdf9 Nov 2024
Building plan approvalFile: Parking Tower.pdf9 Nov 2024
Building plan approvalFile: Building 1- 11 floor.pdf9 Nov 2024
Building plan approvalFile: Building 1-Basement and Ground FLoor.pdf9 Nov 2024
Building plan approvalFile: Building 2-1-22 floor.pdf9 Nov 2024
Building plan approvalFile: Building 2-Ground-Basement-23 floor.pdf9 Nov 2024
Building plan approvalFile: Building No 1 - 1-2 to 4 floor.pdf9 Nov 2024
Building plan approvalFile: Building No 1-5-8 floor.pdf9 Nov 2024
Building plan approvalFile: Building No 1-9-10 floor.pdf9 Nov 2024
PAN CardFile: Company pan Card_compressed.pdf9 Nov 2024
Copy of the legal title reportFile: TITLE FOR JAI TIRUPATI PROJECT- rera_11zon.pdf9 Nov 2024
Copy of the legal title reportFile: TITLE PETROL PUMP_11zon.pdf9 Nov 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf9 Nov 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf9 Nov 2024
Proforma of Allotment letterFile: Allotment Letter.pdf9 Nov 2024
Declaration in FORM BFile: Form - B of Tirupati Namaah.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No - 1 Architcts Certificate.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No - 2 Engineer's Certificate.pdf9 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building No 1-9-10 floor.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building No 1-5-8 floor.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building No 1 - 1-2 to 4 floor.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 2-1-22 floor.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 1-Basement and Ground FLoor.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 1- 11 floor.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Parking Tower.pdf9 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Building 2-Ground-Basement-23 floor.pdf9 Nov 2024
Other - LegalFile: गोडदेव_72_4_Satbara (1) (2).pdf9 Nov 2024
Other - LegalFile: भाईंदर_66_4_Satbara (4) (1).pdf9 Nov 2024
Other - LegalFile: भाईंदर_65_11_Satbara (2) (1).pdf9 Nov 2024
Other - LegalFile: भाईंदर_66_1_Satbara (2) (1).pdf9 Nov 2024
Other - LegalFile: भाईंदर_66_3_Satbara (1) (1).pdf9 Nov 2024
Other - LegalFile: भाईंदर_65_6A_Satbara (2) (1).pdf9 Nov 2024
Other - LegalFile: गोडदेव_72_1_Satbara (1) (1).pdf9 Nov 2024
Other - LegalFile: गोडदेव_72_3_Satbara (1) (1).pdf9 Nov 2024
CERSAI detailsFile: Self Declaration - Cersai.pdf9 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank Accounts.pdf9 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation-Allotment.pdf9 Nov 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf9 Nov 2024
Other - TechnicalFile: Annexure - A.pdf9 Nov 2024
Deviation Report with respect to model copy of AgreementFile: Deviation- Agremeent.pdf9 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - Ashish Sanghvi.pdf9 Nov 2024

How this compares with Thane

24%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TIRUPATI NAMAAH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDAR7,600+ in Thane

Builder: Om Shree Tirupati Balaji Builders

OM SHREE TIRUPATI BALAJI BUILDERS has 2 registrations on MahaRERA, including TIRUPATI POOJA and TIRUPATI NAMAAH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if TIRUPATI NAMAAH is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TIRUPATI NAMAAH?

The registered promoter entity is Om Shree Tirupati Balaji Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TIRUPATI NAMAAH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TIRUPATI NAMAAH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TIRUPATI NAMAAH?

The professionals named in the filing: Architect: TEJS CONSULTANTS; Engineer: Abhijit Phatarpekar; Chartered Accountant: RD LUKAD AND CO; Chartered Accountant: RAMESH DHONDIRAM LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TIRUPATI NAMAAH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TIRUPATI NAMAAH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TIRUPATI NAMAAH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.