Completed No litigation declared Residential / Group Housing project

TIRUMALA BLOSSOM

By RAHUL VASANTRAO INGLE

RG-MH-16423 · RERA P53100025870 · Last updated on MahaRERA portal: 31 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Nov 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

TIRUMALA BLOSSOM is a Residential / Group Housing project by RAHUL VASANTRAO INGLE in Sangli, Maharashtra, registered with MahaRERA as P53100025870 on 24 Jul 2020. The registration is recorded completed; possession was promised by 10 Nov 2023.

At a glance

Project

  • NameTIRUMALA BLOSSOM
  • TypeResidential / Group Housing
  • Location
    • KUPWAD ROAD
    • LAXMI TEMPLE
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • RERA no.P53100025870
  • ReraGenie IDRG-MH-16423

Builder

  • NameRAHUL VASANTRAO INGLE
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2020PromisedNov 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jul 2020
  • Promised completion10 Nov 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TIRUMALA BLOSSOMNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

TIRUMALA BLOSSOM: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,373 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
TIRUMALA BLOSSOMSangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Permissible FSI1915.28
Proposed, not sanctioned1,915 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMADHAVNAGAR ROAD OPPR RTO OFFICE SANGLI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr SHRIRAM V KULKARNI
EngineerPRADIP GHODE
Chartered AccountantSHRYES SHAH
Chartered AccountantKEDAR A SABANE
PartnerRole in project
RAHUL VASANTRAO INGLE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jul 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Mar 2024

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - FinanceFile: REVISED BANK CHANGE LETTER 30072024.pdf31 Jul 2024
Other - FinanceFile: DECLARATION CUM UNDERTAKING_TIRUPATI BLOSSOM.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 31-03-21.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 28-06-21.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 31-03-23.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 28-09-23.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 22-06-23.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 20-12-22.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 15-10-22.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form -1 07-06-22.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form - 1 11-03-22.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form - 1 13-12-21.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 30-9-20.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-12-20.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 30-6-21.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 30-9-21.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCOSURE OF SOLD 28-09-20.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 31-03-21.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCOSURE OF SOLD 28-6-21.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCOSURE OF SOLD 28-09-21.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCOSURE OF SOLD 31-12-22.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCOSURE OF SOLD 31-03-23.pdf4 Jun 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 30-09-20.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM- 3 31-12-20.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 30-06-21.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 30-09-21.pdf4 Jun 2024
Building plan approvalFile: DWG.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: DWG.pdf30 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISED BANDHKAM PARVANA.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 up 31-03-2023.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - UPTO 30-6-23.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - UPTO 30-9-23.pdf30 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a new bank_compressed.pdf30 Apr 2024
Other - FinanceFile: declaration cum undertaking.pdf30 Apr 2024
Other - FinanceFile: permission change bank letter REVISED_compressed.pdf30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A - 3-4-21.pdf28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A - 4-4-22.pdf28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A - 2-4-23.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 31-03-21.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 31-12-21.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 31-03-22.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 30-06-22.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 30-09-22.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 29-06-23.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: diclosure of sold 30-09-23.pdf28 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf28 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE TIRUMALA BLOSSAM.pdf21 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 TIRUMALA BLOSSOM.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: annual report statement of accounts -20-21.pdf3 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: annual report statement of accounts 1 4 2021 to 31 3 2022.pdf3 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 17032021.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 131221.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 1132022.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate 762022.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - 15102022.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate - 4042021.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 4 1 2022.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 5 4 2022.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate - 6062022.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate - 04102022.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate 07012023.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 1822023.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 3132021.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 3062022.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 3092022.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 31122022.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate - 31032022.pdf25 Feb 2023
OtherFile: vimal ingale declarationScan .pdf5 Dec 2020
Details of encumbrancesFile: ENCUMBRANCE.pdf21 Jul 2020
Proforma of Allotment letterFile: Rahul_Ingale_Tirumala_BLOSSOM.pdf21 Jul 2020
Layout approvalFile: LAYOUT.pdf18 Jul 2020
Building plan approvalFile: PLAN APPROVAL.pdf18 Jul 2020
PAN CardFile: pancard-converted.pdf18 Jul 2020
Copy of the legal title reportFile: NON ENCUMBARANCE 2.pdf18 Jul 2020
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf18 Jul 2020
Building Plan Approval / NA Order for plotted developmentFile: PLAN APPROVAL.pdf18 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: PERMISSION LETTER.pdf18 Jul 2020
Declaration in FORM BFile: DECLRATION FORM B 1.pdf18 Jul 2020
Declaration in FORM BFile: DECLRATION FORM B 1.pdf18 Jul 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
TIRUMALA SRUSHTIBRAHMANPURI MIRAJ42CompletedApr 2018Jan 2018

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep TIRUMALA BLOSSOM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LAXMI TEMPLE790+ in Sangli

Builder: RAHUL VASANTRAO INGLE

RAHUL VASANTRAO INGLE has 2 registrations on MahaRERA, including TIRUMALA NISARGA and TIRUMALA BLOSSOM. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if TIRUMALA BLOSSOM is delayed beyond 10 Nov 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TIRUMALA BLOSSOM?

The registered promoter entity is RAHUL VASANTRAO INGLE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TIRUMALA BLOSSOM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TIRUMALA BLOSSOM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TIRUMALA BLOSSOM?

The professionals named in the filing: Architect: Ar SHRIRAM V KULKARNI; Engineer: PRADIP GHODE; Chartered Accountant: SHRYES SHAH; Chartered Accountant: KEDAR A SABANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TIRUMALA BLOSSOM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TIRUMALA BLOSSOM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TIRUMALA BLOSSOM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.