The Songbirds Estate Phase I

By Enerrgia Skyi Developers

RG-MH-09297 · RERA P52100000643 · Last updated on MahaRERA portal: 22 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
8 of 99Construction stages doneacross 9 buildings; furthest along: External plumbing and external plaster, 90%
1Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

The Songbirds Estate Phase I is a Residential / Group Housing project by Enerrgia Skyi Developers in Pune, Maharashtra, registered with MahaRERA as P52100000643 on 19 Jul 2017. Possession was promised by 31 Jul 2025 and is now 15 months past that date. The completion date has moved by 36 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Songbirds Estate Phase I
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000643
  • ReraGenie IDRG-MH-09297

Builder

  • NameEnerrgia Skyi Developers
  • Entity typePartnership
  • PartnerSushant Mohan Jadhav
  • Other registrations11 more →
  • Completed5 of 12
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

15 months past promisethis monthRegisteredJul 2017First promiseJul 2022Revised toJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Jul 2017
  • Promised completion31 Jul 2025
  • Revised completionRevised to 31 Jul 2025 (originally 31 Jul 2022)
  • Buildings9 building records
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA30000
Building No 2NA30000
Building No 3NA30000
Building No 4NA30000
Building No 5NA30000
Building No 6NA30000
Building No 7NA30000
Building No 8NA30000
Building No 9NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 22 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

Building No 177%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 217%
ActivityProgress
Excavation80%
Basement (if any)55%
Podiums (if any)0%
Plinth55%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 321%
ActivityProgress
Excavation90%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 427%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes8%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Open Space110
BuildingOpen SpaceTotal
Building No 144
Building No 21212
Building No 31616
Building No 41212
Building No 51212
Building No 61616
Building No 71616
Building No 81616
Building No 966

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,768 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Umesh Kisan KandharePune (M Corp.)Pune
Ravindra Rajaram KandharePune (M Corp.)Pune
Subhash Raghunath JadhavWadagaon (CT)Pune
Hemlata Dnyaneshwar ShindePune (M Corp.)Pune
Mahesh Sadanand ShettyKamshetPune
Vijay Jagnnath WaruleVarulwadiPune

Approvals and building plan

Permissible FSI441.6
Proposed, not sanctioned442 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEarthsong
EngineerDelcons Consultant India Pvt Ltd
PartnerRole in project
Enerrgia Skyi Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012344Jul 2022 → Jul 2025

Reason as filed by the promoterThe Project “The Songbirds Estate Phase I” is located outside from the City of Pune in the Village Bhugaon, Taluka Haveli, Dist Pune. The Village Bhugaon falls under a substantial rainfall area. In the year 2019-2022, we have experienced unprecedented rainfall leading to severe flood situation, which derailed construction activities. We kindly request you to extend the project Completion date from 31/07/2022 to 31/07/2025. Having requested this, we are confident that the project would be completed on or before our new proposed completion date.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000451135Nitin Sudhakar GokhaleMS ENERGEIA SKYI DEVELOPERS15/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Layout.pdf22 Apr 2024
Building plan approvalFile: Row House - 1.pdf22 Apr 2024
Building plan approvalFile: Row House- 2.pdf22 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf22 Apr 2024
Building Plan Approval (IOD)File: Row House - 1.pdf22 Apr 2024
Building Plan Approval (IOD)File: Row House- 2.pdf22 Apr 2024
Declaration about Commencement CertificateFile: Commencement Letter-28-03-2024.pdf22 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-SB Estate Phase I-2 Villas-31-03-24.pdf22 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-SB Estate Phase I-2 Villas-31-03-24.pdf22 Apr 2024
Certificates of CA (Form 3)File: Form 3-Songbirds Estate Phase I.pdf22 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Other organisation.pdf22 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESD_SB_Form 1_SB Estate Phase I-2 Villas_30-09-23.pdf18 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESD_SB_Form 2_SB Estate Phase I-2 Villas_30-09-23.pdf18 Oct 2023
Certificates of CA (Form 3)File: ESD_SB_Form 3_SB Estate Phase I-2 Villas_30-09-23_05-10-23.pdf18 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ESD_SB_Form 1_SB Estate Phase I-2 Villas_09-07-23.pdf17 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESD_SB_Form 2_SB Estate Phase I-2 Villas_09-07-23.pdf17 Oct 2023
Certificates of CA (Form 3)File: ESD_SB_Form 3_SB Estate Phase I-2 Villas_09-07-23_10-07-23.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Songbirds Estate Phase I.pdf16 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-SB Estate Phase I-31-03-23.pdf12 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-SB Estate Phase I-31-03-23.pdf12 May 2023
Certificates of CA (Form 3)File: Form 3-SB Estate Phase I-31-03-23.pdf12 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 5-ESD Songbirds Estate Phase I.pdf27 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE_ESD ESTATE PHASE I-10-04-2020.pdf6 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE_ESD PHASE I-10-12-2021.pdf6 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE_ESD PHASE I-15-04-2021.pdf6 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE_ESD_ESTATE PHASE I-10-04-2019.pdf6 Jan 2023
Certificates of CA (Form 5)File: ESD Songbirds Estate Phase I.pdf6 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance declaration.pdf28 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Finance Encumbrance declaration.pdf28 Jul 2022
Deviation Report with respect to Allotment letterFile: RERA-Allotment Letter Format.pdf28 Jul 2022
Deviation Report with respect to model copy of AgreementFile: Agreement Draft.pdf28 Jul 2022
Declaration about Commencement CertificateFile: DECLERATION CC.pdf8 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate.pdf8 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate.pdf8 Jun 2022
CERSAI detailsFile: SELF DECLERATION.pdf8 Jun 2022
Disclosure of sold/ booked inventoryFile: DESCLOSER OF SOLD.pdf8 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 5-ESD SONGBIRD Estate PHASE I P52100000643_31-03-21.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SONGBIRDS ESTATE PHASE I 2019.PDF2 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SONGBIRDS ESTATE PHASE I 2020.PDF2 Feb 2021
Certificates of CA (Form 5)File: Form 5 Songbirds Estate Phase 1.pdf30 Sep 2018
OtherFile: Real Estate Agents.pdf10 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: SB_VILLA.pdf8 Mar 2018
Building plan approvalFile: BUILDING PLAN 10.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 11.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 20.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 12.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 13.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 14.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 15.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 16.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 17.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 18.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 19.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN_A.pdf17 Jul 2017
Layout approvalFile: LAYOUT.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 2.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 3.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 4.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 5.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 6.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 7.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 8.pdf17 Jul 2017
Building plan approvalFile: BUILDING PLAN 9.pdf17 Jul 2017
PAN CardFile: ESD_PAN.pdf17 Jul 2017
Details of encumbrancesFile: Promoter_The Songbirds Estate Phase I.PDF17 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 2.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 3.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 4.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 5.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 6.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 7.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 8.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 9.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 10.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 11.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 12.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 13.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 14.pdf17 Jul 2017
Building Plan Approval (IOD)File: BUILDING PLAN 15.pdf17 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Skyi Songbirds Phase IISr No 274 and others Village Bhugaon Tal Mulshi Dist Pune357CompletedOct 2016Late, Mar 2017
Skyi Songbirds Phase ISr No 274 and others Village Bhugaon Tal Mulshi Dist Pune388CompletedSep 2015Late, Jan 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Songbirds Estate Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

2 kmThe Songbirds Estate PhaCompleted 45Lapsed / revoked 28Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 133 registered projects within 2 km.

Builder: Enerrgia Skyi Developers

Enerrgia Skyi Developers has 12 registrations on MahaRERA, including Skyi Songbirds Phase A and Skyi Songbirds Phase B. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that The Songbirds Estate Phase I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if The Songbirds Estate Phase I is delayed beyond 31 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Songbirds Estate Phase I?

The registered promoter entity is Enerrgia Skyi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Songbirds Estate Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Songbirds Estate Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Songbirds Estate Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Songbirds Estate Phase I?

The professionals named in the filing: Architect: Earthsong; Engineer: Delcons Consultant India Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Songbirds Estate Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Songbirds Estate Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Songbirds Estate Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.