Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 62 documents Report an error

The sharon Rose is a Residential/Group Housing project by Nidhi Land Infrastructure Developers india private Ltd in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/171014/000110 on 14 Oct 2017. Possession is promised by 31 Mar 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameThe sharon Rose
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/171014/000110
  • ReraGenie IDRG-KA-54452

Builder

  • NameNidhi Land Infrastructure Developers india private Ltd
  • Entity typeCompany
  • CINU45205KA2012PTC062255
  • Authorized SignatoryPrashanth K Sanil
  • DirectorsPrashanth K sanil, Sharaschandra Sanil

Key dates

this monthRegisteredOct 2017First promiseMar 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Oct 2017
  • Promised completion31 Mar 2020
  • Revised completionRevised to 31 Mar 2020 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE SHARON ROSE---17017

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 16 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 16 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area594 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.36 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2019 → Sep 2020

No reason recorded in the filing

EX/PRM/KA/RERA/1257/334/PR/201125/000110Sep 2020 → Mar 2020

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed62

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/171014/000110 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
AFFIDAVITFile: AFFIDAVIT - SHN - EXT.pdf16 Oct 2020
ACCOUNT STATEMENT UPTODATEFile: 4752000100147701.pdf16 Oct 2020
CONSENT LETTERFile: HAIRUNISSA.jpeg16 Oct 2020
CONSENT LETTERFile: MAIMOONA CONSENT LETTER.jpeg16 Oct 2020
CONSENT LETTERFile: UMAR KUKKADI.jpeg16 Oct 2020
LICENCE IS STILL VALID HENCE ATTACHEDFile: SHN LICENCE.jpg16 Oct 2020
CertificateFile: 201616 RERA.pdf-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT CERTIFICATE.jpeg-
Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER CERTIFICATE.jpeg-
CA Certificate for Funds UtilizationFile: CA CERTIFICATE.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT CERTIFICATE.jpeg-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER CERTIFICATE (2).jpeg-
CA Certificate for Funds required for Project CompletionFile: C A CERTIFICATE.pdf-
AffidavitFile: Affidavit.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: AFFIDAVIT - SHN - EXT.pdf-
LICENCE SRN-
Plan 2-
Plan 1-
SALE DEED FORMAT-
AGREEMENT FOR SALE format-
legal opinion-
Plan 1-
Plan 1-
ALLOTMENT LETTER-
E BROCHURE -2-
LICENCE SRN-
E BROCHURE -2-
EC -
Sharon Rose Katha-
jpg2pdf (11) sale deed-
jpg2pdf (8) conversion order-
Balance Sheet 2015 - 2016File: Balance sheet.jpg-
Balance Sheet 2014 - 2015File: balance sheet.jpg-
Balance Sheet 2013 - 2014File: Balance sheet.jpg-
Audited Profit and Loss Statement 2015 - 2016File: profit and loss .jpg-
Audited Profit and Loss Statement 2014 - 2015File: Profit and loss .jpg-
Audited Profit and Loss Statement 2013 - 2014File: Profit and Loss .jpg-
Director's Report 2015 - 2016File: Director 15-16.pdf-
Director's Report 2014 - 2015File: Director 14-15.pdf-
Director's Report 2013 - 2014File: Director 13-14.pdf-
Cash Flow Statement 2015 - 2016File: Cash flow .jpg-
Cash Flow Statement 2014 - 2015File: cash flow.jpg-
Auditor's Report 2015 - 2016File: Auditors Report.PDF-
Auditor's Report 2014 - 2015File: Auditor 14-15.pdf-
Auditor's Report 2013 - 2014File: Auditor 13-14.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income tax return.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: Income tax return .jpg-
Income Tax Return Acknowledgement 2013 - 2014File: Income tax return.jpg-
Form - B 2- (1)-
Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_171014_000110.xlsx-
Stability CertificateFile: stability.jpeg-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: 3B Drainage order copy.pdf-
Occupancy CertificateFile: SHN-OC.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: 32B LicenseNOC permission for lift erection.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: 28 MESCOM approval letter.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: 3B Drainage order copy.pdf-
Details of undivided share of land handed over to the association of allotteesFile: Undivided Share.pdf-
Architect certificate for having completed the work(in format no 5)File: SHN Arch completion cert.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Shn Form 4CC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit SHN.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep The sharon Rose on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmThe sharon RoseOther 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 124 registered projects within 2 km.

Builder: Nidhi Land Infrastructure Developers india private Ltd

Nidhi Land Infrastructure Developers india private Ltd has 1 registration on RERA Karnataka, including The sharon Rose. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if The sharon Rose is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of The sharon Rose?

The registered promoter entity is Nidhi Land Infrastructure Developers india private Ltd, a company as per the filing. Its CIN U45205KA2012PTC062255 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in The sharon Rose?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in The sharon Rose?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The sharon Rose. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The sharon Rose to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.