Home / Browse projects / Kolhapur, Maharashtra / THE SKYLARK
THE SKYLARK
RG-MH-70132 · RERA P53000052120 · Last updated on MahaRERA portal: 19 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE SKYLARK is a Others project by Sanjay Pandurang Gaikwad in Kolhapur, Maharashtra, registered with MahaRERA as P53000052120 on 24 Jul 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 2 of the 11 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameTHE SKYLARK
- TypeOthers
- Location
- Laxmanrao Mohite Colony
- Kadamwadi Road
- 511 E Ward New Tarabai Park
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416003
- Pincode416003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000052120
- ReraGenie IDRG-MH-70132
Builder
- NameSanjay Pandurang Gaikwad
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Jul 2023
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed88 files
Current status
Figures as on 19 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Skylark | NA | 5 | 5 | 8 | 3 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
The Skylark: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| The Skylark | NA | Rs 1.60 cr | Rs 1.59 cr |
| - | NA | Rs 11.67 lakh | Rs 11.67 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanrachna Consultants |
| Engineer | PRATIK RAJARAM PATIL Rajaram Patil |
| Chartered Accountant | J P Chougule and Companny through Partner CA Amit Madanrao Shinde |
| Partner | Role in project |
|---|---|
| Sanjay Pandurang Gaikwad | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterMy construction of real estate project is 95% complete. The remaining work of the project I required more 2 to 3 months. After that I can applied for completion certificate to Kolhapur Municipal Corporation. hence I applied for 1 year extension to MahaRERA Authority. I would greatly appreciate and request MAHARERA authority to grant me further extension of One year for completing the project and thereby submitting the Completion Certificate along with Form 4 as soon as the Kolhapur Municipal Corporation issues us the Completion certificate and Occupancy certificate for our project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_11zon (1).pdf | 19 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_11zon (2).pdf | 19 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_11zon (1).pdf | 19 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_11zon (2).pdf | 19 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_11zon (2).pdf | 19 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_11zon (3).pdf | 19 Feb 2026 |
| Form 1File: Form 1.pdf | 5 Aug 2025 |
| Form 2File: Form 2.pdf | 5 Aug 2025 |
| Form 3File: Form 3.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf | 5 Aug 2025 |
| Form 1File: Form 1.pdf | 10 Jun 2025 |
| Form 2File: Form 2.pdf | 10 Jun 2025 |
| Form 3File: Form 3.pdf | 10 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf | 10 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Doc1.pdf | 10 Jun 2025 |
| Declaration in FORM BFile: Form B.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MahaRERA Form 5 - CA Audit Report FY 2023-2024.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2) .pdf | 23 Jan 2025 |
| Other - LegalFile: Agreement To Sell - Index-2_Hariprasad Dattatray Kulkarni_Flat No 201.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 7 Disclosure of sold booked inventory.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 27 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf | 27 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2) .pdf | 27 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 6 Disclosure of sold booked inventory.pdf | 27 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 5 Disclosure of sold booked inventory.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Architects_Certificate (1).pdf | 30 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Structural Engineer’s Certificate (1).pdf | 30 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory (1).pdf | 30 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Chartered Accountant's Certificate (1).pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Architects_Certificate.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf | 20 Oct 2023 |
| Building plan approvalFile: Commencement Certificate -SAnjay Gaikwad.pdf | 22 Jul 2023 |
| Building plan approvalFile: Old Plan-Sanjay Gaikwad.pdf | 22 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Commencement Certificate -SAnjay Gaikwad.pdf | 22 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Old Plan-Sanjay Gaikwad.pdf | 22 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: No DEviation in Agreement -Gaikwad_0001.pdf | 17 Jul 2023 |
| Other - TechnicalFile: No DEviation in Agreement -Gaikwad_0001.pdf | 10 Jul 2023 |
| Other - TechnicalFile: No DEviation in Allotment -Gaikwad.pdf | 10 Jul 2023 |
| Building plan approvalFile: Letter from KMC-Tushar Gaikwad.pdf | 8 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Letter from KMC-Tushar Gaikwad.pdf | 8 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Finance -Gaikwad05232023.pdf | 23 May 2023 |
| Details of encumbrances concerned to LegalFile: Finance -Gaikwad05232023.pdf | 23 May 2023 |
| CERSAI detailsFile: Declaration about cersai Report05232023.pdf | 23 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Gaikwad05232023.pdf | 23 May 2023 |
| Declaration about Commencement CertificateFile: Format D -New Sanjay Gaikwad04272023.pdf | 27 Apr 2023 |
| Proforma of Agreement for saleFile: fINAL Agreement upload.pdf | 27 Apr 2023 |
| Other - LegalFile: Index Before Registration.pdf | 27 Apr 2023 |
| Other - TechnicalFile: Highlighted Corporation Drawing_The Skylark_Updated_16032023 (1).pdf | 12 Apr 2023 |
| Other - TechnicalFile: Self Declaration04122023.pdf | 12 Apr 2023 |
| Layout approvalFile: Highlighted Layout Plan -Gaikwad_11zon.pdf | 28 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Highlighted Layout Plan -Gaikwad_11zon.pdf | 28 Feb 2023 |
| Building plan approvalFile: Plan_11zon (5).pdf | 27 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_11zon (5).pdf | 27 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_Gaikwad.pdf | 17 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Final Annexture A -Gaikwad.pdf | 17 Feb 2023 |
| Copy of the legal title reportFile: Legal Title Report02102023.pdf | 10 Feb 2023 |
| Declaration about Commencement CertificateFile: DEclaration about sold unit-Gaikwad02092023.pdf | 10 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEclaration about sold unit-Gaikwad02092023.pdf | 10 Feb 2023 |
| Layout approvalFile: layout.pdf | 9 Feb 2023 |
| Building plan approvalFile: Plan_11zon (5).pdf | 9 Feb 2023 |
| PAN CardFile: PAN_Sanjay Pandurang Gaikwad.pdf | 9 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Legal-Gaikwad02092023.pdf | 9 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal-Gaikwad02092023.pdf | 9 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 9 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE SKYLARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near 511 E Ward New Tarabai Park880+ in Kolhapur
Filed coordinates, straight-line distance. 101 registered projects within 2 km.
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
Loknagari Karande Mala
VIKESH ABHAYKUMAR OSWAL
KRYSTAL TOWERS
RAYSONS CONSTRUCTIONS
GAYATRI-BHAWANI APARTMENT
Vijaykumar Vasudev Patki
EMINENT VISION TOWER
ACE DEVELOPERS
THE PARKSIDE
DESHPANDE INFRA
See every Kolhapur project, with the district possession charts
Builder: Sanjay Pandurang Gaikwad
Sanjay Pandurang Gaikwad has 1 registration on MahaRERA, including THE SKYLARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that THE SKYLARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if THE SKYLARK is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE SKYLARK?
The registered promoter entity is Sanjay Pandurang Gaikwad, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE SKYLARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE SKYLARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE SKYLARK?
The professionals named in the filing: Architect: Sanrachna Consultants; Engineer: PRATIK RAJARAM PATIL Rajaram Patil; Chartered Accountant: J P Chougule and Companny through Partner CA Amit Madanrao Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE SKYLARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback