THE TRIDENT

By DESHPANDE INFRA

RG-MH-81300 · RERA P53000055980 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 80%
33 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

THE TRIDENT is a Others project by DESHPANDE INFRA in Kolhapur, Maharashtra, registered with MahaRERA as P53000055980 on 2 May 2024. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 11 of the 44 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE TRIDENT
  • TypeOthers
  • Location
    • COLLECTOR OFFICE MAIN ROAD
    • E WARD NAGALA PARK
    • KOLHAPUR
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000055980
  • ReraGenie IDRG-MH-81300

Builder

  • NameDESHPANDE INFRA
  • Entity typePartnership
  • GSTIN27ADOFS0824P1ZF
  • PartnersADITYA ABHAY DESHPANDE, AMOL ARUN DESHPANDE, Nainesh Ramchandra Aahuja
  • Other registrations6 more →
  • Completed2 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredMay 2024First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed80 files

Current status

25%11 of 44 units booked
32.2%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE TRIDENTNA1210242044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

THE TRIDENT: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes5%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed194

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots194
Closed/Covered194

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,631 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on31 May 2025
LandownerVillageDistrict
SHIVDARSHAN CO-OPERATIVE HOUSING SOCIETY LTD. KOP.Kolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI5058.93
Proposed, not sanctioned5,059 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJI UDYAM NAGAR, KARAJGAR ROAD, NEAR HUTATMA PARK KOLHAPUR 416008
Estimated costRs 14.23 cr
Cost incurredRs 4.58 cr
Work done32.2%
BuildingWingEstimatedIncurred
THE TRIDENTNARs 13.55 crRs 4.58 cr
-NARs 67.76 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectELEPHANT ARCHITECTURE AR SUJAY SHASHIKANT KULKARNI
EngineerER SATYAM VILAS JADHAV
EngineerER BHUSHAN VIJAY THAKKAR
EngineerRuturaj Rangrao Patil
Chartered AccountantDAKARE PATIL & CO
Chartered AccountantHaidar Nayanbadshah Mujawar
PartnerRole in project
DESHPANDE INFRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P53000055980/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERTIFICATE.pdf20 Jul 2026
Withdrawal Update Form 2File: FORM 2 - ENGINNER CERTIFICATE.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM-3 CA CERTIFICATE - THE TRIDENT.pdf20 Jul 2026
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERTIFICATE.pdf21 Apr 2026
Withdrawal Update Form 2File: FORM 2 - ENGINNER CERTIFICATE.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM-3 CA CERTIFICATE - THE TRIDENT.pdf21 Apr 2026
Form 2A (FY 2025-2026)File: NEW FORM-2A- QUALTITY ASSURANCE.pdf21 Apr 2026
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERTIFICATE.pdf16 Feb 2026
Withdrawal Update Form 2File: FORM 2 - ENGINNER CERTIFICATE.pdf16 Feb 2026
Withdrawal Update Form 3File: FORM-3 CA CERTIFICATE - THE TRIDENT.pdf16 Feb 2026
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERTIFICATE.pdf3 Nov 2025
Withdrawal Update Form 2File: FORM 2 - ENGINNER CERTIFICATE.pdf3 Nov 2025
Withdrawal Update Form 3File: FORM-3 THE TRIDENT.pdf3 Nov 2025
Form 5 (FY 2024-2025)File: THE TRIDENT- FORM -5.pdf8 Oct 2025
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERTIFICATE.pdf24 Jul 2025
Withdrawal Update Form 2File: FORM 2 - ENGINNER CERTIFICATE.pdf24 Jul 2025
Withdrawal Update Form 3File: FORM 3 - CA.pdf24 Jul 2025
Form 1File: FORM 1.pdf31 May 2025
Form 2File: FORM 2.pdf31 May 2025
Form 3File: FORM-3 THE TRIDENT_compressed (1).pdf31 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Units - THE TRIDENT.pdf31 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 THE TRIDENT_compressed.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Units - THE TRIDENT.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA_compressed (5).pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINNER CERTIFICATE.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Units - rera carpet.pdf28 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - SEPARATE BANK ACCOUNT.pdf2 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Final.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 -THE TRIDENT_compressed.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE - THE TRIDENT.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER CERTIFICATE - THE TRIDENT.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Units - rera carpet.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 CA_compressed (4).pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -03 The Trident April.pdf10 Apr 2024
