Registration lapsed No litigation declared Residential / Group Housing project

The Urbana

By Intercontinental Infrastructure Limited

RG-MH-76084 · RERA P52100048342 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
6 of 11Construction stages donefurthest along: Staircases, 95%
4 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

The Urbana is a Residential / Group Housing project by Intercontinental Infrastructure Limited in Pune, Maharashtra, registered with MahaRERA as P52100048342 on 26 Dec 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 75 of the 79 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Urbana
  • TypeResidential / Group Housing
  • Location
    • Chakan Khed Road
    • Chakan
    • Chakan (CT)
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048342
  • ReraGenie IDRG-MH-76084

Builder

  • NameIntercontinental Infrastructure Limited
  • Entity typeCompany
  • DirectorsLaxmi Rajam Narsaiah Chilappagari, Vijaya Laxmi Rajam Chilappagari, Soumya Srikanth Chilappagari, Srikanth Laxmi Rajam Chilappagari
  • Other registrations3 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

7 months past promisethis monthRegisteredDec 2022PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Dec 2022
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

95%75 of 79 units booked

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building -I1NA121179079

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Building -I1: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes65%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes25%
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes20%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership26

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,475 sq m
Land owned byThe promoter, with other names on the file
Named landowners26
LandownerVillageDistrict
Murlidhar Ananda DhadgeChakan (CT)Pune
Uttam Ananda DhadgeChakan (CT)Pune
Sunil Yashwant WadekarChakan (CT)Pune
Ajij Sajjubhai SikilkarChakan (CT)Pune
Salim Sajjubhai SikilkarChakan (CT)Pune
Dattatray Tukaram KandageChakan (CT)Pune
Shankar Tukaram KandageChakan (CT)Pune
Kisan Ranu KandageChakan (CT)Pune
Tarabai Popat KandageChakan (CT)Pune
Anita Popat KandageChakan (CT)Pune
Dhananjay Popat KandageChakan (CT)Pune
Prashant Popat KandageChakan (CT)Pune
Dhanashri Sanjay GaikwadKalusPune
Chandrakant Ranu KandageChakan (CT)Pune
Dattatray Raghunath KandageChakan (CT)Pune
Mahesh Madhukar KandageChakan (CT)Pune
Sonali Santosh RaskarChakan (CT)Pune
Sindhu Dnyandev JagtapPune (M Corp.)Pune
Sulochna Parshuram RandhePanvelRaigarh
Kusum Balshiram RamaneThane (M Corp.)Thane
Sulabha Subhash BalsarafMulundMumbai Suburban
Nanda Sopan DokeKalyanThane
Vilas Genbhau KandageChakan (CT)Pune
Yogesh Chandrakant ZagadeChakan (CT)Pune
Ganesh Laxmn ZagadeChakan (CT)Pune
Shree Sai AssociatesChakan (CT)Pune

Approvals and building plan

Sanctioning authorityChakan Municipal Corporation
Permissible FSI4110.86
Proposed, not sanctioned4,111 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch612-B, Parsi Agiary, Nanapeth, Pune - 411002

