ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / THE NILAYA

Registered No litigation declared Residential / Group Housing project

THE NILAYA

By ABHIDARSHAN CORPORATION LLP

RG-MH-17976 · RERA P51700055643 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
115 of 144Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

THE NILAYA is a Residential / Group Housing project by ABHIDARSHAN CORPORATION LLP in Thane, Maharashtra, registered with MahaRERA as P51700055643 on 5 Apr 2024. Possession is promised by 31 Dec 2027. 29 of the 144 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE NILAYA
  • TypeResidential / Group Housing
  • Location
    • Opposite Abhidarshan Garden Near Ganesh Nagar Society Mayuresh Nagar
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055643
  • ReraGenie IDRG-MH-17976

Builder

  • NameABHIDARSHAN CORPORATION LLP
  • Entity typePartnership
  • PartnerJAYANTILAL JIVRAJ PATEL

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed103 files

Current status

20%29 of 144 units booked
95.5%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 3NA262088088
MHADANA151456056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Tower 327%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MHADANot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed242

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots242
Closed/Covered38
Open Space204
BuildingClosed/CoveredOpen SpaceTotal
Tower 337110147
MHADA19495

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area642 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKalyan-Dombivli Municipal Corporation
Permissible FSI9054.06
Proposed, not sanctioned9,054 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOHINOOR INDUSTRIAL ESTATE FIRST FLOOR GOREGAON EAST MUMBAI 400063
Estimated costRs 22.05 cr
Cost incurredRs 21.06 cr
Work done95.5%
BuildingWingEstimatedIncurred
Tower 3NARs 14.55 crRs 14.00 cr
MHADANARs 5.75 crRs 5.56 cr
-NARs 1.75 crRs 1.50 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSobhana Despande
EngineerVishal Raghwani
Chartered AccountantMamta N Kholiya
Chartered AccountantUrvi Devansh Rangani
PartnerRole in project
ABHIDARSHAN CORPORATION LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf24 Jun 2026
Withdrawal Update Form 2File: Rera Form 2 - Abhidarsha - Dec 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf12 Mar 2026
Withdrawal Update Form 1File: Form-1 Q2.pdf12 Mar 2026
Withdrawal Update Form 2File: Rera Form 2 - Abhidarsha - June 2025.pdf12 Mar 2026
Withdrawal Update Form 2File: Rera Form 2 - Abhidarsha - Sep 2025.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf12 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf12 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 certificate Mar-24 THE NILAYA.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 certificate Jun-24 THE NILAYA.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 certificate Sept-24 THE NILAYA.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) THE NILYA.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) THE NILAYA.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) THE NILAYA.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 the nilaya_compressed.pdf22 Nov 2024
Building plan approvalFile: Mhada Tower (2).pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Mhada Tower (2).pdf5 Nov 2024
Layout approvalFile: Layout_1-compressed.pdf29 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout_1-compressed.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold inventry_0001.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: The Nilaya - RERA Progress Report.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (3).pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2 - Abhidarshan June 2024.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventry_0001 (3).pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: the nilaya Architects Form-1.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Form 2 -the nilaya.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: Dsclosure of sold the nilaya.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 the nilaya_compressed.pdf29 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report (22-5-24) (1).pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form-3_RERA Registration_compressed.pdf4 Apr 2024
Proforma of Agreement for saleFile: Agreement for SALE -RERA (2).pdf1 Apr 2024
Other - LegalFile: Index II of S No 194.pdf1 Apr 2024
Other - LegalFile: Index II of S No 197 2 1.pdf1 Apr 2024
Other - LegalFile: Index II of S No 197 2 2.pdf1 Apr 2024
Other - LegalFile: Index II of S No 197 2 3.pdf1 Apr 2024
Other - LegalFile: Index II of S No 228 1B.pdf1 Apr 2024
Other - LegalFile: Index II of S No 164 195.pdf1 Apr 2024
Other - TechnicalFile: Annexure - A.pdf31 Mar 2024
Other - TechnicalFile: Layout_compressed (1).pdf31 Mar 2024
Building plan approvalFile: Tower-1 (A,B,C) Sheet No 11.PDF20 Mar 2024
Layout approvalFile: Layout (6) (1).pdf20 Mar 2024
Building plan approvalFile: Tower-3 Sheet No 16.PDF20 Mar 2024
Building plan approvalFile: Tower-3 Sheet No 17.PDF20 Mar 2024
Building plan approvalFile: Tower-3 Sheet No 18.PDF20 Mar 2024
Building plan approvalFile: Podium Plan Sheet No 2.PDF20 Mar 2024
Building plan approvalFile: Podium Plan Sheet No 3.PDF20 Mar 2024
Building plan approvalFile: Podium Plan Sheet No 4.PDF20 Mar 2024
Building plan approvalFile: Podium Plan Sheet No 5.PDF20 Mar 2024
Building plan approvalFile: Podium Plan Sheet No 5.PDF20 Mar 2024
Building plan approvalFile: Podium Plan Sheet No 6.PDF20 Mar 2024
Building plan approvalFile: Basement Plan Sheet No 7.PDF20 Mar 2024
Building plan approvalFile: Tower-1 (A,B,C) Sheet No 8.PDF20 Mar 2024
Building plan approvalFile: Tower-1 (A,B,C) Sheet No 9.PDF20 Mar 2024
Building plan approvalFile: Tower 10 plans.pdf20 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout (6) (1).pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Podium Plan Sheet No 2.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Podium Plan Sheet No 3.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Podium Plan Sheet No 4.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Podium Plan Sheet No 5.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Podium Plan Sheet No 5.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Podium Plan Sheet No 6.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Basement Plan Sheet No 7.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Tower-1 (A,B,C) Sheet No 8.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Tower-1 (A,B,C) Sheet No 9.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Tower 10 plans.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Tower-1 (A,B,C) Sheet No 11.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Tower-3 Sheet No 16.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Tower-3 Sheet No 17.PDF20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Tower-3 Sheet No 18.PDF20 Mar 2024

How this compares with Thane

20%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE NILAYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Titwala7,600+ in Thane

2 kmTHE NILAYACompleted 46Lapsed / revoked 25Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: ABHIDARSHAN CORPORATION LLP

ABHIDARSHAN CORPORATION LLP has 1 registration on MahaRERA, including THE NILAYA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THE NILAYA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE NILAYA?

The registered promoter entity is ABHIDARSHAN CORPORATION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE NILAYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE NILAYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE NILAYA?

The professionals named in the filing: Architect: Sobhana Despande; Engineer: Vishal Raghwani; Chartered Accountant: Mamta N Kholiya; Chartered Accountant: Urvi Devansh Rangani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE NILAYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE NILAYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE NILAYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.