Other - FinanceFile: Deshpande Infra.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE.pdf11 Mar 2024
Other - TechnicalFile: Annexure A - One Plot one Registration.pdf11 Mar 2024
Building plan approvalFile: Plan 1.pdf9 Feb 2024
Building plan approvalFile: Plan 2.pdf9 Feb 2024
Building plan approvalFile: Plan 3.pdf9 Feb 2024
Building plan approvalFile: Plan 4.pdf9 Feb 2024
Building plan approvalFile: Plan 5.pdf9 Feb 2024
Building plan approvalFile: Plan 6.pdf9 Feb 2024
Building plan approvalFile: Plan 7.pdf9 Feb 2024
Building plan approvalFile: Plan 8.pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Finance.pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrances concerned to Legal.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Finance.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrances concerned to Legal.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 8.pdf9 Feb 2024
Declaration about Commencement CertificateFile: Format D - Declaration about CC_0001.pdf9 Feb 2024
Declaration in FORM BFile: Form B Declaration - Promoter.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT'S CERTIFICATE.pdf9 Feb 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf9 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf9 Feb 2024
Proforma of Agreement for saleFile: Agreement to Sell as per RERA Act.pdf9 Feb 2024
Proforma of Allotment letterFile: Allottment Letter - New.pdf9 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Bank Account Declaration_0001.pdf9 Feb 2024
Deviation Report with respect to Allotment letterFile: No Deviation - Allotment Letter.pdf9 Feb 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement to Sell.pdf9 Feb 2024
Layout approvalFile: MOJANI NAKASHA.PDF8 Feb 2024
PAN CardFile: PAN CARD.PDF8 Feb 2024
Copy of the legal title reportFile: LEGAL SEARCH REPORT.pdf8 Feb 2024
Copy of the legal title reportFile: SEARCH REPORT.pdf8 Feb 2024
Copy of Layout Approval (in case of layout)File: MOJANI NAKASHA.PDF8 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: SHIVDARSHAN BUILDING PERMISSION ORDER.pdf8 Feb 2024
CERSAI detailsFile: CERSAI REPORT.pdf8 Feb 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
THE PARKSIDEP53000048034TARABAI PARK, KOLHAPUR, Kolhapur60Dec 2022CompletedDec 2025Nov 2025
24 JEWELSP53000050821Kasaba Karveer Ruikar Colony Nimbalkar Colony, Kolhapur24May 2023CompletedDec 2025Dec 2025
ADDRESS 817P53000032216SAI BABA COLONY, KARANDEMALA, KASBA BAVADE, KOLHAPUR., Kolhapur14Dec 2021CompletedJun 2024May 2024
SIGNATURE ONE496-A-B 'E' WARD SHAHUPURI VYAPARI PETH LANE KOLHAPUR.1-CompletedNov 2020Feb 2020

How this compares with Kolhapur

25%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one moved by 4 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep THE TRIDENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near E WARD NAGALA PARK, KOLHAPUR880+ in Kolhapur

2 kmTHE TRIDENTCompleted 55Lapsed / revoked 33Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 150 registered projects within 2 km.

Builder: DESHPANDE INFRA

DESHPANDE INFRA has 7 registrations on MahaRERA, including ADDRESS 817 and THE PARKSIDE. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if THE TRIDENT is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE TRIDENT?

The registered promoter entity is DESHPANDE INFRA, a partnership as per the filing. Its GSTIN 27ADOFS0824P1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE TRIDENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE TRIDENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE TRIDENT?

The professionals named in the filing: Architect: ELEPHANT ARCHITECTURE AR SUJAY SHASHIKANT KULKARNI; Engineer: ER SATYAM VILAS JADHAV; Engineer: ER BHUSHAN VIJAY THAKKAR; Engineer: Ruturaj Rangrao Patil; Chartered Accountant: DAKARE PATIL & CO; Chartered Accountant: Haidar Nayanbadshah Mujawar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE TRIDENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE TRIDENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE TRIDENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.