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepak Honkan
EngineerSK Consultants & Engineers
EngineerS K Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantVikas Abhang & Associates
PartnerRole in project
Intercontinental Infrastructure Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: I1-Form1.pdf19 Apr 2026
Form 2File: Form 2 - I1 Urbana March 2026.pdf19 Apr 2026
Form 3File: Form 3 - I1 Urbana March 2026.pdf19 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Urbana as on March 2026.pdf19 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 - The Urbana I1 Fy 2024-25.pdf24 Mar 2026
Form 1File: Form 1 - The Urbana I1 as on Dec 2025.pdf20 Feb 2026
Form 2File: Form 2 - The Urbana I1 as on Dec 2025.pdf20 Feb 2026
Form 3File: Form 3 - The Urbana I1 as on Dec 2025.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Urbana I1 as on Dec 2025.pdf20 Feb 2026
Form 1File: Form 1 - The Urbana as on Sep 2025.pdf7 Nov 2025
Form 2File: Form 2 - The Urbana as on Sep 2025.pdf7 Nov 2025
Form 3File: Form 3 - The Urbana as on Sep 2025.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Urbana as on Sep 2025.pdf7 Nov 2025
Form 1File: Form 1- Urbana I1 as on June 2025.pdf30 Jul 2025
Form 2File: Form 2 - Urbana I1 as on June 2025.pdf30 Jul 2025
Form 3File: Form 3 - I1 Urbana June 2025.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Urbana as on June 2025.pdf30 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - I1 Urbana March 2025-Signed.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Urbana I1 as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Urbana I1 as on March 2025.pdf15 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - The Urbana I1 FY 23-24.pdf11 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - The Urbana FY 23-24.pdf11 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: I1 building CC renewal certificate.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - I1 Urbana December 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Urbana I1 as on December 2024.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: I1 Building.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - I1 Urbana September 2024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Urbana I1 as on 30th September 2024.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - I1 Urbana June 2024.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Urbana I1 as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - I1 Urbana March 2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Urbana I1 as on June 2024.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Urbana I1 as on March 2024 (SIGNED).pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Mar 2024.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - I1 Urbana as on March 2024 (SIGNED).pdf13 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - The Urbana I1.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -I1 Mar 2024.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - The Urbana I1.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A -I1.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - The Urbana I1.pdf23 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - The Urbana I1 FY22-23.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - I1 march 2024.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Urbana I1 as on March 2024 (SIGNED).pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: I1.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - I1 Urbana as on March 2024 (SIGNED).pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - The Urbana I1 as on Dec 2023.pdf22 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Urbana I1 as on December 2023.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - The Urbana I1 as on Dec 2023.pdf22 Feb 2024
Proforma of Agreement for saleFile: AFS The Urbana I1.pdf20 Oct 2023
Details of encumbrances concerned to FinanceFile: Finance_.pdf11 Nov 2022
Details of encumbrances concerned to FinanceFile: Legal.pdf11 Nov 2022
Details of encumbrances concerned to LegalFile: Finance_.pdf11 Nov 2022
Details of encumbrances concerned to LegalFile: Legal.pdf11 Nov 2022
Declaration about Commencement CertificateFile: Format-D.pdf11 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200251891262_For_Asset_Based_Search_11_11_2022_13_29_06_085.pdf11 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format-A.pdf11 Nov 2022
Building plan approvalFile: J1 I4 Page 4.pdf9 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: J1 I4 Page 4.pdf9 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_rotated.pdf9 Nov 2022
Layout approvalFile: Layout J AND I Page 1_compressed.pdf8 Nov 2022
Building plan approvalFile: J1 AND I1 Page 2_merged_compressed.pdf8 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout J AND I Page 1_compressed.pdf8 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: J1 AND I1 Page 2_merged_compressed.pdf8 Nov 2022
PAN CardFile: PANCARD-ICIL.pdf5 Nov 2022
Copy of the legal title reportFile: Title 14122022_compressed.pdf5 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development.pdf5 Nov 2022
Declaration in FORM BFile: Form-B_Promoter.pdf5 Nov 2022
Proforma of Allotment letterFile: Allotment Letter_Intercontinental Infrastructure ltd 01112022.pdf5 Nov 2022
Proforma of Agreement for saleFile: AFS_Intercontinental Infrastructure ltd_01112022.pdf5 Nov 2022
Deviation Report with respect to Allotment letterFile: Al Deviation_rotated.pdf5 Nov 2022
Deviation Report with respect to model copy of AgreementFile: AFS Deviation_rotated.pdf5 Nov 2022

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Urbana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chakan13,700+ in Pune

2 kmThe UrbanaCompleted 6Lapsed / revoked 15Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Intercontinental Infrastructure Limited

Intercontinental Infrastructure Limited has 4 registrations on MahaRERA, including The Urbana and The Urbana. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that The Urbana shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if The Urbana is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Urbana?

The registered promoter entity is Intercontinental Infrastructure Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Urbana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Urbana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Urbana?

The professionals named in the filing: Architect: Deepak Honkan; Engineer: SK Consultants & Engineers; Engineer: S K Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Vikas Abhang & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Urbana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Urbana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Urbana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.